Amu Darya Basin EPSC
THE AMU DARYA BASIN OIL TENDER OF 2011
MINISTRY OF MINES
ISLAMIC REPUBLIC OF AFGHANISTAN
EXPLORATION AND
PRODUCTION SHARING CONTRACT
FOR
HYDROCARBONS EXPLORATION,
DEVELOPMENT AND PRODUCTION
26 December, 2011
Amu Darya Basin EPSC
TABLE OF CONTENTS
Page
ARTICLE I DEFINITIONS & INTERPRETATION.....................................................................2
ARTICLE II GRANT OF RIGHTS TO THE CONTRACTOR.....................................................8
ARTICLE III TERM.......................................................................................................................9
ARTICLE IV RELINQUISHMENT.............................................................................................10
ARTICLE V GENERAL OBLIGATIONS OF THE CONTRACTOR........................................12
ARTICLE VI COMMENCEMENT OF HYDROCARBONS OPERATIONS...........................19
ARTICLE VII DISCOVERY; DEVELOPMENT AND PRODUCTION....................................20
ARTICLE VIII FINANCIAL AND PERFORMANCE GUARANTEES....................................30
ARTICLE IX OBLIGATIONS OF THE MINISTRY..................................................................30
ARTICLE X ALLOCATION OF PRODUCTION.......................................................................33
ARTICLE XI FORMULA PRICE FOR HYDROCARBONS; MEASUREMENT OF
HYDROCARBONS................................................................................................................35
ARTICLE XII DOMESTIC REQUIREMENTS..........................................................................38
ARTICLE XIII PAYMENT PROCEDURE.................................................................................39
ARTICLE XIV SURFACE RENTAL FEES................................................................................40
ARTICLE XV NATURAL GAS..................................................................................................41
ARTICLE XVI INCOME TAX....................................................................................................42
ARTICLE XVII CUSTOMS DUTIES..........................................................................................43
ARTICLE XVIII EXCHANGE AND CURRENCY CONTROLS..............................................43
ARTICLE XIX TREATMENT UNDER INTERNATIONAL LAW...........................................44
ARTICLE XX TRAINING, EMPLOYMENT AND LOCAL CONTENT..................................44
ARTICLE XXI PURCHASES IN AFGHANISTAN...................................................................45
ARTICLE XXII JOINT DEVELOPMENT / UNITIZATION.....................................................46
ARTICLE XXIII HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION..................47
ARTICLE XXIV DISPUTE SETTLEMENT/ ARBITRATION..................................................50
ARTICLE XXV TERMINATION, REVOCATION AND RENEGOTIATION.........................51
ARTICLE XXVI BOOKS, ACCOUNTS AND AUDITS; RECORDS, REPORTS
AND INSPECTIONS..............................................................................................................53
ARTICLE XXVII INSURANCE AND INDEMNIFICATION...................................................55
ARTICLE XXVIII ASSIGNMENT AND SUBCONTRACTORS..............................................56
10511976v2
Amu Darya Basin EPSC
ARTICLE XXIX LAW OF THE CONTRACT............................................................................58
ARTICLE XXX FORCE MAJEURE...........................................................................................58
ARTICLE XXXI ENTIRE CONTRACT AND AMENDMENTS...............................................59
ARTICLE XXXII WAIVERS; CUMULATIVE REMEDIES.....................................................59
ARTICLE XXXIII TRANSPARENCY IN AFGHAN HYDROCARBONS
OPERATIONS........................................................................................................................60
ARTICLE XXXIV NOTICES.......................................................................................................60
ARTICLE XXXV EFFECTIVENESS AND REGISTRATION..................................................61
ARTICLE XXXVI CHANGE OF LAW.......................................................................................61
EXHIBIT A DESCRIPTION OF CONTRACT AREA
EXHIBIT B MAP OF CONTRACT AREA
EXHIBIT C ACCOUNTING PROCEDURES
EXHIBIT D FINANCIAL GUARANTEE
EXHIBIT E GENERAL PERFORMANCE GUARANTEE
EXHIBIT F LONG RANGE PLAN FOR THE TRAINING OF AFGHAN NATIONALS
EXHIBIT G BIDDING FORM
EXHIBIT H MINIMUM EXPLORATION PROGRAMME; MINIMUM PRODUCTION
REQUIREMENTS FROM DESIGNATED FIELDS
EXHIBIT I LIST OF ITEMS TO BE IMPORTED FREE OF CUSTOMS DUTIES
\j7 -ii-
10511976v2
Amu Darya Basin EPSC
EXPLORATION AND
PRODUCTION SHARING CONTRACT
THIS CONTRACT, made and entered into this 26th day of December, 2011, by and between
THE MINISTRY OF MINES OF THE GOVERNMENT OF THE ISLAMIC REPUBLIC
OF AFGHANISTAN (hereinafter referred to as the “Ministry”), acting on behalf of the
Government of the Islamic Republic of Afghanistan, and CNPCI Watan Oil and Gas Afghanistan
Ltd. (CNPCIW) (hereinafter referred to as the “Contractor”), a limited liability company duly
organized and existing under the laws of the Islamic Republic of Afghanistan (hereinafter
referred to as “Afghanistan”).
RECITALS
1. WHEREAS, the entire property in, and control of, all Hydrocarbon resources in or under
the territory of Afghanistan is exclusively vested in the State under Article 3 of the
Hydrocarbons Law 2009;
2. WHEREAS, the Ministry wishes to promote the initiation of production and processing
of the known Hydrocarbon resources to meet current and future demands for energy and
related products, services and activities and prioritize the early production of
Hydrocarbons and, in parallel with the aforementioned activities, wishes that the
Contractor use sufficient resources to thoroughly assess the Hydrocarbon potential in the
Contract Area, and the Contractor desires to join and assist the Ministry in achieving
these objectives and goals for the exploration for, and production of, the Hydrocarbon
resources within the Contract Area;
3. WHEREAS, the Contractor represents that it has the financial resources, technical
competence and professional skills necessary to carry out the Hydrocarbons Operations
hereinafter described;
4. WHEREAS, the Contractor acknowledges that it is fully familiar with the laws and
regulations of Afghanistan and that it has the means to maintain such familiarity during
the term of this Contract; and
5. WHEREAS, in accordance with the Hydrocarbons Law 2009 of Afghanistan,
Exploration and Production Sharing Contracts for Hydrocarbons may be entered into
between the Ministry and foreign or domestic contractors.
CONTRACT
NOW, THEREFORE, the Parties hereto hereby agree as follows:
•>
10511976v2 C
Amu Darya Basin EPSC
ARTICLE I
DEFINITIONS & INTERPRETATION
Definitions. In this Contract, the following terms shall have the following meanings:
“Accounting Procedures” shall mean the accounting procedures set forth in Exhibit C.
“Affiliated Entity" shall mean any entity directly or indirectly controlling, controlled by
or under common control with, a specified entity. For the purposes of this definition,
“control”, when used with respect to any specified entity, means the power to direct,
administer and dictate the policies of such entity (it being understood and agreed that it is
not necessary to own directly or indirectly fifty percent (50%) or more of such entity's
voting securities to have control over such entity, but ownership, direct or indirect, of
fifty percent (50%) or more of such entity’s voting securities shall be deemed to
constitute control).
“Appraisal Programme” shall mean the programme for appraising a Discovery
established pursuant Section 7.1.
“Appraisal Programme Budget" shall mean the estimate of the costs of all items
included in the corresponding Appraisal Programme, including both capital and operating
budgets, all in a form acceptable to the Ministry.
“Appraisal Well” shall mean a Well drilled following a Discovery for the purpose of
delineating the Hydrocarbons reservoir(s) to which the Discovery relates in terms of
thickness and lateral extent and estimating the quantity of recoverable Hydrocarbons
therein.
“Arm’s-Length Sales” shall mean sales made at arm’s length between willing and
unrelated buyers and sellers in exchange for cash, excluding sales involving barter, sales
from government to government and other transactions motivated in whole or in part by
considerations other than the usual economic incentives involved in sales of
Hydrocarbons in the international market.
“Associated Gas” shall mean Natural Gas that is produced in association with Liquid
Hydrocarbons.
“Barrel” shall mean a quantity or unit of Liquid Hydrocarbons equal to 158.9874 litres
(forty-two (42) United States gallons) at a temperature of sixty (60) degrees Fahrenheit
(15.56 degrees Centigrade) under one atmosphere of pressure.
“Baseline Environmental Assessment” shall mean a report containing a description of
the environment in the subject area prior to the commencement of Hydrocarbons
Operations, including the then existing flora and fauna, soil, air quality, underground and
surface water, landscape aesthetics, farming conditions, and socio-economic conditions in
local communities.
2
Amu Darya Basin EPSC
“Bazarkhami Block" shall mean the geographical area delineated as such in Exhibit B.
“Block’' shall mean any of the Kashkari Block, the Bazarkhami Block and the
Zamarudsay Block, and each such block shall mean the aggregate, whether continuous or
non-continuous, of its geological formations.
“CNPCI shall mean CNPC International, Ltd., a company organized and existing under
the laws of the Cayman Islands.
“Commercial Discovery'’ shall mean a discovery of Hydrocarbons which, as determined
in accordance with the provisions of Section 7.1, can be produced commercially, based
on consideration of all pertinent operating and financial data, such as Hydrocarbons
volumes, recoverable reserves, sustainable production levels and other relevant technical
and economic factors, according to International Best Practices.
“Contract" shall mean this Exploration and Production Sharing Contract, including all
Exhibits hereto, as the same may be amended from time to time.
“Contract Area" shall mean the area described as such in Exhibit A and delineated as
such in Exhibit B, including all three Blocks, as the same may be reduced by
relinquishments made in accordance with the terms of this Contract.
“Contractor” shall mean the limited liability company designated as such in the
preamble or any of its permitted successors or assigns.
“Cost Recovery Hydrocarbons” shall mean the Hydrocarbons received by the
Contractor in recovery of Hydrocarbons Operations Expenditures in accordance with the
provisions of Section 10.1 (b).
“Customs Duties” shall mean all duties, taxes or imposts (except charges paid to the
Government for actual services rendered, such as normal handling and storage charges)
which are payable as a result of the importation or exportation of the item or items under
consideration in accordance with the classification and rates stated in the Customs Tariff.
“Customs Tariff’ shall mean the customs tariff enacted in accordance with the Customs
Law of Afghanistan, as amended or replaced and in effect from time to time, specifying
the tariff classification of goods in accordance with the Harmonized System of the World
Customs Organization and the rates to be used in assessing any corresponding import or
export duties thereon.
“Dayf shall mean a calendar day.
“Delivery Point” shall mean the point or points at which Hydrocarbons reach the outlet
flange of the Hydrocarbon delivery facility as specified in the Development Programme,
or such other point or points as may be agreed by the Ministry and the Contractor.
“Designated Fields” shall mean the Kashkari Field, the Angot Field, the Aq Darya Field,
the Bazarkhami Field and the Zamarudsay Field, each as described in Exhibits A and B
3
Amu Darya Basin EPSC
and as may be further delineated in accordance with the provisions of Section 7.1 (k), as
to which a Commercial Discovery shall be deemed to exist as of the Effective Date.
“Development and Production Operations” shall mean all Hydrocarbons Operations in
and relating to a Field, including those conducted to facilitate the extraction of
Hydrocarbons.
“Development and Production Phase’' shall mean the period referred to in Section
3.1(b).
“Development Programme” shall mean the programme for developing a Field
established pursuant to Section 7.1.
“Development Programme Budget” shall mean the estimate of the costs of all items
included in the corresponding Development Programme, including both capital
investment requirements and operating budgets, operating costs and sales revenues, and
the anticipated type and source of financing, all in a form acceptable to the Ministry.
“Discovery" shall mean a structure or accumulation or group of structures or
accumulations proved by drilling to be bearing Hydrocarbons, whether deemed to be
subject of commercial development or not, including any extension of a previous
Discovery.
“Effective Date" shall mean December 26, 2011.
“Environmental Impact Assessment” shall mean a report containing a description of
the ecosystem in the subject area prior to the commencement of Hydrocarbons
Operations, including the flora and fauna, soil, air quality, underground and surface
water, landscape aesthetics, and the aspects of the ecosystem which may be affected
qualitatively and quantitatively by the Hydrocarbons Operations, the effect of said
operations on local populations, if any, and the socio-economic conditions of those
individuals.
“Exploration Operations" shall mean geological studies, geochemical studies,
geophysical studies, aerial mapping, seismic surveys, investigations relating to the
subsurface geology including structure test drilling, stratigraphic test drilling, drilling of
Exploration Wells, and other related activities such as surveying, drill site preparation
and all work necessarily connected therewith, that is conducted in connection with
Hydrocarbons exploration.
“Exploration Phase" shall mean the period referred to in Section 3.1(a).
“Exploration Well" shall mean a Well drilled in the course of Exploration Operations,
where the target or objective of such well is outside or at a different depth of horizon of
the known accumulations.
“Field" shall mean a Designated Field or other area, as designated by agreement between
the Ministry and the Contractor, relating to the same geological structures or
4
SNS
Amu Darya Basin EPSC
accumulations, where a Commercial Discovery of Liquid Hydrocarbons or Natural Gas
has been declared.
“Financial Guarantee” shall mean a standby letter of guarantee in the amount
determined in accordance with Exhibit H.I, in the form attached hereto as Exhibit D or in
a reasonably similar form acceptable to the Ministry, issued by a first class international
bank acceptable to the Ministry.
“First Extension Period” shall have the meaning set forth in Section 3.1(a).
“Force Manure’" shall have the meaning set forth in Article XXX.
“Formula Price” shall mean, in the case of Liquid Hydrocarbons, the price determined
in accordance with the formula set forth in Section 11.1, and in the case of Natural Gas,
the price determined in accordance with Section 11.5.
“General Performance Guarantee’' shall mean the guarantee by CNPCI of the
Contractor’s obligations hereunder, in the form attached hereto as Exhibit E, to be
executed and delivered to the Ministry simultaneously with the execution of this
Contract.
“Government” shall mean the Government of the Islamic Republic of Afghanistan.
“Gross Contractor Revenues” shall mean, as of any date, the aggregate value of Cost
Recovery Hydrocarbons (such value determined pursuant to Section 10.1(b)) and Net
Hydrocarbons (such value determined in accordance with the applicable Formula Price)
allocated to the Contractor up to such date in accordance with Section 10.1 and any other
proceeds derived from Hydrocarbons Operations as set forth in the Accounting
Procedures.
“Hydrocarbons” shall mean Liquid Hydrocarbons and Natural Gas.
“Hydrocarbons Law" shall mean the Hydrocarbons Law 2009 of Afghanistan, as
amended or replaced and in effect from time to time.
“Hydrocarbons Operations” shall have the meaning given to it in the Hydrocarbons
Law, but shall not include transportation of Hydrocarbons beyond the Delivery Point.
“Hydrocarbons Operations Expenditures” shall mean expenditures made in
conducting Hydrocarbons Operations hereunder, as determined in accordance with the
Accounting Procedures.
“Hydrocarbons Register” shall mean the registration of documents, reports and records
of Hydrocarbons established in accordance with Article 6 of the Hydrocarbons Law.
“Income Tax" shall mean the tax imposed on net income pursuant to the Income Tax
Law 2009 of Afghanistan, as amended or replaced and in effect from time to time.
3
s 5
Amu Darya Basin EPSC
initial Commercial Production” shall mean, with respect to any Field, the date on
which the first regular shipment of Liquid Hydrocarbons or Natural Gas, or both, is made
from such Field under a programme of regular production hereunder.
“Initial Exploration Period” shall have the meaning set forth in Section 3.1(a).
“International Best Practices” shall mean such practices, methods, standards (such as
API, GB, BSI, etc.) and procedures generally accepted and followed internationally by
prudent, diligent, skilled and experienced operators in Hydrocarbons Operations,
including practices, methods, standards and procedures intended to (a) conserve
Hydrocarbons by maximizing the recovery of Hydrocarbons in a technically and
economically sustainable manner, with a corresponding control of reserves decline and
minimization of losses at the surface; (b) promote operational safety and prevention of
accidents; and (c) protect the environment by minimizing the impact of Hydrocarbons
Operations thereon.
“Kashkari Block" shall mean the geographical area delineated as such in Exhibit B.
“Licence'7 shall mean the licence certifying that the Contractor holds this Exploration and
Production Sharing Contract and is therefore entitled to conduct Hydrocarbons
Operations within the Contract Area.
“Liquid Hydrocarbons” shall mean crude mineral oil, asphalt and all other kinds of
hydrocarbons and bitumen, regardless of gravity, which are produced at the wellhead in a
liquid or solid state at ambient conditions of temperature and atmospheric pressure, or
which are extracted from Natural Gas by condensation.
“Maximum Efficient Rate" shall mean the maximum rate of production of Liquid
Hydrocarbons in a Field, without excessive rate of decline of production or excessive loss
of reservoir pressure, and in accordance with International Best Practices and the
provisions of Section 7.2(b).
“Minimum Exploration Programme" shall mean the minimum work commitment for
Exploration Operations undertaken by the Contractor during the Exploration Phase as set
forth in Part I of Exhibit H.
“Minimum Production Requirements" shall mean the minimum cumulative production
requirements from each of the Designated Fields as set forth in Part II of Exhibit H, as
may be amended by written agreement of the Parties.
“Month" shall mean a calendar month.
“Natural Gas" shall mean any Hydrocarbons which at specified atmospheric conditions
of temperature and pressure are found in a gaseous state, and includes dry mineral gas,
including coal-based methane, wet gas and residue gas remaining after the extraction,
processing or separation of Liquid Hydrocarbons from wet gas, as well as non-
Hydrocarbon gas or gases produced in association with liquid or gaseous Hydrocarbons;
6
Amu Darya Basin EPSC
including the residue gas remaining after the condensation of Liquid Hydrocarbons, but
excluding condensed or extracted Liquid Hydrocarbons.
“Net Hydrocarbons” shall mean, for any Month, the total quantity of Hydrocarbons
produced and saved in such Month and not used in Hydrocarbons Operations or flared or
re-injected into the Contract Area, after deduction of the Royalty and the Cost Recovery
Hydrocarbons.
“Net Taxable Income'7 shall mean net taxable income as determined in accordance with
the provisions of the Income Tax Law 2009 of Afghanistan, as amended and in effect
from time to time.
“Non-Associated Gas” shall mean Natural Gas that is produced without association with
Liquid Hydrocarbons or in association with Liquid Hydrocarbons that cannot be
produced commercially.
“Parties” shall mean the Ministry and the Contractor and their permitted successors and
assigns.
“Person-in-Charge” shall mean a competent person appointed by the Contractor to be in
charge of all Hydrocarbons Operations hereunder.
“Quadrant” shall mean the area demarcated by five (5) minutes of longitude and five (5)
minutes of latitude. Quadrants containing known hydrocarbon accumulations are
identified in Exhibits A and B.
“Quarter” shall mean a period of three (3) consecutive Months commencing with the
first day of January, April, July or October of any Year.
“RGIIP” means Natural Gas initially in place and having a reasonable certainty of being
recoverable under existing economic and political conditions, using existing technology.
“ROUP” means Liquid Hydrocarbons initially in place and having a reasonable certainty
of being recoverable under existing economic and political conditions, using existing
technology.
“Royalty” shall mean, with respect to any Month, fifteen percent (15%) of the
Hydrocarbons produced and saved in such Month from the Contract Area and not used in
Hydrocarbons Operations or flared or re-injected into the Contract Area, which is
allocated to the Ministry before allocation to the Contractor of the Cost Recovery
Hydrocarbons, all as set forth in Article X.
“Second Extension Period” shall have the meaning set forth in Section 3.1(a).
“State” shall mean the Islamic Republic of Afghanistan.
“U.S. Dollars” or “USS” shall mean the lawful currency of the United States of America.
7
Amu Darya Basin EPSC
“Watan” shall mean Watan Oil and Gas Limited, a company organized and existing
under the laws of Afghanistan.
“Well” shall mean any opening in the ground made or being made by drilling or boring,
or in any other manner, for the purpose of exploring for and/or producing Hydrocarbons,
or for the injection of any gas or fluid into an underground deposit, other than a seismic
hole or a stratigraphic test hole.
“Work Programme” shall mean the quarterly or annual work programme prepared by
the Contractor pursuant to Section 5.3, as applicable, itemizing the Hydrocarbons
Operations to be carried out in the Contract Area during the specified period.
“Work Programme Budget” shall mean the estimate of the cost of all items included in
the corresponding Work Programme, including both capital and operating budgets, all in
a form acceptable to the Ministry.
“Year” shall mean a period of twelve (12) consecutive Months, commencing January 1st
and ending December 31st, except that the first Year shall begin on the Effective Date
and end on December 31, 2012.
“Zamarudsav Block” shall mean the geographical area delineated as such in Exhibit B.
1.2 Interpretation. Unless the context otherwise requires:
(a) the word “including” means including, without limitation; words in the singular
include the plural and words in the plural include the singular; and the words
“hereof5, “herein” and “hereunder” refer to this Contract as a whole;
(b) references herein to Articles, Sections and Exhibits are to the Articles, Sections
and Exhibits of this Contract;
(c) the headings of this Contract are included for purposes of convenience only and
are not to be used in the interpretation of this Contract; and
(d) any agreement, instrument or statute defined or referred to herein or in any
instrument or certificate delivered in connection herewith means such agreement,
instrument or statute as from time to time amended, modified, supplemented or
replaced.
ARTICLE II
GRANT OF RIGHTS TO THE CONTRACTOR
2.1 Exclusive Rights. Subject to the terms and conditions set forth in this Contract, the
Ministry grants to the Contractor the exclusive right to conduct Hydrocarbons
Operations within the Contract Area for the duration of this Contract. The Contractor
shall acquire a share of extracted Hydrocarbons as set out herein and shall, except as
8
Amu Darya Basin EPSC
provided in Sections 12.1, 12.3 and 12.5, have the right, during the term of this
Contract, to freely take, sell and export such share.
2.2 Sole Risk, Cost and Expense. Except as otherwise expressly provided in this Contract,
the Contractor shall conduct all Hydrocarbons Operations hereunder at its sole risk, cost
and expense. The Contractor shall look only to the Hydrocarbons to which it is entitled
under this Contract to recover such costs and expenses, and such Hydrocarbons shall be
the Contractor's sole source of compensation for Hydrocarbons Operations hereunder.
2.3 Independent Contractor. The Contractor shall be responsible to the Ministry for the
execution of all Hydrocarbons Operations in accordance with the provisions of this
Contract. Without prejudice to the Contractor’s position as an independent contractor
hereunder, the extent and character of such work to be done by the Contractor shall be
subject to the general supervision, review and approval of the Ministry, to which the
Contractor shall report and be responsible as set forth herein and in the applicable
legislation and regulations.
ARTICLE III
TERM
3.1 Parts of Contract Area Outside of Designated Fields. The following provisions shall
apply to all parts of the Contract Area outside of the Designated Fields:
(a) The Contractor is authorised to conduct Exploration Operations during an
Exploration Phase, which shall be comprised of (i) an initial exploration period of
four (4) Years and six (6) Months (“Initial Exploration Period”) commencing on
the Effective Date, and (ii) subject to the conditions hereinafter provided, two (2)
successive extension periods (“First Extension Period” and “Second Extension
Period”) of two (2) Years each. Such extension periods shall be granted to the
Contractor upon the Contractor’s request delivered to the Ministry not later than
ninety (90) Days prior to the expiration of the then current period, subject to the
Contractor having fulfilled its obligations under this Contract for the then current
period, including the relinquishment provisions of Article IV, and having
submitted with such application a Work Programme and Work Programme
Budget, as well as a Financial Guarantee for an amount equal to the estimated
expenditures associated with the Minimum Exploration Programme for the period
of extension, all of which is to be consistent with the undertakings set forth in
Article VI.
(b) If a Commercial Discovery is made, the Contractor shall commence Development
and Production Operations (the “Development and Production Phase”) in respect
of the Field where such Commercial Discovery has occurred, subject to the
Ministry's approval of a Development Programme and Development Programme
Budget in accordance with Section 7.1(h)(ii).
9
Amu Darya Basin EPSC
(c) If at the end of the Exploration Phase, no Commercial Discovery has been made
in any part of the Contract Area outside of the Designated Fields, this Contract
shall automatically terminate for all parts of the Contract Area other than the
Designated Fields, provided that the Ministry undertakes to grant an extension for
such period, and for such area as may be necessary (i) for the Contractor to
complete the drilling, testing, appraisal or plugging of any Well actually being
drilled, tested, appraised or plugged at the end of the Exploration Phase and (ii)
for the Ministry and the Contractor to determine that a Discovery resulting from
such a Well is a Commercial Discovery pursuant to Section 7.1.
(d) In the event of a Commercial Discovery, the extent of the area capable of
production of Hydrocarbons from the formation or formations so identified shall
be determined in accordance with the provisions of Section 7.1 or Article XV.
The area so determined shall thereupon be converted automatically into a Field,
with effect from the date of the declaration of the Commercial Discovery. The
term of the Development and Production Phase for each Field shall extend for a
maximum of twenty-five (25) years from the date the Discovery was made.
(e) In the event that the Contractor has fulfilled all its obligations for the specified
term of the Contract, the Contractor may request an extension of the Development
and Production Phase for a further period not exceeding ten (10) years. The
Ministry shall consider any such request in accordance with the provisions of the
Hydrocarbons Law.
3.2 Designated Fields. In the case of the Designated Fields, the duration of this Contract
shall not exceed twenty-five (25) years from the Effective Date.
ARTICLE IV
RELINQUISHMENT
4.1 Exploration Phase. During the Exploration Phase, the Contractor shall relinquish to
the Ministry parts of the original Contract Area as follows:
(a) subject to Section 4.1(d), on or before the end of the Initial Exploration Period,
the Contractor shall relinquish at least twenty percent (20%) of the original area
of each Block that has not been converted into a Field; provided, however, that for
each Block in which the Contractor has not drilled at least one (1) Exploration
Well, the Contractor shall relinquish at least fifty percent (50%) of the original
area of such Block that has not been converted into a Field;
(b) subject to Section 4.1(d), on or before the end of the First Extension Period, the
Contractor shall relinquish at least an additional area equal to twenty percent
(20%) of the remaining area of each Block that has not been converted into a
Field; provided, however, that for each Block in which the Contractor has not
drilled at least one (1) Exploration Well during the First Extension Period or at
10
Amu Darya Basin EPSC
least two (2) Exploration Wells during the Initial Exploration Period, the
Contractor shall relinquish at least fifty (50%) of the remaining area of such
Block that has not been converted into a Field;
(c) subject to Section 4.1(d), at the end of the Exploration Phase, the Contractor shall
relinquish the remainder of each Block that has not been converted into a Field or
has not had a Discovery which is under evaluation for development; and
(d) the provisions of this Section 4.1 shall not be read or construed as requiring the
Contractor to relinquish any portion of the Contract Area corresponding to a
Discovery that has been converted to a Field or is under evaluation for
development.
4.2 Size and Shape of Relinquished Areas. The size and shape of the part or parts of the
Contract Area to be relinquished shall be determined by the Contractor; provided,
however, that:
(a) the Contractor shall advise the Ministry at least ninety (90) Days prior to the date
of relinquishment which parts of the Contract Area the Contractor wishes to
relinquish;
(b) the Contractor shall consult with the Ministry regarding the shape and size of each
individual portion of the areas being relinquished; and
(c) unless the Ministry expressly allows otherwise, the area being relinquished shall
not be divided into more than two portions per Block, each of which shall
comprise, and be defined by reference to, graticular sections as described in
Exhibit B, save where no such area or areas can be identified for relinquishment
in accordance with this Section without including in such area or areas in whole
or in part a Field or area in which a Discovery has been made which the
Contractor is not otherwise required to relinquish hereunder. Each such
relinquished individual portion shall be not less than twenty percent (20%) of the
area in the Block in question being relinquished at such time with sides parallel to
the boundaries of such Block, to the extent that the boundaries of such Block
permit, and with the longest side not more than three times as long as the shortest
side, and shall in any event be of sufficient size and convenient shape to enable
Hydrocarbons Operations to be conducted thereon.
4.3 Voluntary Relinquishment. The Contractor shall have the right to relinquish all or any
part of the Contract Area upon at least ninety (90) Days written notice to the Ministry.
In the event of partial relinquishment pursuant to this Section 4.3, the area relinquished
shall be credited against that portion of the Contract Area which the Contractor is next
required to relinquish pursuant to Section 4.1.
4.4 Compliance with Obligations. No relinquishment made in accordance with this
Article IV shall relieve the Contractor of: (a) its obligation to make payments due as a
result of surface rental fees incurred prior to the date of any such relinquishment; (b) its
obligation to comply with the Minimum Exploration Programme and Minimum
11
Amu Darya Basin EPSC
Production Requirements; or (c) any other obligation which may have accrued prior to
the date of relinquishment.
4.5 Clean-up and Restoration. Upon relinquishment of any area, the Contractor shall
perform all necessary clean-up activities and undertake all necessary restoration
measures in accordance with International Best Practices and the prevailing legislation,
and shall take all other action necessary to prevent hazards to the environment, flora and
fauna, the local community, human health and life or third-party property.
ARTICLE V
GENERAL OBLIGATIONS OF THE CONTRACTOR
5.1 Conduct of Hydrocarbons Operations. The Contractor shall be responsible for
conducting all Hydrocarbons Operations within the Contract Area diligently,
expeditiously and efficiently in accordance with International Best Practices and the
prevailing legislation and pursuant to Work Programmes and Work Programme Budgets
approved in accordance with Section 5.3. Without limiting the generality of the
foregoing, the Contractor shall:
(a) advance all necessary funds and purchase or lease all technology, equipment,
machinery, materials and supplies required to be purchased or leased in
connection with Hydrocarbons Operations and furnish all other funds for the
performance of Hydrocarbons Operations as may be required, including payment
to third parties that perform services as contractors or subcontractors to the
Contractor;
(b) furnish all technical expertise and assistance, including foreign personnel,
required for the conduct of Hydrocarbons Operations;
(c) ensure that all equipment, materials, supplies, plant and installations used by the
Contractor, its contractors and subcontractors comply with International Best
Practices and are of proper construction and kept in good working order;
(d) ensure that all Exploration Wells with significant shows of Hydrocarbons are
properly tested;
(e) engage one or more internationally recognized, unaffiliated third parties through a
competitive bidding process to provide at least sixty percent (60%) of the Well
tests and at least sixty percent (60%) of the wireline logs within the Designated
Fields for the first two (2) Years. (The Parties agree that the Contractor may
amend its procurement program to accomplish the above commitment);
(f) use the resources in the Contract Area as productively as practicable, prevent
damage to producing formations, and ensure that Hydrocarbons discovered,
drilling fluids, mud or any other waste (solid or fluid) do not escape and are not
wasted;
> 12
Amu Darya Basin EPSC
(g) use its best efforts to prevent damage to Hydrocarbon and water-bearing strata
that are adjacent to a producing formation, and prevent water from entering any
strata-bearing Hydrocarbons, except where water injection methods are used for
enhanced recovery operations or are intended otherwise in accordance with
International Best Practices;
(h) take all measures in accordance with International Best Practices to (i) protect the
environment such as to minimise any damage to flora and fauna and any other
pollution of the environment in accordance with applicable law, (ii) avoid flaring
of Natural Gas unless expressly authorised by the Ministry and (iii) secure the
safety, health and welfare of persons engaged in Hydrocarbons Operations and the
public;
(i) to the extent possible, prevent or mitigate any risks arising from Hydrocarbons
Operations;
(j) comply with laws relating to employment when employing domestic or foreign
staff, provide acceptable working conditions and living accommodations, and
access to medical attention and nursing care, for all personnel employed by it, its
contractors and its subcontractors in Hydrocarbons Operations, and otherwise
ensure that international norms related to labour, social protection and human
rights are respected and that no child labour or forced labour is used in connection
with Hydrocarbons Operations;
(k) comply with the applicable environmental laws and regulations of Afghanistan;
and
(l) have no less than four (4) drilling rigs (or drilling/service rigs) or three (3) drilling
rigs (or drilling/service rigs) and one set of 2D (or 3D) seismic equipment in the
Contract Area no later than December 31, 2012, and if the Contractor complies
with this Section 5.1(1), its taxable income shall be subject to the then prevailing
Income Tax rate for the term of the Contract, without stabilization.
The Contractor Representatives. The Contractor shall appoint and notify the Ministry
of the name of a Person-in-Charge, who shall ensure to the best of his ability that he and
all workers in his charge know and comply with all relevant laws and regulations, and
with any safety manual that is applicable to the operations under his control.
Appointment of the Person-in-Charge shall be done prior to commencement of the
Hydrocarbons Operations and the Ministry shall be notified of the name and address of
that person as soon as possible thereafter. Furthermore, the Contractor shall appoint and
notify the Ministry of the names of a legal representative and an alternate legal
representative. The representative and the alternate legal representative shall have an
office in an adequate location in Afghanistan for exercising the tasks of such
representatives, be residents in Afghanistan with legal address and have full authority to
represent the Contractor for all purposes of this Contract. Notification of
representatives and the Person-in-Charge is to be made within thirty (30) Days after the
Effective Date. In the event of replacement of such representatives and/or Person-in-
Amu Darya Basin EPSC
Charge, such replacement shall be similarly notified to the Ministry upon the effective
date of the replacement.
5.3 Work Programmes and Budgets.
(a) The Contractor shall prepare and submit to the Ministry for approval the
following Work Programmes and Work Programme Budgets for Hydrocarbons
Operations and Hydrocarbons Operations Expenditures within the time periods
specified:
(i) no later than one (1) month after the Effective Date, a quarterly Work
Programme and Work Programme Budget for the period beginning on the
Effective Date and ending on March 31, 2012;
(ii) no later than February 29, 2012, a quarterly Work Programme and Work
Programme Budget for the period beginning on April 1, 2012 and ending
on June 30, 2012;
(iii) no later than May 31,2012, a quarterly Work Programme and Work
Programme Budget for the period beginning on July 1, 2012 and ending
on September 30, 2012;
(iv) no later than August 31, 2012, a quarterly Work Programme and Work
Programme Budget for the period beginning on October 1,2012 and
ending on December 31, 2012; and
(v) at least ninety (90) Days prior to the beginning of each Year commencing
on or after January 1, 2013, an annual Work Programme and Work
Programme Budget for Hydrocarbons Operations and Hydrocarbons
Operations Expenditures by Quarter, setting forth the Hydrocarbons
Operations the Contractor proposes to carry out during the ensuing Year.
(b) Notwithstanding any other provision of this Contract, each respective Work
Programme and Work Programme Budget prepared and submitted pursuant to
Section 5.3(a) shall include the quarterly forecast statement described in Section
7.2(c), the quarterly estimates described in Section 10.3, and the portion of the
annual training programmes described in Sections 20.1 and 20.2 to be carried out
during the period covered by the Work Programme and Work Programme Budget.
The Ministry and the Contractor shall promptly agree on each Work Programme
and Work Programme Budget submitted pursuant to Section 5.3(a).
(c) To the maximum extent practicable, the Contractor shall involve representatives
of the Ministry in the preparation of the Work Programmes and Work Programme
Budgets.
14
Amu Darya Basin EPSC
(d) Each Work Programme and Work Programme Budget shall comply with the
Minimum Exploration Programme and the Minimum Production Requirements,
as well as with International Best Practices and the prevailing legislation and
regulations.
(e) Approval by the Ministry of the proposed Work Programmes and Work
Programme Budgets will not be unreasonably withheld or delayed.
(f) Should the Ministry wish to propose revisions to the annual Work Programme or
Work Programme Budget, it shall within thirty (30) Days after receipt thereof so
notify the Contractor, specifying in reasonable detail its reasons therefor.
Promptly thereafter, the Parties shall meet and endeavour to agree on the revisions
proposed by the Ministry.
(g) If the Contractor and the Ministry fail to agree upon any revisions proposed by the
Ministry within sixty (60) Days of the receipt of the Contractor’s proposals, the
points of disagreement shall be resolved as follows:
(i) with respect to annual Work Programmes and Work Programme Budgets
that relate to Exploration Operations, the Contractor’s proposals, revised
in accordance with any agreed amendments or additions thereto, shall be
deemed adopted, provided that they are in compliance with Section 5.3(d);
and
(ii) with respect to annual Work Programmes and Work Programme Budgets
that relate to Development and Production Operations, the Contractor’s
proposals, revised in accordance with any agreed amendments or additions
thereto, shall be deemed adopted provided that they are consistent with the
Development Programme and Development Programme Budget adopted
pursuant to Section 7.1 (h)(ii) or Section 7.1(k), as applicable, and are in
compliance with Section 5.3(d).
(h) The Parties recognize that the details of a Work Programme may require changes
in light of the then prevailing circumstances. In such event, the Contractor may
introduce such changes as may be necessary, following consultation with the
Ministry, but subject to the following:
(i) in the case of changes to a Work Programme and Work Programme
Budget relating to Exploration Operations, such changes may be
implemented provided that compliance with Section 5.3(d) is maintained;
(ii) in the case of changes to a Work Programme and Work Programme
Budget relating to Development and Production Operations, such changes
may be implemented to the extent that they are not inconsistent with the
applicable Development Programme and Development Programme
Budget adopted pursuant to Section 7.1(h)(ii) or Section 7.1 (k), as
applicable, and compliance with Section 5.3(d) is maintained.
X 15
VV3
Amu Darya Basin EPSC
Drilling Operations.
(a) The Contractor is required to design Wells and conduct drilling operations,
including the casing, cementing and plugging of Wells, in accordance with
International Best Practices.
(b) Every Well in the Contract Area shall be identified by name, number and
geographic co-ordinates, which shall be shown on maps, plans and similar records
that the Contractor shall keep and submit to the Hydrocarbon Data Bank.
(c) Prior to commencing the drilling of any Well or re-entering any Well on which
work has been discontinued for more than ninety (90) Days, the Contractor shall
give the Ministry written notice no later than seven (7) Days before such work
shall commence and submit a proposed Well programme. The proposal shall
include the following information:
(i) the official name and number of the Well and a description of its precise
location by reference to geographical coordinates;
(ii) a detailed work programme describing the drilling technique to be
employed and all ancillary operations (including casing, cementing, mud,
coring, logging, Well control and testing), an estimate of the time to be
taken and depth objective, the estimated costs of the Well programme, and
the safety measures to be employed in the drilling of the Well;
(iii) a summary of the geological and geophysical data, and any interpretations
thereof, upon which the Contractor made the decision to drill or
commence work on the respective Well (accompanied by appropriate
maps and cross-sections);
(iv) the name of the drilling contractor, if applicable, and designation of the
drilling rig; and
(v) the name of other service companies to be employed, together with a brief
description of the equipment and services, if applicable, to be provided.
(d) In case any work related to any Well is suspended for a period exceeding thirty
(30) Days, the Contractor shall notify the Ministry in writing to that effect.
(e) The Contractor shall give forty-eight (48) hours notice in writing before
recommencing work on any Well on which work has been suspended for more
than thirty (30) Days but for less than ninety (90) Days.
(f) The Contractor shall not, without the prior written approval of the Ministry, drill
any Well from any surface area within the Contract Area which is less than five
hundred (500) meters from a boundary of the Contract Area, or from within the
Contract Area through any vertical boundary of the Contract Area.
16
Amu Darya Basin EPSC
(g) The Contractor shall securely plug and clearly mark any Well that it abandons, in
accordance with International Best Practices, to prevent pollution and damage to
the deposit and underground strata through the entry of water or otherwise. The
Contractor shall, except when the Ministry otherwise directs or this Contract
otherwise provides, remove all equipment, materials and facilities relating thereto
and provide that cemented strings or other forms of casing shall not be withdrawn
without the written approval of the Ministry.
(h) In relation to every Well being drilled, completed, tested or abandoned, the
Contractor shall submit to the Ministry daily well reports during the conduct of
drilling operations describing the progress and results of the operations. In
addition, the Contractor shall submit a Well completion report accompanied by
copies of all logs obtained from the Well within two (2) Months from the date of
rig release of a Well.
(i) The Contractor shall, within one hundred and eighty (180) Days of the completion
of any survey, test or drilling operations, or, in the case of data that cannot
reasonably be obtained or compiled in that period, as soon as possible thereafter,
submit to the Ministry copies of all geological and geophysical data obtained by
the Contractor in the course of conducting Hydrocarbons Operations, including
any interpretations thereof and logs and records of Wells.
(j) The Contractor shall drill each Exploration Well to the depth set forth in the Well
programme, unless:
(i) formation is encountered at a lesser depth than originally anticipated;
(ii) basement is encountered at a lesser depth than originally anticipated;
(iii) in the Contractor's reasonable opinion, continued drilling of the
Exploration Well is too hazardous because of abnormal or unforeseen
conditions;
(iv) it is impractical to continue drilling because insurmountable technical
problems have been encountered;
(v) Hydrocarbons formations have been encountered, penetration of which
will require laying protective casing as a consequence of which the
Exploration Well cannot be drilled to the depth required by the Well
programme; or
(vi) the Ministry and the Contractor agree in writing to terminate the drilling
operation in respect of the Exploration Well.
(k) If the Contractor determines it is reasonable to stop drilling pursuant to Section
5.4(j), it will notify the Ministry immediately and a determination will be made
jointly as to whether to amend the Work Programme, the Minimum Exploration
Programme and Well programme accordingly to:
17
Amu Darya Basin EPSC
(i) enable successful completion of the Exploration Well;
(ii) substitute another Exploration Well; or
(iii) determine an alternative solution acceptable to the Parties.
In the event the Parties elect to substitute another Exploration Well pursuant to
Section 5.4(k)(ii), the amount guaranteed under the Financial Guarantee shall be
reduced by the cost of the abandoned Exploration Well.
5.5 Reports on Hydrocarbons Operations. The Contractor shall keep the Ministry
regularly and fully informed of the progress and results of all Plydrocarbons Operations
and shall provide the Ministry with all geologic information, data, samples,
interpretations and reports, including progress and completion reports, and keep such
original data, records and full particulars at its registered office in Afghanistan, which
are required under this Contract, the Hydrocarbons Law or applicable regulations.
5.6 Other Minerals.
(a) If, in the course of Hydrocarbons Operations, the Contractor discovers minerals
other than Hydrocarbons in the Contract Area that are of economic value and are
capable of being developed, it shall within thirty (30) Days inform the Ministry of
the minerals discovered, their location and such other information as the Ministry
may reasonably request and in addition submit a sample of the discovered
minerals to the Ministry.
(b) If, after the Effective Date, others are granted licences within the Contract Area
authorizing prospecting for, exploration for or mining of any minerals or other
substances other than Hydrocarbons, or the Ministry proceeds with such
prospecting, exploration or mining directly in its own behalf, the Contractor shall
afford proper passage for the licensee of mineral rights to the relevant parts of the
Contract Area, and use its best efforts to avoid obstruction or interference with
such licensees' or Ministry operations within the Contract Area. The Ministry
shall use its best efforts to ensure that operations of third parties do not obstruct or
interfere with the Hydrocarbons Operations within the Contract Area.
5.7 Historic and Cultural Items.
(a) If, in the course of Hydrocarbons Operations, the Contractor finds signs or marks
or discovers items of any historical or cultural significance, including fossils and
other items included on the Archaeological and Cultural Heritage list, it shall
immediately inform the Ministry of the find or discovery.
(b) The Contractor undertakes not to remove any such items as mentioned above.
The Contractor undertakes to keep any such items safe on its own account on
behalf of the State until they are transported by the relevant State authorities.
However, in case such transportation is not provided by the State within sixty (60)
18
Amu Darya Basin EPSC
Days of reporting, the subsequent expenses shall be borne by the relevant State
authority.
ARTICLE VI
COMMENCEMENT OF HYDROCARBONS OPERATIONS
6.1 Commencement of Hydrocarbons Operations. The Contractor shall commence
Hydrocarbons Operations hereunder not later than thirty (30) Days after the date that the
Ministry approves the first Work Programme and Work Programme Budget.
6.2 Baseline Environmental Assessment. Prior to commencing Hydrocarbons Operations
in any Designated Field or other area of a Block outside a Designated Field, the
Contractor shall carry out a Baseline Environmental Assessment to determine the then
prevailing situation relating to the environment, social conditions, local communities,
farming and wildlife (flora and fauna) in such Designated Field or other area.
6.3 Minimum Exploration Programme. The Contractor undertakes to carry out and
comply with the work commitments established by the Minimum Exploration
Programme. The amount estimated to be expended by the Contractor in conducting the
Minimum Exploration Programme is set forth in Part I of Exhibit H.
6.4 Minimum Production Requirements. The Contractor undertakes to meet the
Minimum Production Requirements set forth in either Option 1 or Option 2 of Part II of
Exhibit H. The Contractor shall notify the Ministry in writing of its election of either
Option 1 or Option 2 not later than six (6) Months following the Effective Date. The
Contractor’s election, once made, shall be irrevocable. The Ministry shall on the
Effective Date or as soon as practicable thereafter provide to the Contractor all
geological, geophysical, geographical, drilling, Well, production and other information,
including Well location maps relating to the Contract Area in its possession on the
Effective Date. If after performing reasonable investigation in a Designated Field,
including the services listed in Section 5.1(e), and conducting reservoir evaluations, the
Contractor considers that it would not be possible to meet the Minimum Production
Requirements, the Contractor shall notify the Ministry within ten (10) Days following
such evaluation and the Parties shall meet as soon as reasonably practicable to agree on
revised Minimum Production Requirements. In the event that no agreement is reached
between the Ministry and the Contractor within thirty (30) Days following their initial
meeting, the Ministry or the Contractor may refer the matter for expert determination
pursuant to Section 24.3. In the event the Parties fail to resolve the matter by expert
determination, the matter shall proceed to arbitration in accordance with Section 24.1.
The determination in accordance with Section 24.1 shall be final. Notwithstanding any
such evaluation by the Contractor, the Contractor shall continue with Hydrocarbons
Operations in accordance with the applicable Work Programme and Work Programme
Budget as expeditiously as possible. In the event that the Contractor fails to meet the
Minimum Production Requirements by twenty percent (20%) or less in any Field, the
Contractor shall have the option to make a financial settlement with the Ministry.
19
Amu Darya Basin EPSC
ARTICLE VII
DISCOVERY: DEVELOPMENT AND PRODUCTION
Discovery; Development.
(a) The Contractor shall immediately notify the Ministry in writing of any Discovery,
specifying all pertinent information concerning the Discovery and submitting a
sample of the Hydrocarbons discovered to the Ministry.
(b) If the Contractor determines to conduct a drill-stem or production test, in open
hole or through perforated casing, with regard to the Discovery, it shall notify the
Ministry of the time of such test at least forty-eight (48) hours prior to the
proposed test, and the Ministry shall have the right to have a representative
present during such test. Not later than one hundred and twenty (120) Days after
completion of such test, the Contractor shall complete its analysis and
interpretation of the resulting data and submit a report to the Ministry, which shall
contain copies of such data and its analysis and interpretation thereof, and which
shall also contain a written notification of whether or not, in the Contractor’s
opinion, such Discovery is of commercial interest. If the Contractor plugs and
abandons the Well which encountered such Discovery without conducting a drill-
stem or production test, or fails to conduct a drill-stem or production test within
one hundred and eighty (180) Days from the date on which such Discovery was
made, it shall be deemed to have notified the Ministry that, in the Contractor’s
opinion, such Discovery is not of commercial interest.
(c) If, pursuant to Section 7.1(b), the Contractor notifies, or is deemed to have
notified, the Ministry that such Discovery is not of commercial interest, the
Ministry shall have the option, exercisable by notice in writing to the Contractor,
to require the Contractor to relinquish the area corresponding to such Discovery
and forfeit any rights relating to such Discovery and any production therefrom;
provided, however, that for any Discovery made during the Initial Exploration
Period or any extension thereof, the Ministry shall not exercise such option until
the end of such period and shall not require the Contractor to relinquish the area
corresponding to any Discovery that has been converted to a Field during such
period or is under evaluation for development. The area subject to relinquishment
shall not exceed the vertical projection to the surface of the prospective producing
area determined by taking into account the area of the structural closure of the
prospective horizon and other relevant technical factors.
(d) If, pursuant to Section 7.1(b), the Contractor notifies the Ministry that the
Discovery is of commercial interest, the Contractor shall within ninety (90) Days
prepare and submit to the Ministry for approval an Appraisal Programme and an
Appraisal Programme Budget for the appraisal of such Discovery. Such
Appraisal Programme and Appraisal Programme Budget shall include a complete
programme of appraisal operations necessary to determine whether such
Discovery is a Commercial Discovery.
Amu Darya Basin EPSC
(e) Within thirty (30) Days after the submission of the Appraisal Programme and
Appraisal Programme Budget pursuant to Section 7.1(d), the Contractor and the
Ministry shall meet with a view to adopting such Appraisal Programme and
Appraisal Programme Budget or mutually agreeing upon amendments or
additions thereto. Failing agreement between the Contractor and the Ministry as
to such Appraisal Programme and Appraisal Programme Budget at such meeting,
or within twenty (20) Days thereafter, the original Appraisal Programme and
Appraisal Programme Budget submitted by the Contractor, revised in accordance
with any agreed amendments or additions thereto, shall be deemed adopted,
provided that it conforms to International Best Practices and the applicable
legislation and regulations, and the Contractor shall immediately commence
implementation thereof. On adoption of the Appraisal Programme and Appraisal
Programme Budget, the Work Programme and Work Programme Budget adopted
pursuant to Section 5.3 shall be revised accordingly.
(f) If, pursuant to Section 7.1(b), the Contractor has notified the Ministry that the
Discovery is of commercial interest, it shall, unless otherwise agreed:
(i) in respect of a Discovery of Liquid Hydrocarbons, advise the Ministry by
notice in writing whether or not in its opinion the Discovery is a
Commercial Discovery within a period of twelve (12) Months from the
date on which the Contractor notified the Ministry that the Discovery was
of commercial interest; and
(ii) in respect of a Discovery of Non-Associated Gas, advise the Ministry by
notice in writing whether or not in its opinion the Discovery is a
Commercial Discovery within such period as may be stipulated in an
agreement made pursuant to Article XV with respect to such Discovery or,
in the absence of such agreement, within twenty-four (24) Months from
the date on which the Contractor notified the Ministry that the Discovery
was of commercial interest.
(g) If the Contractor notifies the Ministry that the Discovery is not a Commercial
Discovery, or fails to notify the Ministry that the Discovery is a Commercial
Discovery, within the periods prescribed in Sections 7.1(f)(i) and (f)(ii), the
Ministry shall have the option, exercisable by notice in writing to the Contractor,
to require the Contractor to relinquish the area corresponding to such Discovery
and forfeit any rights relating to such Discovery and any production therefrom;
provided, however, that for any Discovery made during the Initial Exploration
Period or any extension thereof, the Ministry shall not exercise such option until
the end of such period and shall not require the Contractor to relinquish the area
corresponding to any Discovery that has been converted to a Field during such
period or is under evaluation for development. The area subject to relinquishment
shall not exceed the vertical projection to the surface of the prospective producing
area determined by taking into account the area of structural closure of the
prospective horizon and other relevant technical factors.
21
Amu Darya Basin EPSC
(h)
(i)
The notice submitted to the Ministry by the Contractor pursuant to
Sections 7.l(f)(i) and (f)(ii) shall be accompanied by a report on the
Discovery setting forth all relevant technical and economic data, including
geological and geophysical information, areas, thicknesses and extent of
the productive strata, petrophysical properties of the reservoir formations,
the reservoir’s productivity indices for the Wells tested at various rates of
flow, permeability and porosity of the reservoir formations, the relevant
characteristics and qualities of the Hydrocarbons discovered, additional
geological data and evaluations of the reservoir, Liquid Hydrocarbons and
Natural Gas reserves estimates and any other relevant characteristics and
properties of the reservoirs and fluids contained therein, as well as all
evaluations, interpretations and analyses of such data and feasibility
studies relating to the Discovery prepared by the Contractor, its
contractors, subcontractors and their respective Affiliated Entities.
In addition, if the Contractor believes that the Discovery is commercial, a
proposed Development Programme and a Development Programme
Budget for the development of such Discovery shall be submitted to the
Ministry for approval together with the report described in Section
7.1(h)(i). The Development Programme and the Development Programme
Budget shall include the following information:
a. a description and map of the area that contains such Discovery and
that the Contractor proposes to delineate as a Field. The map
should be defined by reference to graticular sections and
geological formations;
b. a detailed report, accompanied by supporting data and all analyses
and interpretations thereof, which demonstrates that the area
described in item (a) above contains, alone or in conjunction with
other areas, as the case may be, a Commercial Discovery;
c. detailed proposals for commencement and a working plan for the
operation of the Hydrocarbons Operations, including drilling
schedules, number of Wells and Well spacing, production forecasts
and a timing schedule in accordance with generally accepted
engineering practices and economics of the international petroleum
industry;
d. detailed proposals for the construction, establishment and
operation of all facilities and services for and incidental to the
development, extraction, production, storage, transportation, sale
and other disposal of Hydrocarbons and a proposed timetable for
the commencement of Hydrocarbons production, all of which shall
22
\
vw
Amu Darya Basin EPSC
ensure that the area does not suffer an excessive rate of decline of
production or an excessive loss of reservoir pressure;
e. a detailed forecast of cost estimates, capital investment
requirements, operating costs and sales revenues, and the
anticipated type and source of financing;
f. a risk management plan prepared in accordance with the
requirements of the Hydrocarbons Law and applicable regulations,
including the measures and directions established by the Ministry
to prevent any damage and remove any hazards that the
Hydrocarbons Operations may cause to affected communities, the
Contractor’s personnel and the environment;
g. an Environmental Impact Assessment;
h. an environmental management plan, including a socio-economic
management plan, prepared in accordance with the requirements of
the Hydrocarbons Law, including the measures planned for the
protection of the environment, the elimination or the reduction of
pollution and the protection and compensation of affected
populations if applicable, and the verification of the effectiveness
of such measures;
i. an emergency response plan prepared in accordance with the
requirements of the Hydrocarbons Law and applicable regulations,
including measures to respond to any accident that may occur at
the site of the Hydrocarbons Operations, medical treatment and
evacuation of employees and surrounding populations and the
protection of the environment; and
j. the Development Programme and Development Programme
Budget shall also contain particulars of feasible alternatives, if any,
considered by the Contractor for the development and exploitation
of the Discovery and economic feasibility studies carried out by or
for the Contractor with respect to the Discovery, taking into
account the location, meteorological conditions, cost estimates, the
price of Hydrocarbons and any other relevant data and evaluations
thereof.
The Ministry shall examine the report and any documents submitted pursuant to
Section 7.1(h)(ii), and may require the Contractor to provide, within a specified
period of time, such additional information and data as it may reasonably require
in order to evaluate such documents. As soon as possible after the submission of
such documents pursuant to Section 7.1 (h)(ii) or receipt of such additional
information and data, the Ministry and the Contractor shall meet to determine the
boundaries of the area to be delineated as a Field and adopt a Development
Amu Darya Basin EPSC
Programme and Development Programme Budget for the development of the
Discovery and an environmental management plan in connection therewith.
0)
(i) At the meeting described in Section 7.1 (i), the Contractor shall carefully
consider and take into account any proposals of the Ministry and the
reasons therefor and shall attempt in good faith to reach agreement with
the Ministry on the points at issue, paying particular consideration to the
objective of achieving Initial Commercial Production expeditiously from
the Field in question, taking into account generally accepted engineering
practices and economics of the international petroleum industry.
(ii) If the Ministry and the Contractor agree upon the boundaries of the area to
be delineated as a Field and upon the adoption of a Development
Programme and Development Programme Budget for the development of
the Discovery, the date upon which such agreement is reached, as
reflected in writing signed by both parties, shall be the date of the
declaration of the Commercial Discovery for all purposes of this Contract.
The area so determined shall, on such date, be automatically converted
into a Field. The Ministry shall provide the Contractor with a permit to
conduct Development and Production Operations in the Field within
fifteen (15) Days after the later of (A) the adoption of the Development
Programme and Development Programme Budget and (B) approval by the
National Environmental Protection Agency of the Contractor’s
Environmental Impact Assessment and environmental management plan.
The Contractor shall, as soon as is practicable after receipt of such permit,
commence and continuously carry out Development and Production
Operations in the Field according to the adopted Development Programme
and the Development Programme Budget. Upon adoption of the
Development Programme and the Development Programme Budget, the
Work Programme and Work Programme Budget adopted pursuant to
Section 5.3 shall be revised accordingly.
(iii) In the event that no agreement is reached between the Ministry and the
Contractor within one hundred and eighty (180) Days from the date of
submission of the report and proposed Development Programme and
Development Programme Budget pursuant to Section 7.1(h) as to (i)
matters relating to the adoption of the Development Programme and
Development Programme Budget for the development of the Discovery,
(ii) the boundaries of the area to be delineated as a Field, or (iii) the
environmental management plan, the Ministry or the Contractor may refer
the matter for expert determination pursuant to Section 24.3. In the event
the Parties fail to resolve the matter by expert determination, the matter
shall proceed to arbitration in accordance with Section 24.1. The
determination in accordance with Section 24.1 shall be final and the
Development Programme and Development Programme Budget for the
24
Amu Darya Basin EPSC
development of the Discovery and the boundaries of the area to be
delineated as a Field, as the case may be, shall be deemed to have been
adopted and agreed as determined, except that the Contractor may, within
sixty (60) Days of receipt of such determination, notify the Ministry that
the Discovery to which such Development Programme and Development
Programme Budget and area so determined relate is no longer considered
to be commercial. If the Contractor so notifies the Ministry, the
provisions of Section 7.1(g) shall apply. Failing such notification, the date
sixty (60) Days after the receipt of such determination shall be deemed to
be the date of the declaration of the Commercial Discovery for all
purposes of this Contract. The area so determined shall, on such date, be
automatically converted into a Field. The Ministry shall provide the
Contractor with a permit to conduct Development and Production
Operations in the Field within fifteen (15) Days after the later of (A) the
date a Commercial Discovery is deemed declared and (B) approval by the
National Environmental Protection Agency of the Contractor’s
Environmental Impact Assessment and environmental management plan.
The Contractor shall, as soon as is practicable after receipt of such permit,
commence and continuously carry out Development and Production
Operations in the Field according to the adopted Development Programme
and the Development Programme Budget. Upon adoption of the
Development Programme and Development Programme Budget as
aforesaid, the Work Programme and Work Programme Budget adopted
pursuant to Section 5.3 shall be revised accordingly.
In the case of each Designated Field, the Contractor shall prepare and submit to
the Ministry for approval a Development Programme and Development
Programme Budget for such Field containing the information referred to in
Section 7.1 (h)(ii) and complying with the Minimum Production Requirements for
such Field no later than twelve (12) Months prior to Initial Commercial
Production from such Field, except that:
(i) the submission for the Angot Field shall be made as soon as practicable
after the Effective Date;
(ii) where the Contractor has elected the Minimum Production Requirements
of Option 1, the submission for the Kashkari Field shall be made as soon
as practicable after the date of such election; and
(iii) where the Contractor has elected the Minimum Production Requirements
of Option 2, the submission for the Aq Darya Field shall be made as soon
as practicable after the date of such election.
The Ministry shall provide the Contractor with a temporary permit to conduct
Development and Production Operations for six (6) months in the Angot Field
and the Designated Field elected under Option 1 or 2 upon approval by the
National Environmental Protection Agency of the Contractor’s Environmental
Amu Darya Basin EPSC
Impact Assessments and environmental management plans for those Fields. The
Ministry shall provide the Contractor with a permit to conduct Development and
Production Operations for the duration of the Contract in the Angot Field and the
Designated Field elected under Option 1 or 2, respectively, within fifteen (15)
days after the adoption of a Development Programme and Development
Programme Budget for such Field. The Contractor shall, as soon as is practicable
after receipt of such permit, commence and continuously carry out Development
and Production Operations in the Field according to the adopted Development
Programme and the Development Programme Budget. Upon adoption of the
Development Programme and the Development Programme Budget, the Work
Programme and Work Programme Budget adopted pursuant to Section 5.3 shall
be revised accordingly.
(1) Notwithstanding any other provision of this Contract:
(i) with respect to any Field other than the Designated Fields, in the event that
Initial Commercial Production from such Field has not occurred within
eighteen (18) Months, in the case of a Liquid Hydrocarbons Discovery, or
sixty (60) Months, in the case of a Non-Associated Gas Discovery, from
the date of declaration of Commercial Discovery, then the Contractor shall
relinquish the area comprising such Field and shall forfeit any rights
relating to such Field and any production therefrom;
(ii) with respect to either of the Bazarkhami Field or the Zamarudsay Field, in
the event that Initial Commercial Production from such Field has not
occurred within thirty-six (36) Months after the Effective Date, then the
Contractor shall relinquish the area comprising such Field and shall forfeit
any rights relating to such Field and any production therefrom;
(iii) with respect to the Aq Darya Field, in the event that (A) the Contractor has
elected the Minimum Production Requirements of Option 1 and Initial
Commercial Production from such Field has not occurred within twenty-
four (24) Months after the Effective Date or (B) the Contractor has elected
the Minimum Production Requirements of Option 2 and Initial
Commercial Production from such Field has not occurred within twelve
(12) Months after the Effective Date, then the Contractor shall relinquish
the area comprising such Field and shall forfeit any rights relating to such
Field and any production therefrom;
(iv) with respect to the Kashkari Field, in the event that (A) the Contractor has
elected the Minimum Production Requirements of Option 1 and Initial
Commercial Production from such Field has not occurred within twelve
(12) Months after the Effective Date or (B) the Contractor has elected the
Minimum Production Requirements of Option 2 and Initial Commercial
Production from such Field has not occurred within twenty-four (24)
Months after the Effective Date, then the Contractor shall relinquish the
26
Amu Darya Basin EPSC
area comprising such Field and shall forfeit any rights relating to such
Field and any production therefrom;
(v) with respect to the Angot Field, in the event that Initial Commercial
Production from such Field has not occurred within twelve (12) Months
after the Effective Date, then the Contractor shall relinquish the area
comprising such Field and shall forfeit any rights relating to such Field
and any production therefrom; and
(vi) subject to Section 6.4 and without prejudice to Sections 7. l(l)(i) - 7.1 (l)(v)
above, in the event the Contractor has not met the Minimum Production
Requirements applicable to such Designated Field in any Year, then the
Contractor shall relinquish the area comprising such Designated Field and
shall forfeit any rights relating to such Designated Field and any
production therefrom; provided that if the Contractor is able to
demonstrate to the reasonable satisfaction of the Ministry that the
Contractor has performed the activities contemplated in the Work
Programmes in each case relating to such Designated Field, the deadline
by which the Contractor must satisfy the Minimum Production
Requirements for such Designated Field for such Year shall be extended
by the Ministry, it being understood that such extension shall not (x)
reduce the Minimum Production Requirements for such Designated Field
as may apply in respect of such Year or subsequent Years or (y) limit the
application of this Section 7.1 (l)(vi) if the Minimum Production
Requirements for such Designated Field are not satisfied by the Contractor
by the extended deadline or in respect of any subsequent Years. If the
Contractor wishes that the Ministry consider granting an extension in
respect of any Year as provided in this Section 7.1 (l)(vi), the Contractor
shall make such request to the Ministry, together with all supporting
materials, within thirty (30) Days after the end of such Year.
(m) If the Contractor is required to relinquish an area pursuant to the provisions of this
Section 7.1, ownership of all fixtures, including but not limited to pipes, pipelines,
installations, facilities, downhole well equipment, and wellhead equipment shall
be transferred to the Ministry. Leased equipment and other Contractor equipment
may be removed if such removal may be accomplished without damage to the
area.
Production.
7.2
(a) Not less than three (3) Months prior to Initial Commercial Production in any
Field, the Contractor shall submit to the Ministry for approval proposed
procedures and related operating regulations and financial terms covering the
scheduling, storage and lifting of Liquid Hydrocarbons from such Field. The
procedures, regulations and terms shall comprehend the subjects necessary to
efficient and equitable operations, including rights of parties, notification time,
maximum and minimum quantities, duration of storage, scheduling, conservation,
27
Amu Darya Basin EPSC
spillage, liabilities of the parties, through-put fees, and safety and emergency
procedures.
(b) The Contractor shall produce Liquid Hydrocarbons from the Contract Area at the
Maximum Efficient Rate. For the first Year, the Contractor and the Ministry shall
establish the Maximum Efficient Rate of production of Liquid Hydrocarbons and
the production rate for Non-Associated Gas in conjunction with the adoption of
each Development Programme submitted during such Year. Thereafter, the
Contractor and the Ministry shall establish the Maximum Efficient Rate of
production for Liquid Hydrocarbons and the production rate for Noil-Associated
Gas in conjunction with the adoption of each annual Work Programme. In the
case of Non-Associated Gas, the production rate shall not be required by the
Ministry to be less than that required to satisfy any contracts then in existence for
the sale of such Natural Gas.
(c) No later than September 30 of each Year, the Contractor shall, in accordance with
International Best Practices, prepare and furnish to the Ministry for approval a
forecast statement setting forth by Quarter the total quantity of Liquid
Hydrocarbons (by quality, grade and gravity) and Natural Gas that the Contractor
estimates can be produced, saved and transported hereunder during the ensuing
Year, together with estimates, if available, of recoverable reserves of
Hydrocarbons, broken down into proven and proven plus probable. The
Contractor shall endeavour to produce in each Year the forecast quantity. The
Liquid Hydrocarbons shall be run to storage tanks, constructed, maintained and
operated by the Contractor in accordance with applicable regulations, in which
such Liquid Hydrocarbons shall be metered or otherwise measured for all
purposes of this Contract. Natural Gas shall be stored, transported and metered or
otherwise measured in accordance with the provisions of the Natural Gas
Development Programme adopted pursuant to the provisions of Article XV.
Cessation of Production.
(a) The Contractor shall submit to the Ministry for approval a proposed Field
decommissioning and abandonment plan (the “Decommissioning and
Abandonment Plan”) after exhaustion of fifty percent (50%) of Recoverable Gas
Initially in Place (RGIIP) / Recoverable Oil Initially in Place (ROUP), or seven
(7) Years before the likely termination of production from the development area,
whichever is later, which shall include a detailed technical and engineering
description of the decommissioning, removal and disposal of the facilities and
installations, and of the site clean-up and restoration measures, consistent with
International Best Practices and with the obligations of the Contractor under
Sections 4.5, 23.2 and 25.6, together with a detailed and itemized budget of the
Hydrocarbons Operations Expenditures to be incurred in connection therewith
(the “Decommissioning and Abandonment Budget”). The Contractor and the
Ministry shall set up a joint escrow account (the “Escrow Account”) with a bank
of good international reputation (the “Bank”) to finance the Hydrocarbons
Operations Expenditures specified in the Decommissioning and Abandonment
Amu Darya Basin EPSC
Budget in accordance with Section 7.3(d). The Bank shall be located outside of
Afghanistan and shall not be an Affiliated Entity of the Contractor.
(b) No later than twelve (12) Months prior to the expiration of the Development and
Production Phase of any Field, the Contractor shall notify the Ministry of its
intention to terminate Hydrocarbons Operations. Within thirty (30) Days from the
date of the Contractor's notice under this Section 7.3(b), the Ministry shall notify
the Contractor in writing whether it will require the Contractor to carry out all or
part of the decommissioning measures set out in the Decommissioning and
Abandonment Plan. Following receipt of the Ministry’s notice, the Ministry and
the Contractor shall meet to agree upon a final Decommissioning and
Abandonment Plan and a final Decommissioning and Abandonment Budget.
(c) The Escrow Account shall be funded by monthly contributions made by the
Contractor on a unit-of-production basis until the target value of the
Decommissioning and Abandonment Budget is reached. The monthly
contribution will be calculated as follows: The amount in the Escrow Account
shall be subtracted from the Decommissioning and Abandonment Budget to
establish a net shortfall. In accordance with the methodology illustrated in
Appendix 1 to the Accounting Procedures, the net shortfall shall be divided by the
remaining RGIIP/ROIIP as of the beginning of the Month, then multiplied by that
Month’s production.
(d) The amount of the Decommissioning and Abandonment Budget, pro-rated on a
unit of production basis over the period from the date of opening of the Escrow
Account to the estimated date of cessation of production, shall be included in the
Hydrocarbons Operations Expenditures and shall be recovered by the Contractor
in accordance with Section 10.1(b). At the end of each Month in which the
Contractor shall have recovered any part of the Decommissioning and
Abandonment Budget, the Contractor shall deposit the amount so recovered in the
Escrow Account. Upon cessation of production, the Contractor shall diligently
carry out the Decommissioning and Abandonment Plan and the Hydrocarbons
Operations Expenditures due in connection therewith shall be paid by the Bank
upon receipt of a written joint instruction from the Ministry and the Bank. Any
un-spent monies remaining in the Escrow Account upon settlement of all
Decommissioning and Abandonment Expenditures shall be remitted by the Bank
to the Ministry. In the event the Ministry elects to continue Hydrocarbons
Operations in any Field following the Contractor's termination of Hydrocarbons
Operations in relation thereto, the Contractor’s liability for decommissioning
measures shall be limited to the balance of the Escrow Account.
29
Amu Darya Basin EPSC
ARTICLE VIII
FINANCIAL AND PERFORMANCE GUARANTEES
8.1 Financial Guarantee. Not later than thirty (30) Days after the Effective Date, the
Contractor shall submit a Financial Guarantee in an amount equal to the estimated
expenditures necessary to perform the Minimum Exploration Programme for the Initial
Exploration Period. If the Contractor wishes to proceed to the First Extension Period or
the Second Extension Period, as the case may be, it shall submit the corresponding
Financial Guarantee as provided in Section 3.1(a).
8.2 Reduction of Financial Guarantee. During the Exploration Phase, the amount of the
Financial Guarantee shall be reduced as of the end of each Month by the amount
actually expended on the Minimum Exploration Programme during that Month.
8.3 Drawdown. If, at the end of the Initial Exploration Period or any extension thereof, the
Contractor has not performed the Minimum Exploration Programme required for such
period, an amount corresponding to the then current balance of the Financial Guarantee
for such period shall be paid to the Ministry in accordance with Article XIII. The
Ministry shall have the right to draw down on the Financial Guarantee to collect such
amount.
8.4 Drawdown Upon Termination or Relinquishment. If, upon the date of termination of
this Contract, or upon relinquishment of the entire Contract Area by the Contractor
pursuant to Article IV, whichever first occurs, the Contractor has not completed the
Minimum Exploration Programme, an amount corresponding to the then current balance
of the Financial Guarantee shall be paid to the Ministry in accordance with Article XIII.
The Ministry shall have the right to draw down on the Financial Guarantee to collect
such amount.
8.5 General Performance Guarantee. Simultaneously with the execution of this Contract,
CNPCI is executing and delivering the General Performance Guarantee to the Ministry.
ARTICLE IX
OBLIGATIONS OF THE MINISTRY
9.1 Data. The Ministry shall supply or otherwise make available to the Contractor:
(a) all geological, geophysical, geographical, drilling, Well, production and other
information, including Well location maps, relating to the Contract Area in the
possession of the Ministry or coming into its possession and which it has the right
to disclose to the Contractor;
(b) a list of the sites of national parks and/or ecological reserves, as well as sites
identified as having Archaeological and Cultural Heritage significance, such list
30
Amu Darya Basin EPSC
to be provided prior to commencement of Hydrocarbons Operations and to
contain available details of the sites, including maps and other pertinent
information; and
(c) information reasonably available to the Ministry related to private land ownership
in the Contract Area.
9.2 Assistance. In accordance with the provisions of the Hydrocarbons Law, the Ministry
shall for the duration of this Contract:
(a) provide for the right of way and passage over State-owned land and facilitate the
right of way and passage over privately owned land in order to conduct
Hydrocarbons Operations (including nationalization to the extent permissible
under applicable law), provided that the Contractor shall bear any compensation
to the owner or occupier. Such costs and any compensation shall be considered a
Hydrocarbons Operations Expenditure recoverable by the Contractor in
accordance with Exhibit C;
(b) in respect of occupation and use of privately owned land for Hydrocarbons
Operations, and upon notice submitted by the Contractor no later than ninety (90)
Days prior to a proposed operation, obtain consent for such use from the owner or
occupier of the land in question to enable the Contractor to conduct the proposed
operations thereon, and provide the Contractor with evidence of such consent,
provided that the Contractor shall pay market prices for the use or occupation of
such land, and in the event the owner or occupier has suffered a disturbance to
activities or damage to land or assets caused by surface or sub-surface oil and gas
exploration operations, and the Contractor and the owner or occupier fail to agree
on the amount of compensation, review the matter and determine the amount of
damages in the first instance;
(c) provide reasonable access to and use of existing infrastructure and facilities in the
Contract Area, at no cost to the Contractor in the case that such infrastructure and
facilities are owned by the State;
(d) provide reasonable access to surface areas relinquished by the Contractor pursuant
to this Contract and reasonable access to and use of existing infrastructure and
facilities on such relinquished areas at no cost to the Contractor in the case that
such infrastructure and facilities are owned by the State;
(e) subject to the terms and conditions of an agreement between the Parties and the
National Environmental Protection Agency to be executed concurrently with this
Contract, assume responsibility for the rehabilitation of environmental
contamination on State owned and private land identified in Baseline
Environmental Assessments completed by the Contractor and approved by the
National Environmental Protection Agency;
31
Amu Darya Basin EPSC
(f) on the Effective Date, or no later than fifteen (15) Days thereafter, issue to the
Contractor the appurtenant exclusive Licence for Hydrocarbons Operations
certifying that the Contractor holds this Contract; and
(g) upon application in the prescribed manner and pursuant to applicable legislation,
provide or facilitate all necessary visas, work permits, import licences, export
permits (including but not limited to licences for Hydrocarbons), rights of way
and easements which (i) may be required by the Contractor and its subcontractors
in connection with the Hydrocarbons Operations and (ii) may be available from
resources within the Government’s control.
9.3 Security. The Ministry shall endeavor to provide adequate security within the Contract
Area and any other areas in Afghanistan in which Hydrocarbons Operations or
operations related thereto are conducted, including during travel to and from such areas.
However, in the event that the Contractor, in its reasonable opinion, considers the
security provided for its personnel is inconsistent with its health, safety and
environmental policies, International Best Practices or inadequate to allow
Hydrocarbons Operations to be conducted safely and without threat to life, both
Ministry and the Contractor hereby agree supplementary security measures shall be
implemented by the Contractor, as the case may be, including, but not limited to, the
engagement of competent private security providers licensed to operate in Afghanistan,
such costs to be considered Hydrocarbons Operations Expenditures if included in an
approved Work Programme and Work Programme Budget. Such arrangements shall be
revised from time to time in response to changes in security conditions, subject to an
international independent third party conducting a security review.
9.4 Responsiveness. If the Ministry’s approval is required by the Contractor in accordance
with this Contract, the Ministry shall endeavour to respond to such request as soon as
reasonably practicable. Without prejudice to any time period otherwise specified herein
or under applicable law, the Ministry’s approval for any action or item (including Work
Programmes and Work Programme Budgets) shall be deemed to have been given if the
Ministry has not notified the Contractor of its disapproval or required clarification of
such request within thirty (30) Days following the Contractor’s request for such
approval. If the Contractor requires the approval of the State or a licence or permit from
an agency of the State in relation to Hydrocarbons Operations, the Ministry shall
procure that the State or agency of the State (as the case may be) responds to such
request as soon as reasonably practicable. The Ministry acknowledges and agrees that
to the extent the Contractor is unable to carry out certain Hydrocarbons Operations as a
result of a failure by the State or agency of the State to respond to or issue any approval,
permit or license relating to Hydrocarbons Operations that any time periods applicable
to the performance of the Contractor’s obligations hereunder shall be suspended for the
period during which the Contractor is prevented from performing and that the Parties
shall meet and seek to agree to further extensions of time with regard to such delay.
3
32
Amu Darya Basin EPSC
ARTICLE X
ALLOCATION OF PRODUCTION
10.1 Royalty; Production Share. The Hydrocarbons produced and saved from the Contract
Area in any Month and not used in Hydrocarbons Operations or flared or re-injected
into the Contract Area shall be allocated as follows:
(a) The first fifteen percent (15%) of such Hydrocarbons shall be allocated to the
Ministry as the Royalty payable under the Hydrocarbons Law.
(b) After payment of the Royalty, the Contractor shall be entitled to recover
Hydrocarbons Operations Expenditures incurred by retaining and disposing of
that amount of such Hydrocarbons equal in value to the unrecovered
Hydrocarbons Operations Expenditures for that Month plus all unrecovered
Hydrocarbons Operations Expenditures from prior Months; provided, however,
that for Hydrocarbons Operations relating to areas other than the Designated
Fields, the Contractor shall only be entitled to recover Hydrocarbons Operations
Expenditures from Hydrocarbons produced from Fields other than the Designated
Fields. All such Hydrocarbons Operations Expenditures shall be recovered
without a ceiling in the manner and to the extent provided for in, and subject to,
the Accounting Procedures. For the purpose of determining the quantity of such
Hydrocarbons to which the Contractor is entitled in any Month pursuant to this
Section 10.1(b), each type and grade of Hydrocarbons shall be valued at the
weighted average net price per applicable unit, (i) in the case of Arm’s-Length
Sales made by the Contractor, actually received by the Contractor in respect of
sales of such Hydrocarbons produced in such Month and (ii) in the case of other
sales made by the Contractor, equal to the Formula Price for such Hydrocarbons;
provided that this clause (ii) shall apply only if the sales referred to in this clause
(ii) represent more than fifty percent (50%) of the total volume of sales made by
the Contractor of such Hydrocarbons produced and saved in such Month.
(c) The provisions and calculations of this Section 10.1(c) shall apply and be made
separately in respect of (i) the Designated Fields taken as a whole and the
Hydrocarbons Operations Expenditures, Net Hydrocarbons and Gross Contractor
Revenues therein and (ii) the remainder of the Contract Area taken as a whole and
the Hydrocarbons Operations Expenditures, Net Hydrocarbons and Gross
Contractor Revenues therein. After deduction of the Royalty and recovery of the
Hydrocarbons Operations Expenditures, the Ministry shall be allocated a portion
of the Net Hydrocarbons produced and saved in any Month determined in
accordance with the formula set forth below, and the remaining Net Hydrocarbons
after such allocation shall be allocated to the Contractor:
If R<1 then P = 0%
If KR<1.3 then P = 50%
If 1.3
If R>2.5 then P = 70%
33
Amu Darya Basin EPSC
In the above formula:
“P” shall mean the Ministry’s percentage share of Net Hydrocarbons, valued at
the applicable Formula Price; and
“R” shall mean the cumulative Gross Contractor Revenues up to the end of the
Month immediately preceding the Month in question, divided by the cumulative
Hydrocarbons Operations Expenditures incurred up to the end of the Month
immediately preceding the Month in question.
10.2 Calculations and Adjustments. The calculations required by this Article X shall be
made for each Month on a cumulative basis. To the extent that actual quantities, prices
and expenses are not known, calculations shall be made on the basis of the estimate, and
quarterly updates thereto, provided to the Ministry pursuant to Section 10.3. Within
thirty (30) Days after the end of each Quarter, adjustments shall be made based on
actual Hydrocarbons quantities, prices and expenses in relation to such Quarter to the
extent then available. Within ninety (90) Days after the end of each Year, final
calculations shall be prepared and submitted to the Ministry for approval, and any
necessary adjustments shall be made based upon the detailed accounts submitted for
such Year pursuant to Section 26.2.
10.3 Estimates and Approvals. Not less than ninety (90) Days prior to the beginning of
each Year, the Contractor shall prepare and furnish to the Ministry for approval an
estimate by Quarter for the forthcoming Year of all Gross Contractor Revenues and
Hydrocarbons Operations Expenditures, and of the value of the Royalty and of the
Ministry’s and the Contractor’s respective shares of Net Hydrocarbons, Net Taxable
Income and Income Tax for such Year. Such estimate shall be consistent with the
forecast statement furnished pursuant to Section 7.2(c) and the Work Programme
Budget approved pursuant to Section 5.3, and shall set forth the other assumptions and
projections upon which it is based. Upon approval by the Ministry, such estimate shall
serve as the basis for the quarterly calculations required pursuant to Section 10.2 and for
the Income Tax pursuant to Article XVI. Quarterly updates of such estimate shall be
submitted by the Contractor to the Ministry within thirty (30) Days after the end of each
Quarter.
10.4 Deemed Sales. The Hydrocarbons allocated to the Ministry under this Article X in any
Month shall, unless the Ministry otherwise elects in accordance with Section 10.5, be
deemed sold by the Ministry to the Contractor upon production at the wellhead. The
purchase price for each type of Hydrocarbons produced shall be the applicable Formula
Price for such Hydrocarbons, and shall be payable to the Ministry no later than the end
of the Month following the Month in which such Hydrocarbons are produced. Payment
shall be accompanied by a certificate from the Contractor setting forth in detail the basis
for computation of the purchase price, in a form acceptable to the Ministry. The
provisions of this Section 10.4 shall not apply to Hydrocarbons produced during
production testing and sold by the Contractor, the proceeds of which shall be applied to
reduce the amount of the Contractor’s capital expenditures in accordance with the
Accounting Procedures.
34
Amu Darya Basin EPSC
10.5 Notice and Election. The Ministry may, in respect of any Year, elect to retain title to
all or any part of the Hydrocarbons allocated to it under this Article X, rather than sell
such Hydrocarbons to the Contractor. In such event, the Ministry shall provide the
Contractor with notice of its election at least six (6) Months prior to the commencement
of the Year in question.
ARTICLE XI
FORMULA PRICE FOR HYDROCARBONS; MEASUREMENT OF
HYDROCARBONS
11.1 Formula Price for Liquid Hydrocarbons. The Fonnula Price for the Liquid
Hydrocarbons produced and saved from any Field in the Contract Area in any Month
shall be determined in accordance with the following formula:
P = U+(B-U) *(1 + 0.15139 *Ap.b-0.1434 *SP.B)-T-D
Where
P is the price of the Liquid Hydrocarbons produced and
delivered to the Delivery Point (US$ per Barrel);
U is the average of the Platt’s Prices of Urals crude oil for the
Month in question (US$ per Barrel);
B is the average of the Platt’s Prices of Dated Brent crude oil
for the Month in question (US$ per Barrel);
Ap-b is the difference between the API degrees of the Liquid
Hydrocarbons produced and 38.3 degrees;
Sp.s is the difference between the percentage of sulphur content
of the Liquid Hydrocarbons produced and 0.4 percent;
T is the deemed transport cost of the Liquid Hydrocarbons
produced (US$ per Barrel), determined in accordance with
Section 11.3; and
D is the amount of the initial production discount (if any) on
the price of the Liquid Hydrocarbons produced (US$ per
Barrel), determined in accordance with Section 11.4.
i
35
Amu Darya Basin EPSC
For purposes of calculating the average monthly Platt's Price, the Platt’s Price for any
Day of the Month means (i) in the case of Dated Brent crude oil, the average of the high
and low spot prices for such crude oil as quoted for such Day in Platt’s Crude Oil
Marketwire (Spot Assessment Section, Dated Brent Assessment) and (ii) in the case of
Urals crude oil, the average of the high and low spot prices for such crude oil as quoted
for such Day in Platt’s Crude Oil Marketwire (Spot Assessment Section, Urals MED
Assessment). Transportation costs shall be reviewed every two (2) Years after the Initial
Exploration Period according to Section 11.3, and the other coefficients and parameters
in the Formula Price shall be reviewed by the Parties at the conclusion of the Initial
Exploration Period and then every four (4) Years thereafter.
11.2 Alternate Reference Prices. If the Platt’s Price is no longer available for either of the
crude oils referenced in U and B, the Parties shall agree on similar published reference
prices and adjust the parameters of the pricing formula accordingly.
11.3 Transport Costs. During the Initial Exploration Period, T in the formula set forth in
Section 11.1 shall have a value of five U.S. Dollars (US$ 5.00) per Barrel for Liquid
Hydrocarbons produced from each Field in the Bazarkhami and Kashkari Blocks and
seven U.S. Dollars (US$ 7.00) per Barrel for Liquid Hydrocarbons produced from each
Field in the Zamarudsay Block. Thereafter, the Parties shall meet at least once every
two (2) Years to negotiate in good faith any adjustments to T that may be appropriate
based upon then prevailing conditions regarding transportation costs for Liquid
Hydrocarbons originating from each Field and the applicable Delivery Point for use in
determining the Formula Price.
11.4 Initial Production Discounts. D in the formula set forth in Section 11.1 shall have a
value of (i) twenty U.S. Dollars (US$ 20.00) per Barrel for each Barrel of Liquid
Hydrocarbons produced from the Contract Area during the first Year, (ii) ten U.S.
Dollars (USS 10.00) per Barrel for each Barrel of Liquid Hydrocarbons produced from
the Contract Area during the second Year, and (iii) zero U.S. Dollars (USS 0.00) per
Barrel for each Barrel of Liquid Hydrocarbons produced thereafter.
11.5 Formula Price for Natural Gas. The Formula Price for Natural Gas shall be
determined by agreement between the Ministry and the Contractor, provided, however,
that such price or value shall reflect the following: (i) the quantity and quality of the
Natural Gas; (ii) the price at which sales of Natural Gas from other sources in
Afghanistan, if any, are then being made; (iii) the price at which sales, if any, of Natural
Gas imported into Afghanistan for consumption in Afghanistan are being made; (iv) the
purpose for which the Natural Gas is to be used; and (v) the international market price
of competing or alternative fuels or feedstocks.
11.6 Verification. Within thirty (30) Days following the end of each Quarter, the Contractor
shall submit to the Ministry for its verification the volumes, gravity in API and sulphur
content of the Liquid Hydrocarbons produced and saved from the Contract Area during
the Quarter in question. In the event that the Ministry raises objections to the
Contractor’s determinations, the Parties shall meet within fifteen (15) Days from the
Ministry’s notice of objection to mutually agree upon the appropriate determinations.
36
Amu Darya Basin EPSC
11.7 Segregation of Liquid Hydrocarbons. In the event that Hydrocarbons Operations
involve the segregation of Liquid Hydrocarbons of different quality, grade or gravity,
and if the Parties do not otherwise mutually agree, (i) any and all provisions of this
Contract concerning valuation of Liquid Hydrocarbons shall separately apply to each
segregated Liquid Hydrocarbon and (ii) each segregated Liquid Hydrocarbon produced
in a given Month shall contribute to (a) recovery by the Contractor of Hydrocarbons
Operations Expenditures pursuant to Section 10.1 and (b) the Liquid Hydrocarbons
entitlements of each Party in the same proportion as the quantity of such Liquid
Hydrocarbon produced and segregated bears to the total quantity of Liquid
Hydrocarbons produced and saved from the Contract Area.
11.8 Measuring Equipment. The Contractor shall supply, operate and maintain equipment
for measuring the volume and quality of the Hydrocarbons produced and saved, or
transported, stored or exported under this Contract, including gravity, density,
temperature and pressure measuring devices and any other devices that may be required.
All measurement equipment and devices shall, prior to their installation or usage, be
approved in writing by the Ministry. Such equipment and devices shall at all reasonable
times be available for inspection and testing by the Ministry or its authorised
representatives. Any such inspection or testing shall not interfere with the normal
operation of the facilities involved. The equipment and devices used or installed
pursuant to this Section 11.8 shall not be replaced or altered without the prior written
approval of the Ministry.
11.9 Measurement Standards. The Contractor shall undertake to measure the volume and
quality of the Hydrocarbons produced, saved, transported, stored and exported
hereunder, consistent with International Best Practices for fiscal metering, with such
frequency and according to such procedures as are approved in writing by the Ministry.
11.10 Notice. The Contractor shall give the Ministry timely notice of its intention to conduct
measuring operations and the Ministry shall have the right to be present at and
supervise, either directly or through authorised representatives, such operations.
11.11 Measurement Inaccuracies and Adjustment. If it is determined, following an
inspection or test carried out by the Ministry or its representatives, that the equipment,
devices or procedures used for measurement are inaccurate and exceed the permissible
tolerances which shall be established by agreement between the Ministry and the
Contractor to be entered into prior to the installation and usage of such equipment, and
such determination is verified by an independent surveyor acceptable to both parties,
such inaccuracy shall be deemed to have existed for one half of the period since the last
previous such inspection or test, unless it is proved that such inaccuracy has been in
existence for a longer or shorter period. Appropriate adjustments covering such period
shall be made within thirty (30) Days from the date of such determination.
\
37
\A&
Amu Darya Basin EPSC
ARTICLE XII
DOMESTIC REQUIREMENTS
12.1 Local Preference. In marketing any part of its share of the Liquid Hydrocarbons
produced and saved from the Contract Area, the Contractor shall give preference to
purchases by Afghan nationals and companies, provided that such purchases are at
prices that are not less than the price for Arm’s-Length Sales or not less than the
Formula Price.
12.2 Storage. Liquid Hydrocarbons that the Ministry has elected to take in kind and not to
sell to the Contractor shall be delivered by the Contractor at regularly spaced intervals at
the Delivery Point or to the Ministry’s storage facilities in the Field, or both, at the
option of the Ministry. The Ministry shall provide at such Delivery Points, at its sole
expense and risk, all storage, transportation and other facilities necessary to receive such
Liquid Hydrocarbons.
12.3 Internal Consumption of Liquid Hydrocarbons. Out of the total quantity of Liquid
Hydrocarbons production to which the Contractor is entitled in each Year, the Ministry
may elect to take a quantity of Liquid Hydrocarbons, of the gravity, grade and quality of
its choice, that the Ministry requires to satisfy the requirements of internal consumption
in Afghanistan for such Year. The Ministry shall reimburse the Contractor for such
quantity at the Formula Price. The maximum quantity of Liquid Hydrocarbons that the
Ministry may take to satisfy the internal consumption requirements of the country shall
be calculated as follows:
DMOc = APc x (DMOt - GOV) / APt
Where:
“DMOc” is the maximum quantity of Liquid Hydrocarbons from the Contract Area that
the Ministry may take to satisfy the internal consumption requirements of the country in
the period of reference;
“APc” is the total quantity of Liquid Hydrocarbons produced from the Contract Area
during the reference period, less (a) the amount of the Royalty, (b) the Ministry’s share of
Liquid Hydrocarbons production under Section 10.1(c), and (c) consumption of Liquid
Hydrocarbons incidental to Hydrocarbons Operations;
“DMOt” is the internal consumption requirements of Afghanistan during the reference
period;
“GOV” is (a) the quantity of Liquid Hydrocarbons rendered, in the reference period, to
the Ministry by all contractors in the form of production payments, royalties and
production shares plus (b) any quantity of Liquid Hydrocarbons produced directly by the
Ministry or any State oil company within Afghanistan in the reference period; and
38
Amu Darya Basin EPSC
“APt” is the volume of Liquid Hydrocarbons produced in Afghanistan by all contractors
in the reference period as to which the Ministry has a right similar to that contained in
this Section 12.3.
The Ministry shall procure that each exploration and production sharing contract (or
similar agreement) that it enters into shall provide for the right of the Ministry to elect to
purchase a quantity of Liquid Hydrocarbons for internal consumption, at a price equal to
the value attributed in such other contract to Liquid Hydrocarbons to which the Ministry
is entitled. If it is conclusively determined that the Ministry entered into an exploration
and production sharing contract without such right, then the Contractor is excused from
performance of this Section 12.3. The Ministry shall provide the Contractor (and its
auditors) with such reasonable access to its records as may be requested in order for the
Contractor to evaluate the quantities used in calculation of DMOc.
12.4 Notification and Election. If the Ministry elects to exercise its rights under Section
12.3, it shall so notify the Contractor in accordance with the provisions of Section 10.5
relating to the Ministry’s election to take its share of Liquid Hydrocarbons production or
the Royalty in kind. The amounts to be taken shall be based upon estimates, including
those contained in the forecast statement furnished pursuant to Section 7.2(c), and final
adjustments shall be made within ninety (90) Days after the end of each Year on the
basis of actual quantities.
12.5 Internal Consumption of Natural Gas. Out of the total quantity of Natural Gas to
which the Contractor is entitled in each Year, the Ministry may elect to take a quantity
of Natural Gas to meet its internal consumption requirements. The Contractor shall be
obliged to provide and supply to the State such quantities on a prorated basis with all
other producing contractors (according to the principles set forth in Section 12.3 for
Liquid Hydrocarbons) at the price calculated pursuant to Section 11.5, provided that if
the Contractor has committed volumes of Natural Gas to purchasers under long term
sales contracts previously disclosed to the Ministry, such volumes shall be excluded
from the amounts that might be available to the State for internal consumption and
provided that the Contractor shall have no obligation to pay for any infrastructure
necessary to transport, process or deliver Natural Gas to the Ministry.
ARTICLE XIII
PAYMENT PROCEDURE
13.1 Payments to the Ministry. All payments due to the Ministry hereunder shall be made
in U.S. Dollars to the Treasury Single Account in Da Afghanistan Bank, details of
which may be provided from time to time by the Ministry, and shall be made in
accordance with the provisions of the Public Finance and Expenditure Management
Law.
13.2 Payments to the Contractor. All payments due to the Contractor hereunder shall be
made in U.S. Dollars at a domestic or an international bank with offshore banking
39
Amu Darya Basin EPSC
facilities to be designated by the Contractor or, at the Ministry’s election, such other
currency as is acceptable to the Contractor.
13.3 Timing of Payments. Except as otherwise expressly provided herein, all payments
required to be made pursuant to this Contract shall be made within thirty (30) Days
following the end of the Month in which the obligation to make such payment occurs.
13.4 Late Payments. If any payment is not made when due, such unpaid amount shall bear
interest as from and after the due date until the date of payment at an interest rate,
compounded monthly, of five percent (5%) above the London Interbank Offer Rate
(“LIBOR”) for one (1) month deposits of U.S. Dollars, as reported in the London
Financial Times or any other agreed publication.
ARTICLE XIV
SURFACE RENTAL FEES
14.1 State-owned Land. The Contractor shall be liable for payment of the following annual
surface rental fees to the Ministry in respect of all State-owned land:
(a) during the Initial Exploration Period, one U.S. Dollar (USS 1.00) per hectare of
all unsurrendered State-owned land forming part of the Contract Area, excluding
Fields;
(b) during the First Extension Period, four U.S. Dollars (USS 4.00) per hectare of all
unsurrendered State-owned land forming part of the Contract Area, excluding
Fields;
(c) during the Second Extension Period and any extension granted pursuant to
Section 3.1(a), eight U.S. Dollars (USS 8.00) per hectare of all unsurrendered
State-owned land forming part of the Contract Area, excluding Fields;
(d) during the period from the first declaration of Commercial Discovery with respect
to any Field other than a Designated Field, fifteen U.S. Dollars (USS 15.00) per
hectare of all unsurrendered State-owned land forming part of such Commercial
Discovery; and
(e) during the Development and Production Phase with respect to each Field
(including the Designated Fields) in which production has started, the Contactor
shall pay forty U.S. Dollars (USS 40.00) per hectare of State-owned land forming
part of such Field.
14.2 Timing of Payments. The Contractor shall make surface rental fee payments to the
Ministry annually in respect of the then current Year. The first annual surface rental fee
payment under Section 14.1 shall be made within thirty (30) Days after the Effective
Date. All subsequent annual surface rental fee payments shall be made within thirty
(30) Days after each anniversary of the Effective Date. In the event the area of a Field
40
i
Amu Darya Basin EPSC
is further delineated or otherwise adjusted during a Year so as to increase or decrease
the number of hectares of State-owned land forming part of such Field, no
corresponding adjustment shall be made to the amount of any surface rental fee payment
already paid in respect of such Year.
14.3 Privately Owned Land. For its use of privately owned land, the Contractor shall pay
such rental fees as are agreed with the owner, or decided by the Ministry as stipulated in
Article 12 of the Hydrocarbons Law, or as determined by a dispute resolution board
which shall consist of representatives from the Ministries of Justice, Mines, Agriculture,
and Finance and the National Environmental Protection Agency. If the Parties do not
agree with the decision of the dispute resolution board, the dispute shall be settled
through the courts. All such rental fee payments shall be considered Hydrocarbons
Operations Expenditures recoverable by the Contractor in accordance with Section
10.1(b).
14.4 Area Subject to Surface Rental Fees. The area of State-owned land subject to surface
rental fees under Section 14.1 shall be determined by a survey approved by the
Ministry; provided, however, that in the absence of such a survey, such area shall be
determined on the basis of a geographic projection approved by the Ministry. In the
case of the Designated Fields, in the absence of a survey approved by the Ministry, the
area of State-owned land subject to surface rental fees under Section 14.1(e) shall be
equal to the area comprising the Quadrants containing the Designated Fields.
ARTICLE XV
NATURAL GAS
15.1 Associated Gas. Associated Gas that is not processed and sold or subject to off-take by
the Ministry in accordance with this Section 15.1 may be used by the Contractor for
Hydrocarbons Operations, including reinjection for pressure, free of charge. Associated
Gas that is not used in Hydrocarbons Operations, and the processing and utilization of
which, in the opinion of both the Contractor and the Ministry, is not economical, shall
be returned to the subsurface structure, or shall be flared or otherwise disposed of, so
long as such alternate disposition is in accordance with International Best Practices. In
the event that the Contractor chooses to process and sell Associated Gas, the Contractor
shall notify the Ministry of the same and upon such notification, the Ministry and the
Contractor shall, as soon as practicable thereafter, meet together with a view to reaching
an agreement on the production, processing and sale of such gas. In the event the
Contractor chooses not to process and sell Associated Gas, the Ministry may elect to
off-take at the outlet flange of the gas-oil separator and use such Associated Gas which
is not required for Hydrocarbons Operations. There shall be no charge to the Ministry
for such Associated Gas, provided that the cost to gather such Associated Gas in the
Field and to process and utilize it shall be for the account of the Ministry.
15.2 Non-Associated Gas. Where Non-Associated Gas is discovered in the Contract Area
and the Contractor has, pursuant to Section 7.1(b), informed the Ministry that the
41
Amu Darya Basin EPSC
Discovery is of commercial interest, a Natural Gas development committee composed
of representatives of the Ministry and the Contractor shall be established upon approval
of the Appraisal Programme relating to such Discovery for purposes of jointly
evaluating the use of such Natural Gas in the domestic market and the chain of
downstream activities required to bring the Natural Gas to the end consumers in such
market. Simultaneously, the Contractor shall be free to evaluate the viability of
exporting Natural Gas. Within one (1) year from the date of completion of the
Appraisal Programme, the Ministry and the Contractor will meet with a view to
assessing whether the outlets for such Natural Gas and other relevant factors warrant the
development and production of the Natural Gas for sale to the domestic market and/or,
if such market was found not to be capable of absorbing the Natural Gas production, for
export. The Ministry and the Contractor will, upon completion of the Appraisal
Programme or sooner if so agreed, or upon the Contractor notifying the Ministry that the
Discovery is a Commercial Discovery, meet with a view to reaching an agreement on
the development, production, processing, utilization, disposition, export duty status and
such other terms as may be necessary to enhance the commerciality of any Non-
Associated Gas development, or sale of such Non-Associated Gas in accordance with
Sections 7.1(h), 7.1 (i) and 7.1(j).
15.3 Allocation of Revenues and Expenditures. In the event that the development,
production, processing, utilization, disposition or sale of Natural Gas from the Contract
Area is determined by the Parties to be economically feasible in accordance with this
Article XV, the costs of development and production of the same from the reservoir to
the Delivery Point, and the revenues derived therefrom, shall, unless otherwise agreed
pursuant to Sections 15.1 and 15.2, be included in Hydrocarbons Operations
Expenditures and Gross Contractor Revenues, respectively, for all purposes of this
Contract, subject to the Accounting Procedures.
ARTICLE XVI
INCOME TAX
16.1 Income Taxes. Income tax issues related to Hydrocarbons Operations are governed by
the Income Tax Law of Afghanistan, as amended or replaced and in force from time to
time. At the Effective Date, the prevailing Income Tax rate in Afghanistan is twenty
percent (20%).
16.2 Income Tax Stabilization. The Contractor agrees that its taxable income shall be
subject to an Income Tax rate of thirty percent (30%) stabilized for the remaining period
of this Contract, subject to the provisions of Section 5.1(1).
16.3 Business Receipt Tax. The Contractor shall be exempted from Business Receipt Tax
during the term of this Contract for all business conducted in connection with this
Contract.
42
w*/
Amu Darya Basin EPSC
ARTICLE XVII
CUSTOMS DUTIES
17.1 Customs Duties related to Hydrocarbons Operations are governed by the Customs Law
of Afghanistan, as amended or replaced from time to time. The Contractor shall be
subject to the applicable Customs Duties provided in the Customs Tariff in effect from
time to time in Afghanistan, provided, however, that:
(a) for the duration of this Contract, the Contractor shall be entitled to import into
Afghanistan the equipment and supplies listed in Exhibit I for use in the Contract
Area free of Customs Duties; and
(b) for a period of two (2) Years from the Effective Date, the Contractor shall be
entitled to export Liquid Hydrocarbons free of Customs Duties, which are
currently set by Code 2709.0000 of the Customs Tariff at two and one half
percent (2.5%). This temporary waiver of Customs Duties on Liquid
Hydrocarbons exported by the Contractor may be extended for the duration of the
Initial Exploration Period pursuant to the terms and conditions of a letter of
cooperation between the Parties, to be entered into on or about the date hereof,
leading toward the completion of a refinery contract by December 31, 2012.
(c) Customs Duties on Natural Gas shall be determined in accordance with the
provisions of Section 15.2.
17.2 Exhibit I is a statement of the equipment that, as of the execution date of this Contract,
the Parties consider will be required to be imported for Hydrocarbons Operations. The
Parties acknowledge and agree that such list is not exhaustive and that further items
shall be added to the list at the Contractor's request in writing, provided the Inter-
ministerial Commission approves of such request (such approval not to be unreasonably
withheld).
ARTICLE XVIII
EXCHANGE AND CURRENCY CONTROLS
The Contractor shall be subject to the applicable exchange control legislation and regulations in
effect from time to time in Afghanistan, provided, however, that:
(a) the Contractor shall be entitled to retain outside Afghanistan, and freely transfer,
foreign currency received by it outside of Afghanistan, including the proceeds of
sales of Hydrocarbons to which it is entitled hereunder;
(b) the Contractor shall be entitled to export from Afghanistan, free of limitation or
restriction, in the same currency as that in which the investment was made, the
*
43
Amu Darya Basin EPSC
funds held by it, provided, however, that this subsection (b) shall not impose any
obligation upon the Ministry to provide foreign currency to the Contractor;
(c) in the matter of purchase and sale of currency within Afghanistan, whether of
Afghanistan or other countries, the rates of exchange shall not be less favourable
to the Contractor than those granted to any investor that introduces or transfers
foreign currency into Afghanistan. Any gain or loss resulting from the exchange
of currency in connection with Hydrocarbons Operations shall result in a
corresponding reduction or increase, as the case may be, in the Hydrocarbons
Operations Expenditures recoverable by the Contractor in accordance with
Section 10.1(b);
(d) no restriction shall be placed on the importation by the Contractor of funds
necessary for carrying out Hydrocarbons Operations under this Contract; and
(e) the Contractor shall have the right to pay directly outside of Afghanistan from its
offices abroad for purchases or services for Hydrocarbons Operations hereunder,
provided that no such payments shall be made to Afghan citizens or to firms using
Afghanistan as their main base of operations, whether natural or juridical,
contrary to the laws of Afghanistan.
ARTICLE XIX
TREATMENT UNDER INTERNATIONAL LAW
The treatment accorded to the Contractor by Afghanistan shall not be less favourable than the
treatment required to be accorded by Afghanistan to foreign investors under applicable law.
ARTICLE XX
TRAINING, EMPLOYMENT AND LOCAL CONTENT
20.1 Training of Afghan Nationals. The Contractor agrees to as far as possible train and
employ qualified Afghan nationals in the Hydrocarbons Operations and after Initial
Commercial Production will undertake the schooling and training of Afghan nationals
for staff positions, including administrative and executive management positions. The
Contractor will require its contractors and subcontractors to do the same. The
Contractor undertakes to give priority to Afghan nationals with equivalent qualifications
and experience and actively search for Afghan nationals in order to meet the training
and employment obligations established in the prevailing legislation and to gradually
replace its expatriate staff with qualified Afghan nationals as they become available. An
annual programme for training and phasing-in of Afghan nationals shall be established
by the Contractor and shall be submitted for approval to the Ministry. Such programme
shall be included in the Work Programmes submitted by the Contractor pursuant to
Section 5.3. Within thirty (30) Days after the end of each Year, the Contractor shall
submit a written report to the Ministry describing the number of personnel employed,
44
Amu Darya Basin EPSC
their nationality, their positions and the status of training programmes for Afghan
nationals.
20.2 Training of Ministry Personnel. The Contractor shall also be required to establish a
programme, reasonably satisfactory to the Ministry, to train personnel of the Ministry to
undertake skilled and technical jobs in Hydrocarbons Operations for the State. Such
programme shall include provisions for involving representatives of the Ministry in the
preparation of the Work Programmes and Work Programme Budgets as required by
Section 5.3(c).
20.3 Minimum Expenditures. The Contractor shall expend a minimum of fifty thousand
U.S. Dollars (US$ 50,000.00) in the first Year for training pursuant to Sections 20.1 and
20.2. Thereafter the minimum expenditure for training pursuant to Sections 20.1 and
20.2 shall be increased by five thousand U.S. Dollars (US$ 5,000.00) annually. All
training costs pursuant to Sections 20.1 and 20.2 shall be recoverable by the Contractor
in accordance wih Exhibit C, Accounting Procedures.
20.4 Long Range Plan and Budget. A long range plan and budget for the training
programmes described in Sections 20.1 and 20.2 is attached hereto as Exhibit F. All
annual training programmes and budgets therefor shall be consistent with such long
range plan and budget.
ARTICLE XXI
PURCHASES IN AFGHANISTAN
21.1 Local Preference. In procurement, the Contractor shall give preference to goods that
are produced or available in Afghanistan and services that are rendered by Afghan
nationals and companies, provided that such goods and services are similar in quality,
quantity and price to imported foreign goods and services and available at the time. The
Contractor shall, upon request of the Ministry, develop local preference targets and
specific plans to meet such targets. Such plans shall be provided as part of the
Contractor's Work Programmes to be approved by the Ministry and shall include, but
not be limited to, timelines, key milestones and formal review dates, a description of
potential areas of the Contractor’s business in which to integrate local preferences, and a
summary of the Contractor’s local preference initiatives and results, including the then
current percentage and sources of Afghan goods and services used in the Contractor’s
Hydrocarbons Operations.
21.2 Equivalency. Locally produced or available equipment, materials and supplies shall be
deemed equal in price to imported items if the local cost of such locally produced or
available items at the Contractor’s operating base in Afghanistan is not more than
fifteen percent (15%) higher than the cost of such imported items before Customs
Duties but after transportation and insurance costs have been added.
45
Amu Darya Basin EPSC
ARTICLE XXII
JOINT DEVELOPMENT / UNITIZATION
22.1 Joint Development in Other Awarded Areas. If a Field is designated within the
Contract Area and such Field extends beyond the Contract Area to other areas of
Afghanistan over which other parties have the right to conduct exploration, development
and production operations, the Ministry may require that the development of the Field
and the production of Hydrocarbons therefrom be carried out in collaboration with the
other contractors. The same rule shall be applicable if deposits of Hydrocarbons within
the Contract Area, although not equivalent to a Commercial Discovery if developed
alone, would be deemed to be a Commercial Discovery if developed with those parts of
the deposits that extend to areas controlled by other contractors.
22.2 Joint Development in Non-Awarded Areas. If a Hydrocarbons deposit extends onto a
non-awarded block or if deposits of Hydrocarbons within the Contract Area, although
not equivalent to a Commercial Discovery if developed alone, would be deemed to be a
Commercial Discovery if developed with those parts of the deposits that extend to such
areas, the Contractor shall promptly notify the Ministry. The Ministry may decide if
and how the non-awarded area shall be awarded, and any terms and conditions for such
joint development.
22.3 Collaborative Proposals. The Contractor shall collaborate with other contractors in
preparing a collective proposal for common development and production of the deposits
of Hydrocarbons for approval by the Ministry.
22.4 Ministry Proposals. If the proposal for common development and production has not
been presented within ninety (90) Days of the request described in Section 22.1, or if the
Ministry does not approve such proposal, the Ministry may prepare or cause to be
prepared, for the account of the Contractor and the other contractors involved, a
reasonable plan for common development and production. If the Ministry adopts such
plan, the Contractor shall comply with all conditions established in such plan.
22.5 International Coordination. This Article XXII shall also be applicable to Discoveries
of Hydrocarbons within the Contract Area which extend to areas that are not within the
dominion of Afghanistan, provided that in these cases the Government shall be
empowered to impose the special rules and conditions which may be necessary to
satisfy obligations under any agreements with international organizations or adjacent
states with respect to the development and production of such Hydrocarbons. If a
Liquid Hydrocarbons deposit extends onto the territory of another state, the Ministry
will assist the Contractor in, as far as possible, negotiating an agreement with the
government of that other state on the most efficient co-ordination of Hydrocarbons
Operations in connection with the Liquid Hydrocarbons deposit as well as on the
apportionment of the Liquid Hydrocarbons deposit. This shall apply similarly when, in
the case of several Liquid Hydrocarbons deposits, joint Liquid Hydrocarbons activities
would obviously be more efficient.
46
Amu Darya Basin EPSC
22.6 Unitization. Within ninety (90) Days following the approval or adoption of a
unitization plan for common development and production by the Ministry, the
Contractor shall proceed to operate under any such plan. If a clause of a cooperative or
unitary development and production plan which has been approved or adopted by the
Ministry, and which by its terms affects the Contract Area or a part of the same,
contradicts a clause of this Contract, the clause of the cooperative or unitary plan shall
prevail.
ARTICLE XXIII
HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION
23.1 Compliance with Laws. In the conduct of the Hydrocarbons Operations, the
Contractor shall comply, and shall require its subcontractors to comply, with any
applicable laws and regulations, including the Hydrocarbons Law and any regulations
issued thereunder, relating to the protection of the environment and the health, safety
and welfare of workers and the public.
23.2 Oversight and Rehabilitation. Prior to the commencement of Hydrocarbons
Operations in a Designated Field or other area of a Block outside of a Designated Field,
the Contractor shall undertake and complete a Baseline Environmental Assessment of
the Designated Field or other area consistent with International Best Practices and
applicable laws and noting any existing deficiencies, including any environmental
contamination existing in the Designated Field or other area on or prior to the
commencement of Hydrocarbons Operations. In the course of the Hydrocarbons
Operations, the Contractor shall consider, investigate, assess and manage the impact of
the Hydrocarbons Operations on the environment and the socio-economic conditions of
any Person who might directly be affected thereby. Furthermore the Contractor shall,
upon completion of any Hydrocarbons Operations, rehabilitate as far as reasonably
practicable the environment affected thereby to its natural or predetermined state or to
land use.
23.3 Health and Safety Plan. The Contractor shall take all necessary measures to secure the
health, safety and welfare of individuals. Prior to the commencement of Hydrocarbons
Operations in the Contract Area, the Contractor shall establish, submit to the Ministry
and publish, implement and enforce a health and safety plan throughout all
Hydrocarbons Operations, which shall include the following measures:
(a) all equipment and facilities shall afford reasonable safety from accidents, and
shall be inspected by a qualified person as often as may be necessary to ensure the
safety of the equipment or facility and compliance with the relevant laws and
regulations;
(b) the person performing the inspection shall make a written report of the inspection
and shall forward a copy of the report to the Ministry, and any equipment found to
be defective or unsafe shall be repaired or replaced;
47
Amu Darya Basin EPSC
(c) adequately designed, tested and maintained blowout prevention equipment shall
be employed in connection with the drilling, testing, completing or working over
of any Well;
(d) adequate, easily accessible and properly maintained fire fighting equipment shall
be provided at all operational locations where the potential of fire exists, the
personnel shall be trained in the effective use of such equipment and fire fighting
contingency procedures shall be published and displayed around the site;
(e) all completed Wells shall be reasonably protected and a notice warning persons of
the danger that exists shall be prominently displayed;
(f) all personnel shall wear clothing and footwear suitable for the operational
conditions and the work being performed, including, where appropriate, industrial
protective equipment, such as helmets, eye protectors, gloves and hearing
protection equipment;
(g) where appropriate, notices in English and in the prevalent language of the area of
operations shall be displayed at the operational sites warning all personnel of any
potential danger and of the associated safety requirements;
(h) adequate first aid equipment and personnel shall be available on all operational
sites while work is in progress and procedures shall be established for the
transportation of persons needing prompt medical attention;
(i) reliable communication facilities shall be provided at all operational locations;
and
(j) all aircraft operations shall be conducted in accordance with existing laws of
Afghanistan.
23.4 Manuals. The Contractor shall prepare and submit to the Ministry for approval prior to
the commencement of Hydrocarbons Operations:
(a) a manual of instructions for the safety operations which shall detail procedures to
be followed to safeguard the health and safety of all personnel associated with all
foreseen operations and to safeguard the environment;
(b) a manual of response to emergencies which may occur, including the escape or
ignition of Hydrocarbons, serious injuries, and other conditions requiring the
evacuation of the site; and
(c) a manual of procedures for the maintenance of Well control which shall detail
procedures and equipment which will be used in the event of a blowout.
All appropriate personnel at the site shall be made aware of and be trained in the
procedures detailed in the manuals.
48
Amu Darya Basin EPSC
23.5 Additional Protective Measures. In addition to the requirements for the protection of
the environment as is provided in the environmental management plan approved by the
Ministry, the Contractor shall, when carrying out Hydrocarbons Operations, take all
practical measures to:
(a) prevent the pollution of any water well, spring, river, lake or reservoir by the
escape of Hydrocarbons, drilling fluids, chemical additives or any other waste
product or effluent;
(b) where pollution occurs, treat or disperse it in an environmentally acceptable
manner;
(c) dispose of all waste liquids used during the drilling of a Well in a manner
approved by the Ministry;
(d) properly secure permanent installations;
(e) remove all worn, damaged or surplus equipment and supplies, and other rubbish
from site to an approved waste disposal site to be reused or recycled if possible;
and
(f) on the completion or abandonment of a Well, promptly restore the Well site and
any surrounding area as near to the state existing prior to the conduct of
Hydrocarbons Operations as may practically be done and render that area safe.
23.6 Minimization of Flaring. When carrying out Hydrocarbons Operations, the Contractor
shall furthermore take all practical measures to minimize flaring of any Natural Gas by
re-injecting such Natural Gas into suitable strata or underground storage in accordance
with International Best Practices or in any other approved scheme. The Contractor shall
seek the Ministry’s approval to flare any such gas which cannot be re-injected due to
specific reservoir considerations or for other reasons that are accepted internationally or
in an approved scheme in line with International Best Practices. Before flaring, the
Contractor shall take reasonable measures to ensure the extraction of Natural Gas and
other liquids contained in the Associated Gas if the Ministry and the Contractor have
agreed that such extraction is economically justifiable. Notwithstanding anything in this
Article XXIII to the contrary, Associated Gas may be flared if necessary for the
conducting of Well and production tests and during any emergency.
23.7 Remedial Measures. If the Ministry reasonably determines that any works or
installations erected by the Contractor or any operations conducted by the Contractor
endanger or may endanger persons or third party property or cause pollution or harm
wildlife or the environment to an unacceptable degree, or are otherwise not in
compliance with the provisions of the applicable laws and regulations or of this
Contract, the Ministry may require the Contractor to take remedial measures within a
reasonable period established by the Ministry and to repair any damage to the
environment. If the Ministry deems it necessary, it may also require the Contractor to
discontinue Hydrocarbons Operations in whole or in part until the Contractor has taken
such remedial measures or has repaired any damage. The period of discontinuance shall
49
Amu Darya Basin EPSC
not exceed six (6) Months. In the event that the Contractor fails to take the remedial
measures required by the Ministry within the time period established by the Ministry,
the Ministry may carry out such remedial measures for the Contractor's account.
23.8 Reporting of Accidents or Hazards. The Contractor shall as soon as possible report
any serious or fatal accident that occurs, or any imminent hazard that arises, in
connection with the Hydrocarbons Operations by the most rapid means of
communication to the Ministry and the local State administrative authorities under
whose jurisdiction the accident or hazard occurs or arises.
23.9 Emergency Measures. In case of imminent threat to life, property, or the environment,
the Contractor shall take every measure possible in accordance with the risk
management plan to mitigate or avoid such imminent threat and such immediate action
as is necessary to preserve life, prevent destruction of property, or protect the
environment. The Contractor shall as soon as possible thereafter notify the Ministry of
the action taken. The costs incurred by the Contactor in relation to such action shall be
recoverable as Hydrocarbons Operations Expenditures. The Ministry shall take such
measures to assist in efforts to mitigate or avoid such imminent threat as it deems
appropriate and issue such orders and/or instructions as it deems necessary.
ARTICLE XXIV
DISPUTE SETTLEMENT/ ARBITRATION
24.1 Arbitration. Subject to Section 24.3, any dispute, controversy or claim arising out of or
relating to this Contract which shall not be determined by mutual agreement within
forty-five (45) Days from the date on which the existence of a dispute is notified in
writing by one Party to the other shall be settled by arbitration initiated by either Party
by submission to the International Centre for Settlement of Investment Disputes
(ICSID) pursuant to the Convention on the Settlement of Investment Disputes between
States and Nationals of other States as of March 18, 1965 (ICSID Convention) and the
arbitration rules promulgated thereunder. For the avoidance of doubt, the State hereby
expressly consents to the submission of any dispute which may arise under this Contract
to ICSID for settlement by arbitration in accordance with Article 25 (1) of the ICSID
Convention. For the purpose of Article 25 (2) (b) of the ICSID Convention, the
Contractor shall be treated as a national of a state other than Afghanistan. The number
of arbitrators shall be three. The arbitration shall be conducted in the English language.
The arbitration award may take the form of an order to pay a sum of money, or an order
to perform an act, or an order to refrain from an act, or any combination of such orders.
The place of arbitration shall be London, England. The award rendered shall be final
and conclusive. Judgment on the award rendered may be entered in any court having
jurisdiction or application may be made in such court for a judicial acceptance of the
award and an order of enforcement, as the case may be. As far as practicable, both the
Contractor and the Ministry shall continue to implement this Contract during pendency
of any dispute.
50
Amu Darya Basin EPSC
24.2 Sovereign Immunity. The Ministry hereby waives any rights it may have now or in the
future to claim sovereign immunity for itself or any of its assets to the fullest extent
permitted by the laws of any applicable jurisdiction. This waiver includes a waiver of
any claim to immunity from any legal proceeding commenced in connection with this
Contract including any application for interim relief and any action to enforce or
execute any award or judgment.
24.3 Expertise Proceedings. In the event of any dispute arising out of or in connection with
Section 6.4, Section 7.1(j)(iii), or Section 36.2 of this Contract, the Parties agree to
submit the matter, in the first instance, to administered expertise proceedings in
accordance with the Rules for Expertise of the International Chamber of Commerce.
The determination of the expertise proceedings shall be non-binding and the
proceedings and all documents used or produced in connection therewith shall be
confidential and may not be used in connection with any arbitration or judicial
proceeding, whether pursuant to Section 24.1 or otherwise. If following such
administered expertise proceedings the dispute has not been resolved by mutual
agreement of the Parties it shall, after notification from the International Centre for
Expertise of the termination of the expertise proceedings, be finally settled by
arbitration conducted in accordance with Section 24.1.
ARTICLE XXV
TERMINATION, REVOCATION AND RENEGOTIATION
25.1 Termination for Default. In accordance with the provisions of the Hydrocarbons Law,
the Ministry shall have the right to terminate this Contract upon giving thirty (30) Days
written notice of its intention to do so if the Contractor: (a) fails to provide or maintain
in effect such guarantees required by law or under this Contract, including the Financial
Guarantee, on the due date for providing such guarantees; (b) fails to make any
monetary payment required by law or under this Contract, including any payment in
respect of the purchase price of the Hydrocarbons deemed sold by the Ministry to the
Contractor pursuant to Article X, for a period of thirty (30) Days after the due date for
such payment; (c) fails to comply with any other material obligation that it has assumed
under this Contract, including the obligation to perform the Minimum Exploration
Programme; (d) fails to comply with the Hydrocarbons Law or regulations thereunder or
fails to comply in any material respect with any other lawful acts, regulations, orders or
instructions issued by the Government or any department or agency of the Government;
or (e) becomes bankrupt, or goes into liquidation because of insolvency or makes a
composition with its creditors; provided, however, that a termination for failure to
perform part of the Minimum Exploration Programme shall only apply in respect of the
Block or Blocks (excluding any Fields therein) to which the unperformed obligation
relates.
25.2 Cure Period. If the circumstance or circumstances that result in termination under
Section 25.1 are remedied by the Contractor (i) in the case of Section 25.1(a) or (b),
within the sixty (60) Day period following the notice of termination as aforesaid or (ii)
51
Amu Darya Basin EPSC
in the case of Section 25.1(c) or (d), within the ninety (90) Day period following the
notice of termination as aforesaid, such termination shall not become effective.
25.3 False or Fraudulent Information. If the Ministry finds that the Contractor has
presented false or fraudulent information or information has been withheld by the
Contractor, the Ministry may require the Contractor to provide any necessary
information and explanation. If the Contractor fails to provide such information or the
information and/or explanations provided are unsatisfactory, and the incorrect
information provided or the omission to provide information constitutes a material
breach of Contract, the Contract may be revoked and the State is entitled to
compensation for losses incurred as a result of the breach of contract or other remedies
for breach of contract. Likewise, where the Contractor otherwise repeatedly or
materially violates the Contract, or is in breach of the prohibition of bribing State
Officials pursuant to Article 69 of the Hydrocarbons Law, the Contract may be revoked
and the State is entitled to compensation for losses incurred as a result of the breach of
contract or other remedies for breach of contract. In case of revocation, the Ministry
shall publish reasons justifying revocation of the Contract and shall send a copy thereof
to the Contractor. In such case, the rights and privileges granted to the Contractor shall
be revoked, and the Contract Area shall be forfeited as well as the Financial Guarantee
in accordance with its terms.
25.4 Continuing Obligations. The termination or revocation of this Contract for whatever
reason shall be without prejudice to the obligations incurred and not discharged by the
Contractor prior to the date of termination. In the case of any termination, the Ministry
and the Contractor shall promptly agree on a plan for take-over and/or abandonment.
The Contractor is liable to pay compensation for any damage incurred in the Contract
Area, including the environment.
25.5 Continuing Performance. In the event of termination pursuant to Section 25.1,
Section 25.3 or Section 25.8, the Ministry may require the Contractor, for a period not
to exceed one hundred eighty (180) Days from the effective date of termination, to
continue, for the account of the Ministry, Liquid Hydrocarbons or Natural Gas
production activities until the right to continue such production has been transferred to
another entity. During such period, the Contractor shall be entitled to its share of
Hydrocarbons production as determined in accordance with Section 10.1. Upon
termination, the provisions of Sections 4.4 and 4.5 shall apply.
25.6 Mitigating Environmental Damages or Hazards. Within ninety (90) Days after the
termination or revocation of this Contract pursuant to Section 25.1, Section 25.3 or
Section 25.8, unless the Ministry has granted an extension of this period, the Contractor
shall complete any reasonably necessary action as directed by the Ministry to avoid
environmental damage or a hazard to human life or third-party property.
25.7 Transfer of Ownership. Upon the termination or revocation of this Contract for any
reason, ownership of all pipes, pipelines, installations, facilities, downhole well
equipment, wellhead equipment and other equipment or materials within the geographic
limits of the Contract Area shall be transferred to the Ministry, other than leased
52
Amu Darya Basin EPSC
equipment and other Contractor equipment which can be removed without damage to
the Contract Area.
25.8 Area Closed to Hydrocarbons Operations. If, after the Contractor has signed this
Contract, the State declares or designates an area as disputed, prohibited or unauthorised
in accordance with Article 15 of the Hydrocarbons Law, then the Contractor shall be
entitled to terminate or re-negotiate this Contract. The Contractor shall also be entitled
to damages for losses incurred due to such declaration or designation.
ARTICLE XXVI
BOOKS, ACCOUNTS AND AUDITS;
RECORDS, REPORTS AND INSPECTIONS
26.1 Maintenance of Accounts, Books and Records. The Contractor shall, in accordance
with prevailing legislation and regulations and International Financial Reporting
Standards, be obliged to keep and maintain complete accounts, books and records at its
registered office in Afghanistan reflecting all Hydrocarbons Operations, Hydrocarbons
Operations Expenditures and Gross Contractor Revenues consistent with generally
accepted procedures and standards in the international petroleum industry and in
accordance with this Contract and the Accounting Procedures.
26.2 Submission of Accounts. No later than June 30 each Year, the Contractor shall submit
to the Ministry detailed accounts showing all Hydrocarbons Operations Expenditures
and all Gross Contractor Revenues during the past Year. Before submission to the
Ministry, the accounts shall be audited and certified by an independent chartered
accountant or certified public accountant acceptable to both Parties, at the expense of
the Contractor (such expense to be considered as Hydrocarbons Operations
Expenditures recoverable by the Contractor in accordance with Section 10.1(b)). It is
understood that the Ministry retains the authority to review and audit the Contractor’s
accounts, books and records with respect to Hydrocarbons Operations conducted
hereunder either directly or through an independent accountant designated by the
Ministry.
26.3 Inspection Rights. The Ministry shall have full and complete access to the Contract
Area at all reasonable times with a right to observe Hydrocarbons Operations and shall
have the right to inspect all accounts, books, records, assets and data kept by the
Contractor relating to Hydrocarbons Operations and this Contract, such observations
and inspections to be conducted at the expense of the Ministry. The Ministry may, upon
reasonable advance notice to the Person-in-Charge, perform examinations, surveys,
drawings, tests and analyses, inspect and make copies for the purpose of implementing
this Contract. In doing so, the Ministry shall not unduly interfere with the Contractor’s
Hydrocarbons Operations. The Ministry shall be entitled to make reasonable use of the
equipment and instruments of the Contractor for purposes of this Section 26.3, provided
that no damage to the equipment or instruments or impediment to the Hydrocarbons
Operations hereunder shall result from such use. The Ministry shall indemnify and
53
Amu Darya Basin EPSC
reimburse the Contractor for any loss or damage that may in fact result from any such
use of equipment and instruments. The Ministry shall be given reasonable assistance by
the Contractor for such functions, and the Contractor, the Person-in-Charge and the
Contractor’s representatives shall be required to provide the Ministry with all reasonable
facilities and assistance for the effective exercise of its functions, inter alia by affording
to the Ministry all facilities and privileges afforded to its own personnel in the field
including the use of available office space and housing free of charge.
26.4 Current Recordkeeping and Reporting. The Contractor shall prepare and maintain
accurate and current records of its activities in the Contract Area. The Contractor shall
furnish the Ministry all information, reports and data concerning its activities and
operations under this Contract at such times and with such intervals as are required
under the Hydrocarbon Law and any regulations issued thereunder.
26.5 Samples. The Contractor shall save and keep for the duration of this Contract all
unused cores and samples taken from the Wells drilled, which shall be forwarded to the
Ministry or its representatives at such time and in the manner directed by the Ministry.
All cores and samples acquired by the Contractor shall be available for inspection by the
Ministry or its representatives at all reasonable times. Unless previously forwarded to
the Ministry pursuant to instructions given under this Section 26.5, the Contractor shall
forward to the Ministry all remaining cores and samples upon expiration or termination
of this Contract. Unless otherwise agreed to by the Ministry, in the case of exporting
any rock or Hydrocarbons samples from Afghanistan for the purpose of testing and
analysis, samples equivalent in size and quantity shall, before such exportation, be
delivered to the Ministry.
26.6 Exportation of Original Data. Originals of records and other data can be exported
only with the prior permission in writing of the Ministry; provided, however, that any
data which must be processed or analyzed outside Afghanistan may be exported if a
comparable record is maintained in Afghanistan and such exported records and data,
including processed and interpreted data, are repatriated to Afghanistan. Response to a
request for such permission shall be given without undue delay.
26.7 Ownership of Data. The Contractor shall provide to the Ministry in appropriate form
all original data resulting from Hydrocarbons Operations, including geological,
geophysical, petrophysical, engineering, Well logs, production data and completion
status reports and any other data (including derivative data) which the Contractor may
compile during the term hereof, including all reports, analyses, interpretations, maps and
evaluations thereof prepared by the Contractor and any contractors, subcontractors or
consultants to the Contractor or by its Affiliated Entities, and cuttings of all samples that
have been obtained or compiled during the term hereof (“Data”). The State shall have
title to all Data. The Data shall not be disclosed to third parties by the Ministry prior to
relinquishment of the area to which they relate, or prior to the end of the Exploration
Phase if such area is not sooner relinquished, provided, however, that the Ministry may
make copies available to professional consultants, legal counsel, accountants,
underwriters, lenders and such Government entities as may need to be made aware
thereof or have the right to require disclosure. In any event, the Contractor may retain
54
Amu Darya Basin EPSC
copies of all Data. The Contractor shall not disclose the Data to any third parties
without the Ministry’s prior written consent, provided, however, that the Contractor may
make copies available to professional consultants, legal counsel, accountants,
underwriters, lenders, its Affiliated Entities and contractors and subcontractors of the
Contractor and such government entities as may need to be made aware thereof or have
the right to require disclosure. Any Data that are disclosed by the Ministry or the
Contractor to third parties pursuant to this Section 26.7 shall be disclosed on terms that
ensure that the Data are treated as confidential by the recipient. To the extent that there
is any inconsistency between the provisions of this Section 26.7 and the provisions of
Article XXXIII, the provisions of this Section 26.7 shall govern except to the extent that
application of this Section 26.7 would violate applicable law.
ARTICLE XXVII
INSURANCE AND INDEMNIFICATION
27.1 Insurance. To ensure that the Contractor shall meet its obligations to third parties, or to
Government agencies, that might arise in the event of damage or injury (including
environmental damage or injury and cleanup of accidents) caused by Hydrocarbons
Operations, notwithstanding that the damage is accidental, the Contractor shall maintain
in force a third-party liability insurance policy through an internationally recognized
insurance company reasonably acceptable to the Ministry covering the activities of
itself, its contractors and subcontractors and the employees of all such parties. Such
insurance policy shall include the Ministry as an additional insured, shall waive
subrogation against the Ministry, and shall provide that it may not be cancelled except
upon thirty (30) Days prior written notice to the Ministry. A certificate evidencing such
insurance policy shall be furnished to the Ministry within ninety (90) Days of the
Effective Date. The limits, coverage, deductibles and other terms thereof shall be
subject to approval in writing by the Ministry. To the extent that such third party
liability insurance is unavailable or is not obtained, or does not cover part or all of any
claims or damage caused by or resulting from Hydrocarbons Operations, the Contractor
shall remain fully responsible and shall defend, indemnify and hold the Ministry
harmless against all such claims, losses and damages of any nature whatsoever.
27.2 Indemnification. Subject to Section 27.3, the Contractor shall indemnify, defend and
hold the Government harmless against all claims, losses and damages of any nature
whatsoever, including, without limitation, claims for loss or damage to property or
injury or death to persons, caused by or resulting from any Hydrocarbons Operations
conducted by or on behalf of the Contractor, provided that the Contractor shall not be
held responsible to the Government under this Section 27.2 for any loss, claim, damage
or injury caused by or resulting from any negligent action of personnel of the
Government or from any environmental contamination existing in the Contract Area on
or prior to the Effective Date. The Ministry shall be solely responsible for its use of and
or reliance upon any interpretations, reservoir descriptions, recommendations or advice
furnished by the Contractor, the accuracy, correctness or completeness of which has not
been expressly warranted by the Contractor.
55
WS
Amu Darya Basin EPSC
27.3 Limitation on Liability. Neither Party shall be liable to the other Party (and for the
benefit of the Contractor, the Ministry agrees that no subcontractor of the Contractor
shall be liable to the Ministry) for reservoir or formation damage, inability to produce,
loss of use or disposal of Hydrocarbons, loss or deferment of income, loss of profits,
punitive damages, exemplary or indirect damages, business interruption damages or loss
of goodwill arising out of a breach of this Contract or in connection with Hydrocarbons
Operations, including under any indemnity provision under this Contract, unless such
Party has caused the damages or losses by its willful misconduct or gross negligence.
Reference to “willful misconduct or gross negligence” means (a) a marked and flagrant
departure from the standard of conduct that a reasonable and prudent person acting in
such circumstances would have been expected to display at the time of the purported
misconduct, or such wanton and reckless conduct as constitutes in effect an utter
disregard for harmful, foreseeable, and avoidable consequences; or (b) an act or failure
to act with knowledge or reckless disregard of the harmful, foreseeable, and avoidable
consequences. Nothing contained in this Section 27.3 shall limit any obligations of
either Party under applicable law or regulation in respect of its activities or limit any
remedies available to any regulatory agency (except for the Contractor's limitation of
liability under this provision).
ARTICLE XXVIII
ASSIGNMENT AND SUBCONTRACTORS
28.1 Assignment. Subject to Article XXXVI, the Contractor may not sell, assign, transfer,
convey, pledge or otherwise dispose of any part or all of its rights or obligations under
this Contract to any person or entity, unless approved by the Council of Ministers and
subsequently authorised by the Ministry. In the case of any assignment authorised
under this Section 28.1, the assignor shall provide to the Ministry an unconditional
undertaking by the assignee to assume all obligations of the assignor under this
Contract. The assignment, encumbrance or transfer of this Contract or interests
hereunder shall not affect any liability that the assignor has incurred prior to the date
upon which such assignment, encumbrance or transfer takes effect. Notwithstanding
such undertaking, the assignor shall remain jointly and severally liable with the assignee
for performance of the obligations of the assignor unless the assignor assigns its entire
interest under this Contract.
28.2 Indirect Transfers; Change of Control. The Ministry shall have the right to terminate
this Contract upon notice to the Contractor if, without the prior approval of the Council
of Ministers and subsequent approval of the Ministry: (i) the Contractor, CNPCI, or
Watan shall, during the life of this Contract, undergo, directly or indirectly, a change in
control (it being understood that for this purpose “control” means the power, directly or
indirectly, to direct or change its management or policies, whether through ownership of
shares or other voting securities or by any other means); or (ii) CNPCI, Watan or any of
their respective Affiliated Entities sells, assigns, transfers, conveys, pledges or otherwise
disposes, directly or indirectly, of any interest in the Contractor. Notwithstanding the
foregoing, nothing in this Article XXVIII shall prohibit CNPCI, Watan or any other
56
Amu Darya Basin EPSC
entity holding an ownership interest in the Contractor from entering into any merger,
acquisition or other business combination.
28.3 Application to the Ministry. Any proposed assignment, change of control or reduction
of ownership interest shall be notified to the Ministry in advance together with an
application which shall include:
(a) the name, address and nationality of the third party;
(b) in the case of the third party organized as a corporation:
(i) its place of registration or incorporation, its principal place of business, the
names, addresses and nationality of the directors, principal officers and
authorised signatories of the company and its capital structure;
(ii) the corporate structure of the third party, its parent company, if any, and
other Affiliated Entities;
(iii) financial information on the third party and its parent company, if any,
including annual reports, audited balance sheets and profit and loss
statements for the past three years, and any reports of relevance for the
Hydrocarbons Operations which the third party or its parent company may
have filed with government agencies responsible for securities regulation
during that period;
(c) how the Hydrocarbons Operations would be financed;
(d) the third party’s previous experience and technical expertise in Hydrocarbons
Operations, specifically including the third party’s experience in developing
countries;
(e) information concerning experience and technical competence of significance to
the area or areas to which an application applies;
(f) a description of the organization and expertise which the third party will have
available in Afghanistan and elsewhere for activities in connection with the
Contract Area;
(g) a description of the relevant equipment, machinery, tools and personnel that will
be available for the Hydrocarbons Operations of that third party;
(h) an indication of who in Afghanistan will be the representative in relation to the
authorities;
(i) a description of the third party’s experience and procedures that will apply for
securing the health, safety and welfare of persons involved in or affected by the
Hydrocarbons Operations;
57
Amu Darya Basin EPSC
(j) a description of the third party’s experience and procedures that will apply for
protecting the environment, preventing, minimizing and remedying pollution and
other harm from the Hydrocarbons Operations;
(k) proposals with respect to the training of Afghan nationals and expenditures to be
incurred therefor;
(l) such guarantees required pursuant to Article 40, Section 14 of the Hydrocarbons
Law and as required herein; and
(m) such other particulars as the Ministry may reasonably require to be submitted
within a reasonable specified timeframe.
If such further information is not submitted within the specified timeframe, the
application shall be deemed to be withdrawn. The Ministry will not unreasonably
withhold its consent to any such assignment, change of control or reduction in ownership
interest, except that the Ministry may in its sole discretion withhold any such consent in
the event of any transaction which would result in the ultimate parent entity of CNPCI
owning, directly or indirectly, less than fifty-one percent (51%) of the Contractor at any
time during the Exploration Phase.
28.4 Subcontractors. The provisions of this Article XXVIII shall not apply to the
engagement of subcontractors that are engaged to perform special operations or provide
services. The Contractor undertakes to provide copies of all such subcontracts to the
Ministry and the Ministry of Finance.
ARTICLE XXIX
LAW OF THE CONTRACT
This Contract shall be governed by, construed under and interpreted in accordance with the laws
of Afghanistan, as such laws may be amended from time to time.
ARTICLE XXX
FORCE MAJEURE
Except as otherwise provided in this Article, each Party shall be excused from complying with,
or permitted to delay its performance of, this Contract, except for the payment of money due and
only with respect to those terms that are directly affected by the event in question, for so long as
such compliance is prevented or delay in performance is caused by Force Majeure. “Force
Majeure'’ shall mean any act or cause that is unforeseeable, unavoidable and reasonably beyond
the control of such Party and does not result from the fault or negligence of such Party, including
natural catastrophes, fires, earthquakes, strikes (except strikes by the Contractor’s employees),
wars (declared or undeclared), acts of terrorism, and acts of God. It is expressly understood that
Force Majeure shall not mean economic hardship or change in market conditions. In the event
58
Amu Darya Basin EPSC
that either Party hereto is rendered unable, wholly or in part, by any of these causes to carry out
its obligations under this Contract, such Party shall give notice and details of Force Majeure in
writing to the other Party within seven (7) Days after its occurrence. In such cases, the
obligations of the Party giving the notice shall be suspended during the continuance of any
inability so caused, and the duration of any period specified in this Contract for carrying out the
obligations affected by any of the aforesaid causes shall be extended for a period equal to the
impact of delay caused by the Force Majeure occurrence; and the term of this Contract shall be
extended accordingly, provided that such extension does not violate the laws of Afghanistan.
The Party claiming Force Majeure shall use all reasonable efforts to remove or correct the event
that gave rise to the Force Majeure. If the duration of a Force Majeure event exceeds three
hundred and sixty-five (365) Days, either Party shall have the right, upon notice to the other, to
terminate this Contract with respect to the part or parts of the Contract Area affected.
ARTICLE XXXI
ENTIRE CONTRACT AND AMENDMENTS
31.1 Entire Agreement. This Contract embodies the entire agreement and understanding
between the Contractor and the Ministry relative to the subject matter hereof, and
supersedes and replaces any provisions on the same subject in any other agreement
between the Parties, whether written or oral, prior to the date of this Contract.
31.2 Amendment. This Contract may not be amended, modified, varied or supplemented
except by mutual consent in writing, executed, endorsed and approved in accordance
with the Flydrocarbons Law, and signed by the Contractor and the Ministry.
ARTICLE XXXII
WAIVERS: CUMULATIVE REMEDIES
32.1 Express Waiver Required. Performance of any condition or obligation to be
performed hereunder shall not be deemed to have been waived or postponed except by
an instrument in writing signed by the Party that is claimed to have granted such waiver
or postponement.
32.2 No General Waivers. No waiver by either Party of any one or more obligations or
defaults by the other Party in the performance of this Contract shall operate or be
construed as a waiver of any other obligations or defaults, whether of a like or of a
different character.
32.3 Cumulative Remedies. All rights, powers, and remedies provided hereunder are
cumulative and not exclusive of any other rights, powers or remedies provided
hereunder or under applicable laws.
59
Amu Darya Basin EPSC
ARTICLE XXXIII
TRANSPARENCY IN AFGHAN HYDROCARBONS OPERATIONS
33.1 Transparency. The Ministry shall have the right to keep a copy of this Contract in the
Hydrocarbons Register, publish and keep publicly available and distribute to provincial
offices such information and reports on the Contract, related documents and the
Contractor as is required pursuant to the Hydrocarbons Law, any regulations issued
thereunder and internationally accepted norms relating to transparency in the extractive
industries, including production and financial data concerning all revenues from income
taxes, production shares, royalties, fees and other taxes and other direct or indirect
economic benefits received by the Ministry and all amounts paid by the Contractor
under or in relation to this Contract.
33.2 Trade Secrets. Notwithstanding the above, if such information concerns technical
devices, production methods, business analyses and calculations and any other industrial
and trade secrets and are of such a nature that others may exploit them in their own
business activities, the Ministry may approve that such information may rightfully be
subject to confidentiality for a certain period of time.
33.3 Press Release. All press releases and information intended to be reported to news
media relating to the contracting and/or Contract execution and/or Hydrocarbons
Operations shall be subject to prior mutual approval of both the Ministry and the
Contractor. Notwithstanding the foregoing, the Ministry may without the Contractor’s
consent report to news media or other public sources any information that the Ministry
is required by law to report and shall notify the Contractor of the information it reports
prior to such reporting if reasonably practicable.
ARTICLE XXXIV
NOTICES
All notices, reports and other communications required or permitted hereunder or any notices
that one Party may desire to give to the other Party shall be in writing in the English language
and deemed to have been properly delivered if personally handed to an authorised representative
of the Party for whom intended or sent by electronic mail, registered airmail or cable, except as
otherwise provided herein, at or to the address of such Party for whom intended as indicated
below, or such other address as either Party may from time to time designate by notice in writing
to the other Party:
THE CONTRACTOR: c/o CNPC International Ltd.
No. 6-1, Fuchengmen Beidajie, Xicheng District
Beijing, China 100034
Telephone +86 10 5855 1114
Fax+86 10 5855 1110
ATTN: Mr. BO Qiliang
60
Amu Darya Basin EPSC
MINIS TRY: Ministry of Mines
Pashtoonistan Watt
Across from Ministry of Finance
Kabul, Afghanistan
Telephone +93 (0) 202 100 309
ATTN: Director of Petroleum Authority
ARTICLE XXXV
EFFECTIVENESS AND REGISTRATION
35.1 Effective Date and Validity. This Contract, which has been endorsed by the Inter-
ministerial Commission, shall become effective and binding on the Parties on the
Effective Date. The Ministry shall inform the Contactor of the Effective Date within
forty-eight (48) hours thereof. The Ministry represents that is has all requisite power
and authority to enter into this Contract and perform its obligations hereunder and that
the execution, delivery and performance of this Contract by the Ministry has been duly
authorized in accordance with the constitutional and administrative procedures of the
Ministry and that only the approval of the Council of Ministers is required to give this
Contract legal effect.
35.2 Registration of Contract and License; Publication. Within ten (10) Days following
the Effective Date, the Ministry shall (i) register this Contract and the appurtenant
exclusive License for Hydrocarbons Operations in the Hydrocarbons Register and (ii)
publish in at least three (3) newspapers of national circulation in Afghanistan and on the
Ministry’s website an announcement summarizing the material terms of the Contract.
35.3 No Corrupt Action. Each Party represents and covenants that it is, and during the term
of this Contract will remain, in full compliance with all laws applicable to it prohibiting
corrupt business practices, including Article 69 of the Hydrocarbons Law.
ARTICLE XXXVI
CHANGE OF LAW
36.1 Structure of the Contractor Subject to Article XXVIII, the Ministry undertakes that in
the event that, at any time during the term of this Contract, the Hydrocarbons Law or
any other applicable law changes in such a maimer as to permit the Ministry to enter
into agreements similar to the Contract with more than one party, the Ministry shall, at
the request of the Contractor and at no cost to the Contractor, assign and novate this
Contract to CNPCI and Watan (or their Affiliated Entities) such that each such entity is
a party to the Contract with liability to the Ministry on a joint and several basis.
36.2 No Double Taxation. The Ministry acknowledges and agrees that the Contractor has
entered into this Contract in reliance on the Ministry’s representation that the revenues
61
vv;
Amu Darya Basin EPSC
generated from Hydrocarbons Operations for the Contractor’s account shall only be
subject to income tax once in Afghanistan. The Ministry represents that either the
Contractor shall be liable to pay Income Tax on such revenue or the owners of the
Contractor shall be liable to pay Income Tax on such revenue in accordance with
applicable laws. If at any time after the Effective Date, there is any change in the legal,
fiscal and/or economic framework applicable to the Contract (or the interpretation
thereof) which results in the Contractor and the owners of the Contractor both being
liable to pay Income Tax on such revenue, the terms and conditions of this Contract
shall be altered so as to restore the Contractor and the owners of the Contractor to the
same overall economic position as that which such person would have been in, had no
such change in the legal fiscal and/or economic framework occurred. If the Contractor
believes that its economic position, or the economic position of its owners, has been
detrimentally affected herein by a change or interpretation of law that results in a double
taxation of income, upon the Contractor’s written request, the Parties shall meet to agree
on any necessary measure to resolve the issue. Should the Parties be unable to agree on
a method to resolve the issue, the Contractor may refer the matter in dispute to expertise
proceedings as provided in Section 24.3, without the necessity of first referring the
matter to negotiation and mediation.
62
Amu Darya Basin EPSC
IN WITNESS WHEREOF, the Parties hereto have caused this Contract to be executed
by their respective duly authorised representatives as of the date first above written.
CNPCI WAT AN OIL AND GAS AFGHANISTAN
THE MINISTRY OF MINES OF THE
GOVERNMENT OF THE ISLAMIC REPUBLIC
OF AFGHANISTAN
63
Amu Darya Basin EPSC
EXHIBIT A
DESCRIPTION OF CONTRACT AREA
A-l
Amu Darya Basin EPSC
COORDINATES OF CONTRACT AREA
The Contract Area consists of the following three Blocks comprising the interiors of the
geographic regions described by the respective corners, stated with reference to the meridian of
Greenwich and the Equator:
KASHKARI BLOCK
65°45’ 0” E 36°25’ 0” N
66° 10' 0” E 36°25’0”N
66° 10’ 0” E 36° 0’ 0” N
65°45’ 0” E 36° 0’ 0” N
BAZARKHAMI BLOCK
65°25’ 0” E 36° 25’ 0” N
65°45’ 0” E 36° 25’ 0” N
65°45’ 0” E 36° 5’ 0” N
65°25’ 0” E 36° 5’ 0” N
ZAMARUDSAY BLOCK
64° 35’ 0” E 36° 20’ 0” N
65°25’ 0” E 36° 20’ 0” N
65°25’ 0” E 36° 5’ 0” N
65° 0’ 0” E 36° 5’ 0” N
65° 0’ 0” E 36° 10’ 0” N
64° 35’ 0” E 36° 10’ 0” N
A-2
V.
Amu Darya Basin EPSC
COORDINATES OF QUADRANTS CONTAINING THE DESIGNATED FIELDS
The Designated Fields consist of the following five Fields located in the quadrants comprising
the interiors of the geographic regions described by the respective comers, stated with reference
to the meridian of Greenwich and the Equator:
ANGOT FIELD
65° 55’ 0” E 36° 15’ 0” N
66° 05’ 0” E 36° 15’ 0” N
66° 05’ 0” E 36° 10’ 0” N
65° 55’ 0” E 36° 10’ 0” N
KASHKARI FIELD
65° 55’ 0” E 36° 10’ 0” N
66° 0’ 0” E 36° 10’ 0” N
66° 0’ 0” E 36° 5’ 0” N
65° 55’ 0” E 36° 5’ 0” N
AQ DARYA FIELD
66° O’ 0” E 36° 10’ 0” N
66° 5’ 0” E 36° 10’ 0” N
66° 5’ 0” E 36° 5’ 0” N
66° 0’ 0” E 36° 5’ 0” N
BAZARKHAMI FIELD
65° 40’ 0” E 36° 15’ 0” N
65°45’ 0” E 36° 15’ 0” N
65°45’ 0” E 36° 10’ 0” N
65° 40’ 0” E 36° 10’ 0” N
ZAMARUDSAY FIELD
65° 10’ 0” E 36° 15’ 0” N
65° 20’ 0” E 36° 15’ 0” N
65° 20’ 0” E 36° 10’ 0” N
65° 10’ 0” E 36° 10’ 0” N
A-3
w?
Amu Darya Basin EPSC
EXHIBIT B
MAP OF CONTRACT AREA
B-l
Amu Darya Basin EPSC
CLASS
B-2
EXHIBIT C
ACCOUNTING PROCEDURES
TABLE OF CONTENTS
Page
ARTICLE I General Provisions..................................................................................................C-3
1.1 Definitions and Scope..................................................................................................C-3
1.2 Inconsistency...............................................................................................................C-3
1.3 Accounting Records and Reports................................................................................C-3
1.4 Language and Units of Account..................................................................................C-4
1.5 Cash Basis....................................................................................................................C-4
1.6 “R” Factor Expenditure Account.................................................................................C-4
1.7 “R” Factor Income Account........................................................................................C-6
1.8 Arm’s Length Transactions.........................................................................................C-6
1.9 General Exclusions......................................................................................................C-6
1.10 Currency Exchange Rates............................................................................................C-8
1.11 Acceptance of Costs....................................................................................................C-8
ARTICLE II Accounting Methods and Principles......................................................................C-8
2.1 Labour Costs................................................................................................................C-8
2.2 Material Costs..............................................................................................................C-8
2.3 Technical Services Costs.............................................................................................C-9
2.4 Insurance and Claims...................................................................................................C-9
2.5 Legal and Litigation Costs...........................................................................................C-9
2.6 General Administration and Services Overhead Costs..............................................C-10
2.7 Office Costs, et cetera, in Afghanistan and Dubai....................................................C-10
2.8 Land Use and Surface Rental Fees............................................................................C-10
2.9 Training Costs............................................................................................................C-10
ARTICLE III Audit and Inspection Rights of the Ministry......................................................C-10
APPENDIX 1 Example Calculation of Escrow Under Section 7.3(c) of the Contract.............C-12
APPENDIX 2 Procurement Manual..........................................................................................C-13
C-2
EXHIBIT C
ACCOUNTING PROCEDURES
ARTICLE I
General Provisions
1.1 Definitions and Scope
The Accounting Procedures described herein are to be followed and observed in the
performance of both Parties’ obligations for purposes of Article X of the Contract.
Except as otherwise provided in the Contract, these Accounting Procedures shall not
apply to the Contractor’s Income Tax obligations, which shall be governed by the
provisions of the Income Tax Law (2009) as amended or replaced and in effect from time
to time.
The definitions appearing in Article I of the Contract shall also apply to this Exhibit C.
In order to determine the “R” Factor, the Contractor shall keep a particular system of
accounts to record, in U.S. Dollars, income and expenditure related to the Hydrocarbons
Operations. This system shall consist of two main accounts: the “R” Factor Income
Account, and the “R” Factor Expenditure Account as defined in this Exhibit C. A
separate system of accounts shall be kept in respect of Hydrocarbons Operations relating
to (i) the Designated Fields and (ii) each Block (excluding any Designated Fields in such
Block).
1.2 Inconsistency
In the event of any inconsistency or conflict between the provisions of this Exhibit C and
the other provisions of the Contract, the other provisions of the Contract shall prevail.
1.3 Accounting Records and Reports
(a) The Contractor shall establish and maintain at its business office in Afghanistan
complete accounts, books and records of all revenues, costs and expenses relating
to all Hydrocarbons Operations hereunder in accordance with International
Financial Reporting Standards and generally accepted procedures and standards in
the international petroleum industry. Such accounts, books, records and reports
will be available for the inspection and use of the Government and its
representatives in carrying out its supervisory, financial and fiscal functions under
the Contract.
(b) All accounts, books, records, reports and statements will be prepared in
accordance with the Contract, the laws of Afghanistan, and where there are no
C-3
relevant provisions of either of these, in accordance with International Financial
Reporting Standards and International Best Practices.
(c) The Ministry may, in accordance with the prevailing laws and regulations, from
time to time by no less than thirty (30) Days notice to the Contractor, specify the
style, format and level of details of the reports, documents and materials that
Ministry may reasonably require from the Contractor.
1.4 Language and Units of Account
Unless otherwise agreed or prescribed in prevailing legislation, all accounts, records,
books and reports shall be maintained and prepared in the English language and shall be
recorded in U.S. Dollars.
1.5 Cash Basis
All financial books, accounts and records shall be prepared on a cash basis. All cash
receipts and cash expenditures will be attributed to the time period in which the cash
receipt or expenditure is realized.
1.6 “R” Factor Expenditure Account
Hydrocarbons Operations Expenditures may consist of capital and operating expenditures
as follows:
(a) Capital Expenditures
Capital expenditures are those Hydrocarbons Operations Expenditures for assets
that normally have a useful life that extends beyond the year in which the asset
was acquired.
In addition to expenditures relating to assets that normally have a useful life
beyond the year in which the asset was acquired, the costs of exploration and
development operations, as described in Sections 1.6(a)(v), (vi), (vii), (viii), (ix),
and (x) of this Exhibit C, will be classified as capital expenditures. Capital
expenditures shall be reduced by the amount of any proceeds received by the
Contractor from sales of Liquid Hydrocarbons or Natural Gas produced during
production testing, such sales to be valued at the net realized price obtained by the
Contractor therefor.
Capital expenditures include, but are not limited to, the following:
(i) Construction utilities and auxiliaries - work shops, power and water
facilities, warehouses, and field roads. Cost of Liquid Hydrocarbons
treating plants and equipment, secondary recovery systems, Natural Gas
plants and steam systems;
C-4
(ii) Construction housing and welfare housing - recreational facilities and
other tangible property incidental to construction;
(iii) Production facilities - production rigs (including the costs of labour, fuel,
hauling and supplies for both the offsite fabrication and onsite installation
of rigs, and other construction costs in erecting rigs and installing
pipelines), wellhead equipment, subsurface lifting equipment, production
tubing, sucker rods, surface pumps, flow lines, gathering equipment,
delivery lines and storage facilities;
(iv) Movables - surface and subsurface drilling and production tools,
equipment and instruments, barges, floating craft, automotive equipment,
aircraft, construction equipment, furniture and office equipment and
miscellaneous equipment;
(v) Development and production drilling - labour, materials and services used
in drilling Wells with the object of penetrating a proven reservoir,
including the drilling of delineation Wells as well as redrilling, deepening
or recompleting Wells, and access roads, if any, leading directly to Wells;
(vi) Exploration drilling - labour, materials and services used in the drilling of
Wells with the object of finding unproven reservoirs of Liquid
Hydrocarbons and Natural Gas, and access roads, if any, leading directly
to Wells;
(vii) Surveys - labour, materials and services used in aerial, geological,
topographical, geophysical and seismic surveys, and core hole drilling;
(viii) Security and De-mining - the engagement of private security providers
licensed in Afghanistan and de-mining or mine clearance costs associated
with Hydrocarbons Operations;
(ix) Third-Party Assessments - the engagement of internationally recognized
third parties to conduct assessments, including Baseline Environmental
Assessments, wireline, well-logging and testing, logistics, security and de-
mining assessments;
(x) Other exploration expenditures - auxiliary or temporary facilities having
lives of one year or less used in exploration and purchased geological and
geophysical information; and
(xi) Any expenditures in relation to the foregoing incurred prior to the
Effective Date of the Contract, provided the Ministry has provided
approval in writing of such expenditure.
Operating Expenditures
C-5
\
Operating expenditures are all Hydrocarbons Operations Expenditures other than
capital expenditures.
“R” Factor Income Account
The following shall be recognized as income and recorded in the “R” Factor Income
Account:
(a) The value of Cost Recovery Hydrocarbons allocated to the Contractor in
accordance with Section 10.1(b) of the Contract.
(b) The value of Net Hydrocarbons allocated to the Contractor in accordance with
Section 10.1(c) of the Contract, determined in accordance with the Formula Price
applicable to such Hydrocarbons.
(c) Income from sales of assets acquired by the Contractor for Hydrocarbons
Operations, the cost of which was recorded in the “R” Factor Expenditure
Account.
(d) Income from services rendered to third parties involving personnel whose
remuneration and benefits are recorded in the “R” Factor Expenditure Account
and/or involving goods whose acquisition cost has been recorded in the “R”
Factor Expenditure Account.
(e) Income from letting assets belonging to the Contractor, whose acquisition cost has
been recorded in the “R” Factor Expenditure Account or subletting of goods
whose hire is charged to the “R” Factor Expenditure Account.
(f) Compensation received from insurance policies taken out in relation to Contract
activities for damaged goods, including compensation for loss of profits.
(g) Income resulting from the exchange of currency in accordance with Section 1.10.
(h) Other income representing credits applicable to charges to the “R” Factor
Expenditure Account.
Arm’s Length Transactions
Except as may be otherwise agreed in writing between the Ministry and the Contractor,
all transactions giving rise to revenues, costs or expenses which will be credited or
charged to the books, accounts, records and reports prepared, maintained or submitted
hereunder shall be conducted at arm’s length or on such a basis as will assure that all
such revenues, costs or expenses will not be higher or lower, as the case may be, than
would result from a transaction conducted at arm's length on a competitive basis with
third parties.
1.9 General Exclusions
The following expenditures shall not be included in Hydrocarbons Operations
Expenditures:
(a) costs and expenses incurred at any time prior to the Effective Date, except any
expenditures pursuant to Section 1.6(a)(xi);
(b) costs relating to Hydrocarbons refining, marketing or transportation beyond the
Delivery Point;
(c) contributions and donations, except those approved by the Government;
(d) gifts or rebates to suppliers, and gifts or commissions to intermediaries arranging
service or supply contracts;
(e) any costs relating to the provision of the Financial Guarantee including payments
made to the Ministry pursuant thereto or otherwise for failure to perform the work
commitments in accordance with Section 6.3 of the Contract;
(f) any interest, fees and other financial charges relating to loans and credits obtained
by the Contractor to acquire funds for the execution of Hydrocarbons Operations,
as well as amortization of such loans and credits;
(g) any fines, interest, monetary corrections or increases in expenses resulting from
the Contractor's failure to comply with its obligations under the Contract,
applicable law or agreements with third parties;
(h) overhead or payments to any Affiliated Entity of the Contractor or CNPCI or
Watan that do not comply with Section 1.8 and are not otherwise allocable to
Hydrocarbon Operations Expenditures pursuant to Section 2.6;
(i) any other expenditures not directly related to Hydrocarbons Operations or not in
compliance with the provisions of this Exhibit C; and
(j) costs that would otherwise be recoverable as Hydrocarbons Operations
Expenditures but exceed by ten percent (10%) or more the approved Work
Programme Budget as may be amended by the Parties from time to time;
provided, however, that costs in excess of one hundred and ten percent (110%) of
any approved Work Programme Budget shall be included in Hydrocarbons
Operations Expenditures where such costs are associated with emergency
measures taken in accordance with Section 23.9 of the Contract. Without
prejudice to the foregoing, costs that are less than ten percent (10%) in excess of
the approved Work Programme Budget shall be recovered as Hydrocarbons
Operations Expenditures without need for further review by the Ministry.
The following shall not be recognized as income for the purposes of calculating the “R”
Factor:
C-7
(a) Financial income in general.
(b) Income received for services rendered by the Contractor or sales of the
Contractor’s assets occurring before the Effective Date.
(c) Income received for activities not related to the Hydrocarbons Operations.
1.10 Currency Exchange Rates
For conversion purposes between Afghanis, or any other currency, and U.S. Dollars, the
average of the buying and selling rate of exchange shall be used as issued by Da
Afghanistan Bank on the first Day of the Month in which the revenues, costs or expenses
are recorded.
1.11 Acceptance of Costs
The acceptance by the Ministry of the values and treatment proposed by the Contractor
relating to all costs and expenses may be conditional upon the presentation by the
Contractor, following a request by the Ministry or its representatives, of all records and
original documents supporting such costs and expenses, such as invoices, cash vouchers,
debit notes, price lists or similar documentation verifying the value and treatment
proposed.
ARTICLE II
Accounting Methods and Principles
Hydrocarbons Operations Expenditures incurred hereunder shall be calculated and
accounted for in a manner consistent with the following principles and definitions and
shall include:
2.1 Labour Costs
Costs of salaries and wages of the Contractor’s employees directly engaged in
Hydrocarbons Operations, including costs of holidays, vacations, sickness, living and
housing allowances, travel time, bonuses and other established plans for employee
benefits customarily granted to the Contractor’s employees and their families in similar
ventures.
2.2 Material Costs
Costs of materials, equipment, machines, tools and any other goods of a similar nature
used or consumed in Hydrocarbons Operations, subject to the following:
Acquisition - the Contractor shall only supply or purchase materials for use in
Hydrocarbons Operations that may be used in the foreseeable future. The accumulation
of surplus stocks and inventory shall be avoided. Inventory levels shall, however, take
into account the time lag for replacement, emergency needs and similar considerations;
\
C-8
WJ
Components of Costs - costs of materials purchased by the Contractor for use in
Hydrocarbons Operations may include, in addition to the invoice price for such materials
(subtracting the discounts given, if any) and provided that they are properly documented
with invoices:
(a) freight costs and costs of transportation between the supply point and delivery
point (provided that such costs are not included in the invoice price);
(b) inspection costs;
(c) insurance; and
(d) customs duties, taxes and other items that may be charged to imported materials
or to materials purchased in Afghanistan; and
Inventories - the Contractor shall maintain both a physical and accounting inventory of
all materials in stock in accordance with International Best Practices. The Contractor
shall make a physical inventory of all such materials at least once in any Year. The
Ministry may carry out total or partial inventories whenever it deems it necessary.
2.3 Technical Services Costs
The value of technical services costs relating to Hydrocarbons Operations, which shall
be:
In the case of technical services performed by third parties directly subcontracted,
including outside consultants, the contractors and utilities, the price paid by the
Contractor, provided that such prices are no higher than the prices charged by other
suppliers for comparable work and services; and
In the case of technical services performed by the Contractor or its Affiliated Entities,
prices which are no higher than the prevailing prices charged to other Affiliated Entities
of the Contractor and to third parties for comparable services.
2.4 Insurance and Claims
Costs relating to insurance, provided such insurance is customary, affords prudent
protection against risks and is at a premium no higher than that charged on a competitive
basis by insurance companies which are not Affiliated Entities of the Contractor. The
proceeds of any insurance or claim shall be credited against Hydrocarbons Operations
Expenditures. Except in cases where insurance coverage is required pursuant to Article
XXVII of the Contract, if no insurance is carried for a particular risk, all costs incurred by
the Contractor in settlement of any related loss, claim, damage or judgment, including
legal services, shall be includable in Hydrocarbons Operations Expenditures, provided
that such costs did not result from the Contractor’s gross negligence.
C-9
2.5 Legal and Litigation Costs
Costs and expenses of litigation and legal or related services necessary or expedient for
the protection of the Contract Area. Any damages or compensation received shall be
credited against Hydrocarbons Operations Expenditures. Under no circumstances may
the Contractor’s costs incurred in the course of arbitration entered into under Article
XXIV of this Contract be included in Hydrocarbons Operations Expenditures.
Overhead Costs
Overhead costs, other than direct costs, including:
(a) The Contractor’s personnel, personnel of CNPCI or Watan, and services costs,
incurred outside of Afghanistan, relating to administration, legal, accounting,
treasury, auditing, taxation, planning, employee relations, purchasing and other
functions required for Hydrocarbons Operations under the Contract; and
(b) Reasonable travel expenses of the Contractor’s, CNPCI’s or Watan’s personnel in
the general and administrative categories listed in (a) above for the purpose of
inspection and supervision of Hydrocarbons Operations in Afghanistan;
shall be allocable to Hydrocarbons Operations Expenditures according to methods agreed
to by the Contractor and the Ministry. The methods agreed shall result from a detailed
study and the methods selected following such study shall be applied each Year
consistently unless otherwise agreed by the Parties. These general and administration
and services overhead costs shall not exceed two percent (2%) of the direct costs incurred
in Hydrocarbons Operations in each Month.
2.7 Office Costs, etcetera, in Afghanistan and Dubai
Staffing and maintenance of the Contractor’s head office in Afghanistan and other offices
in Afghanistan and Dubai, including rent, telephone and radio expenses, as well as the
expenses of general facilities such as bases, warehouses, water, power and
communications systems, roads and bridges.
2.8 Land Use and Surface Rental Fees
Any compensation paid to private landowners or occupiers pursuant to Section 9.2 of this
Contract and any annual surface rental fees paid to the Ministry in respect of State-owned
land in accordance with Article XIV of this Contract shall be included in Hydrocarbons
Operations Expenditures.
2.9 Training Costs
Any expenditures pursuant to Sections 20.1 or 20.2 of this Contract for the purposes of
training Afghan nationals and Ministry personnel.
C-10
ARTICLE III
Audit and Inspection Rights of the Ministry
The Ministry, upon thirty (30) Days advance written notice to the Contractor, shall have
the right to inspect and audit, during normal business hours, the Contractor’s accounts,
books and records with respect to the Hydrocarbons Operations conducted hereunder.
During the Exploration Phase of the Contract, it may be necessary to conduct such an
examination at the Contractor’s or an Affiliated Entity’s office in Beijing, the People’s
Republic of China. Where this is the case, the Contractor agrees to reimburse the
Ministry direct economy airfare costs to and return from Beijing, the People’s Republic
of China, and a reasonable foreign per diem living allowance for a reasonable period for
two auditors to conduct such an examination. The cost of any audits or examinations by
the Ministry within Afghanistan shall be for its sole expense. Any audit exceptions must
be in writing within one hundred and eighty (180) Days following completion of such
audit and failure to give such written exception within such time shall establish the
correctness of the Contractor’s books and accounts.
For purposes of auditing, the Ministry may examine and verify, at reasonable times upon
prior notice to the Contractor, all charges and credits relating to the Hydrocarbons
Operations, such as books of account, accounting entries, material records and
inventories, vouchers, payrolls, invoices and any other documents, correspondence and
records necessary to audit and verify the charges and credits.
The auditors shall have the right in connection with such audit, to visit and inspect at
reasonable times, all sites, plants, facilities, warehouses and offices of the Contractor
directly or indirectly serving the Hydrocarbons Operations.
The Contractor shall include in its contracts with subcontractors provisions granting to
the Ministry the same audit and inspection rights in respect of the subcontractors that it
has in respect of the Contractor pursuant to this Contract.
The provisions of the present Article shall not infringe with the power of inspection for
authorised representatives of the Ministry pursuant to the laws and regulations of
Afghanistan.
All agreed adjustments resulting from an audit shall be made in the Contractor’s
accounts.
C-ll
APPENDIX 1
TO ACCOUNTING PROCEDURES
Example Calculation of Escrow Under Section 7.3(c) of the Contract:
At beginning of month,
ROUP = 2,000,000 barrels
Decommissioning and Abandonment Budget = US$ 2,400,000
Amount in Escrow Account = US$ 800,000
Net shortfall = US$ 2,400,000 - US$ 800,000 = US$ 1,600,000
Monthly production = 100,000 barrels
Monthly contribution = 100,000/2,000,000 x US$ 1,600,000 = US$ 80,000
At end of month,
ROIIP = 1,900,000 barrels
Amount in Escrow Account = US$ 880,000
C-12
APPENDIX 2
TO ACCOUNTING PROCEDURES
PROCUREMENT MANUAL
C-13
Procurement Procedure Manual (Revision 2.0)
Procurement Procedures
Table of Contents
1. Introduction
2. Procurement Objectives and Principles
3. Definitions / Abbreviations
4. Material Requisition forms and Approvals
5. Purchasing Method and Authority
6. Tender Procedure Flow
7. Purchase and Service Order Flow
8. Tender and Evaluation Methodology
9. Payment Policy
10. Tax and Duty Instructions
11. Expediting
12. Inspection
13. Receiving Material
14. Material Transfers and Returns
15. Ethical Practices Statement
16. Emergency Procurement
w;
Procurement Procedure Manual (Revision 2.0)
1.0 INTRODUCTION
1.1 PURPOSE OF THE MANUAL
1.1.1 The purpose of Operator (hereafter called “the COMPANY”) Procurement
Procedures Manual (hereafter called “Manual”) is to provide COMPANY with
guidelines and procedures that are to be adhered to in conducting its procurement
activities. Note that “procurement” covers both purchasing and contracting.
1.1.2 This manual is designed to ensure that:
The COMPANY procurement objectives, policies and principles are
explicitly stated and consistently applied;
a) Standards of ethics and fairness in procurement of materials and services
are maintained; and
b) Standard guidelines are presented to all departments in COMPANY.
1.2 SCOPE OF THIS MANUAL
1.2.1 This Manual shall apply to inquires and tenders issued and contracts entered
into for procurement of equipment, facilities, goods, materials, supplies and
services required by COMPANY for carrying out Hydrocarbons
Operations.
1.2.2 Failure to follow the procedures of this Manual for procurement may result
in the purchase or contract being disallowed from inclusion as a
Hydrocarbons Operations Expenditure under the CONTRACT.
1.3 CONTROL OF THE MANUAL
1.3.1 The Procurement Department of the COMPANY shall be responsible for
the contents of the manual and shall ensure that all relevant functional and
procedural checks have been made before authorizing any amendment
thereto.
2.0 PROCUREMENT OBJECTIVES AND PRINCIPLES
2
Procurement Procedure Manual (Revision 2.0)
2.1 COMPANY PROCUREMENT OBJECTIVES
The COMPANY’S objectives in procurement and contracting are to ensure
that all equipment facilities, goods, materials, supplies and services required
for Hydrocarbons Operations are obtained at the right time in the right
quantity and right quality at the right price from the right sources.
2.2 COMPANY PROCUREMENT PRINCIPLES/POLICIES
The following shall form the basis of COMPANY’S procurement
principles/policies for purchases and contracts;
2.2.1 All procurement of equipment, facilities, goods, materials, supplies and
services required for Hydrocarbons Operations shall be on arms length basis
and shall be obtained as a result of competitive bidding. Any deviation shall
be fully justified by a technical and cost-benefit analysis and shall provide
the report to detail the reason, and shall be agreed in writing by the
President.
2.2.2 All purchases and contracts shall be adequately covered under an approved
Work Program and Budget.
2.2.3 Contracts shall not be segmented to circumvent the requirement for
competitive bidding or to circumvent the requirements of the Limits of
Authority or to circumvent the need to obtain Partners.
2.2.4 Contracts shall at all times be awarded to the technically acceptable bidder
that offers the best overall cost advantage to the COMPANY. Contracts
may be awarded to companies on other considerations provided that the
quality of materials and services are not sacrificed.
2.2.5 Where technically possible and practicable, due consideration and
preference should be given to local companies to supply materials and
services provided they are competitive in price and in conformity to the
specifications, terms and conditions of the purchase inquires or tender
documents. Note that under Section 21.2 of the CONTRACT, locally
produced or available equipment, materials and supplies that cost no more
than 15 percent more than the equivalent imported equipment, materials or
services (before import duties) shall be deemed to be equivalent in price.
3
Procurement Procedure Manual (Revision 2.0)
2.2.6 The COMPANY shall have a program for qualification of local vendors to
be eligible to supply materials and services, with a goal of having at least
three qualified competitive local suppliers for every nontechnical good or
service generally available in the market. In resource-poor emergency or
special cases, with the written approval of President, 2 qualified
competitive local suppliers for every nontechnical good or service will be
acceptable.
2.2.7 Procurement of materials and contracts for services shall, as and when
practicable, be grouped together to take advantage of bulk buying and
consolidation. All Divisions and Departments in the COMPANY shall
endeavor to plan and group their procurement requirements for each budget
year based on the foregoing principles.
2.2.8 Procurement of spare or salvage materials and services from affiliates of
CNPCI or Watan shall be priced at the lower of cost or market, plus
transportation and other charges. To take advantage of potential salvage
from other activities of CNPCI or Watan or their affiliates, from time to
time CNPCI, Watan, and their affiliates may make available to the
COMPANY spare or surplus materials or services previously purchased for
other projects or activities.
2.2.9 Tenders shall be advertised in a manner to ensure that all potential bidders
who are qualified have the opportunity to be aware of the tender.
3.0 DEFINITION / ABBREVIATION
The following definitions and/or abbreviations shall apply to this Manual:
3.1 AA
“Approving Authority” as designated in the COMPANY Limits of
Authority (LOA) Manual.
3.2 AGREEMENT
A document identifying and binding the parties to an agreement and
outlining all the applicable terms and conditions thereto.
3.3 BOARD OFDIRECTORS
“Board of Directors” means the board of directors of the Company.
3.4 COMPANY
4
Procurement Procedure Manual (Revision 2.0)
Means Operator.
3.5 CONTRACT
“CONTRACT” means EPSC, to explore and exploit hydrocarbons
resources in the Contract Area within the contract period.
3.6 INCOTERMS
“International Commercial Terms” as defined by the International
Chambers of Commerce outlining the responsibilities and obligations of
the parties in the purchasing supplying agreement. Examples of Incoterms
are FOB (Free on Board), CFR (Cost and Freight), CIF (Cost, Insurance
and Freight), etc.
3.7 ITB
“Invitation to Bid” means the document sent to an approved bidder for
purposes of inviting the bidder to submit a bona-fide proposal. The ITB
outlines the scope of supply/services required, and the proposed
contractual terms and conditions.
3.8 LOA
“Limits of Authority” means the levels of delegated responsibility and
accountability for approving of commitments accorded to the respective
management officer of Operator.
3.9 MR
“Materials Requisition” is a form raised by the user department and
approved according to the LOA, to request for the supply of materials
required for the operations as per approved budgets. The MR specifies
the description of the materials, the required delivery date, final
destination for delivery and estimated budgets. The MR is used by the
purchasing / materials personnel to source the items internally from
warehouse stock or to call against existing contracts, price agreements or
any open purchase orders or to initiate a new ITB/ purchasing inquiry.
3.10 PA
“Price Agreement” is a form of a long-term supply contract, normally
limited by a specified maximum quantity or maximum total price or
5
Procurement Procedure Manual (Revision 2.0)
duration of time. Supply and delivery of individual requirement is
initiated via an approved indent.
3.11 PO
“Purchase Order” is a company document issued by the COMPANY to
an approved Supplier for the supply and delivery of materials, the PO
will contain name and address of the supplier, the delivery required date,
the delivery point, the terms and conditions of purchase, the descriptions,
quantity and unit price of the individual line items and the total value.
The PO is to be signed by the AA according to Operator LOA.
3.12 SR
“Service Requisition” is a form raised by the user department and
approved according to the LOA, to request for the provision of service
required for operation as per approved budgets. The SR is used for the
contract personnel to source the required services either from existing
contract or service agreements or to initiate a new ITB.
3.13 TC
“Tender Committee” is an organization within the COMPANY, whose
responsibility is to oversee the proper conduct in the Procurement
activities, ensure all established policies and principles are being
followed and review and endorse the respective ITB, procurement
schedules, evaluation reports and award recommendation.
3.14 USER DEPARTMENT
The department holding the approved budgets, which is responsible to
raise the MR, SR or WO.
3.15 WO
“Work Order” is a form raised by the User Department and approved
according to the LOA to a service company for the provision of service.
The WO will contain name and address of the service company, the
phone and fax number or E-mail address, period of service, work site,
the terms and condition of service, scope of work, price etc.
4.0 MATERIAL / SERVICE REQUISITION FORMS AND APPROVALS
6
Procurement Procedure Manual (Revision 2.0)
4.1MR / SR APPROVAL
All Material/Service Requisitions must be approved and signed by User
Department and A A according to LOA. Without proper authorized
approval, Procurement Department shall not process the purchasing
request, unless written approval has been obtained from AA according to
LOA.
4.2 MR / SR PROFESSIONAL
The User Department will describe in detail the material and
specifications including Technical parameters model and/or part number
for each item as well as details of service required.
In case the description of the item is incomplete, Procurement
Department may return it to User Department for clarification and
modification. In those instances where the User Department has
indicated a technical preference in material, service or source of supply,
Procurement Department may, evaluate alternative sources. In all such
instances the User Department will be advised of the alternatives and
mutual agreement reached prior to placement of the commitment, of the
purchase order or contract as the case may be. All changes to the
requisition must be subject to LOA.
A soft copy of each MR/SR should be submitted to Procurement
Department for convenience of processing.
When raising any MR, User Departments should contact warehouse to
check the inventory first to ensure a reasonable stock.
All MR should be reviewed and item coded by warehouse supervisor
first before sending to Procurement Department.
4.3 CENTRALIZED ITEMS
For centralized items, the User Department shall send its detailed
requirement to the Department - in - Charge. The Department - in -
Charge will then compose a consolidated request and send the
consolidated material requisition with detailed specifications, on
Quarterly basis or as deemed necessary to Procurement Department for
action.
7 ws
Procurement Procedure Manual (Revision 2.0)
For the purpose of centralized control of materials, approval by the
Department - in - Charge will be required as follows, for example:
Department-in -Charge Material/Service Description
General Services Includes Office Vehicle, Catering,
House Rental, Maintenance, Furniture,
Book & Publication and Stationary.
Operation Vehicle, Fuel,
Air Conditioner.
Information Technology Computer, Photocopier, Telephone, Fax
Machine, Radio and Software, Overhead
Projector.
Human Resource Consultant, Labor, Direct Hires.
4.3 MR / SR ISSUE IN ADVANCE
Except for emergency requirement, all materials, equipment and service
requisitions should be planned in advance with a four to six month lead-
time in order to follow a normal bid evaluation and purchasing process.
Some daily-required materials like casing, bits, wellhead, mud and other
consumables, will be encouraged to be requisitioned in bulk, reducing
cost both for material and administration.
4.4 MR PLANNING
User Departments shall work out detailed material requisition plan each
year. The material requisition plan shall be presented to COMPANY
management for approval according to LOA. This is to establish the best
material stock to meet the User Departments needs. This timing may be
revised to suit the needs and planning of the operations.
4.6 MR /SR RECEIVING
The Manager of Procurement Department will be responsible to receive,
register and assign all Material/Service requisitions. The material
requisition will be forwarded to the Section Head of Purchasing for
8
Procurement Procedure Manual (Revision 2.0)
action. Service requisitions shall be forwarded to the Section Head of
Contracts for action. All requisitions shall be logged, with a unique
number for the purpose of tracking through Procurement and ultimately
to the User Department.
4.7 MR / SR FORMALITY
A Material/Service requisition prepared by the User Department will
include Budget Code, approved AFE Number and proper account coding.
The User Department is responsible to ensure that such information is
present and accurate.
5.0 PURCHASING METHOD AND AUTHORITY
5.1 SCOPE OF WORK
5.1.1 Procurement Department will be responsible for receiving Material or
Service Requisitions, and in consultation with the User Department,
preparing inquiry and tender documents, evaluating quotations or bids,
commercial terms, preparing Tender Committee approval documents,
issuing Purchase Orders or the result of evaluation of informal bids,
coordinating quality control and inspection, expediting delivery and
mobilization in international logistic, monitoring and analyzing material
receiving, transfer, and inventory through the Material Management
System.
5.2 PURCHASING METHOD AGAINST EXPENDITURE LEVELS
5.2.1 For the purchase and services not exceeding US $100,000, the
procurement method is subject to or governed by the terms of Single
Source; For the purchase and services not exceeding US $500,000, the
procurement method is subject to or governed by the terms of Inquiry
purchase ; For the purchase and service orders exceeding US $500,000,
and not exceeding US $2,000,000, the procurement method is subject to
or governed by the terms of Limited Tendering bidding; For the purchase
and service orders exceeding US $2,000,000, the procurement method is
subject to or governed by the terms of Public Tendering bidding.
5.2.2 Competitive sealed bids will be solicited for all material and service
requirements where the anticipated cost exceeds the limits set out below:
9
Procurement Procedure Manual (Revision 2.0)
(a) Material and/or Equipment supply where the anticipated cost
exceeds US $500,000 total requirement.
(b) Miscellaneous Service Contracts for operations maintenance
services where the anticipated costs exceed US$500,000 per job
or extend over a six (6) month time period.
(c) Except in special circumstances, such as bids could not arrive by
post and have to use e-mail, etc., competitive sealed bids will not
be solicited
5.2.3 Written and duly signed competitive quotations/bids must be received
for any material and/or service requirement.
5.2.4 Low value purchase, less than US$500,000 spot check price and rotate
opportunity to quote.
5.2.5 Consultants, Contractors and Agents who are required to purchase
materials and services on behalf of the COMPANY will be required to
follow the same procurement procedures.
5.2.6 Purchase Orders and Contracts may only be issued and signed by
authorized personnel or their delegate whom has been authorized by the
LOA of COMPANY.
5.3 PURCHASE ORDERS
5.3.1 Purchase Orders shall apply to all the purchasing activities for and by
COMPANY, for the acquisition of materials and or services.
5.3.1 Only authorized personnel can issue Purchase Orders according to the
LOA.
5.3.2 The Procurement Department shall register all Purchase Orders in the
PO register for ease of tracking.
5.4 SERVICE CONTRACTS
10
Procurement Procedure Manual (Revision 2.0)
5.4.1 Service Contracts apply to all the services provided by a contractor,
supplier, consultant, including, but not limited to drilling, oil testing,
production testing, seismic data acquisition, data processing and
interpretation, transportation, house rental, consultants and any other
supporting operations or services, etc.
5.4.2 Service contracts should be awarded according to the procurement
procedures and signed according to the LOA.
5.4.3 All contracts shall be vetted by the Legal Department/Legal Advisor to
safeguard the legal aspect and agreed to by the User Department.
5.4.4 All contracts will be registered and assigned a unique contract number
by the Procurement Department. The contract number shall be indicated
in all the related documents including invoices.
5.5 TERM PURCHASE ORDERS
5.5.1 In consultation with the User Departments, the term of the Purchase
Orders, are arranged by the Procurement Department for procurement of
equipment, materials, and/or supplies that are ordered frequently. This is
also known as a Price Agreement (PA).
5.5.2 Term Purchase Orders will be effective for a specific time period unless
it is in the best interest of COMPANY to extend or reduce the period.
Such extensions or reductions will be subject to approval assigned in the
LOA.
5.6 PURCHASE AND SERVICE ORDER APPROVAL AUTHORITY
5.6.1 Purchasing and service approval authority is derived from duly approved
material /service requisitions, and is subject to Bid Evaluation approval
authority or other approvals authorized according to LOA.
5.6.2 For the purchase and service orders exceeding US $500,000, Tender
Committee approval is required.
5.7 PURCHASE AND SERVICE ORDER SIGNING AUTHORITY
n
WS
Procurement Procedure Manual (Revision 2.0)
5.7.1 Purchase/Service Order signing authority is restricted to the AA
according to LOA.
5.8 CONTRACT SIGNING AUTHORITY
5.8.1 Contract signing authority is conveyed from duly approved service
requisition and is subject to competitive bidding procedures and AA
delegated by LOA.
5.8.2 Contract signing authority is limited to the A A according to LOA.
6.0 TENDER PROCEDURE FLOW
6.1 PURPOSE
6.1.1 To describe the normal practice to be followed when the purchase of
materials or services is subject to or governed by the terms and
conditions of a written contract or agreement.
6.2 TENDER PROCEDURE FLOW
6.2.1 Procurement Department shall receive Material Requisitions (MR) and
Service Requisitions (SR) from User Department with proper approvals
according to the LOA.
6.2.2 The Tender Working Team will be organized according to fender
Committee Working Procedures.
6.2.3 The Tender Working Team will draft the contract strategy, which shall
be reviewed by User Department Manager and Procurement Department
Manager, endorsed by President. This signed approved strategy will then
be presented to the Tender Committee for final review and approval.
6.2.4 The Tender Working Team shall prepare the Tender Documents and
have them reviewed by Legal Department/Legal Advisor, User
Department, Procurement Department, Finance and Planning
Department and HSE Department (if necessary).
12
Procurement Procedure Manual (Revision 2.0)
6.2.5 The President will seek input for adding Bidders to the short list
approved by the Tender Committee in cases where the estimated cost is
in excess of US $1,000,000 for material or US $1,500,000 for service.
6.2.6 The Secretary of Tender Committee will then formally issue the tender
as per approved short list and schedule. Tender invitation to bidders shall
be made at least 30 days before the closing date or otherwise decided by
tender working team.
6.2.7 In consultation with the User Department, the Secretary of Tender
Committee or his/her Designee will clarify bidders inquires.
6.2.8 The Secretary of Tender Committee, or his Designee will receive
bidding documents.
6.2.9 Tender Working Team will open bids, but in no case shall bids be
opened without three or more representatives being present. Bids will
not be opened prior to closing time.
6.2.10 Tender will be evaluated in a two layer system, i.e. technical evaluation
and the commercial evaluation according to Tender Committee Working
Procedure. “NOTE THE COMMERCIAL PORTION OF ANY
TENDER OR BID SHALL NOT BE OPENED UNTIL THE
TECHNICAL EVALUATION IS COMPLETED AND SIGNED OFF
BY ALL USER DEPARTMENT MANAGER (SV’AND THE
PRESIDENT ACCORDING TO LOA AND TENDER COMMITTEE
WORKING PROCEDURES.
6.2.11 A joint recommendation approved and signed by all User Departments
if required will be prepared and presented to Tender Committee.
6.2.12 The Tender Working Team will respond to all queries or questions on
clarifications requested by the Tender Committee. All major exceptions
proposed by the bidder will not be taken into consideration unless
approved by Tender Committee
13
Procurement Procedure Manual (Revision 2.0)
6.2.13 The Tender Committee will approve or comment on the
recommendation.
6.2.14 Once all questions have been answered and approvals given, the
Secretary will then prepare the letter of approval, signed by President,
according to Tender Committee Working Procedure.
6.2.15 Letter of Award will be prepared by the Secretary of Tender
Committee, reviewed by Legal Department/Legal Advisor and signed
by the President or other delegate according to LOA after receiving
approval.
6.2.16 If performance Bank Guarantee is applicable, the successful bidder
shall submit the required Bank Guarantee within 30 days after issuing
date of Letter of Award or signature of contract. The original Bank
Guarantee will be submitted and kept by Finance Department.
6.2.17 The Contract will be signed within one month from the date of Letter
of Award and by the President or other delegate according to LOA. In
case the contract value is more than US$4,000,000 the approval from
Board of Directors is required.
6.2.18 The original contract will be kept in Procurement Department for safe
keeping, and one more copy retained in procurement. Two copies will
be distributed to User Department, one copy to Finance/Planning
Department and any other copy will be available upon the approval of
Procurement Manager for department or person who requires a copy to
perform his/her duties related to the contract. Priced copies of purchase
orders and contracts will be supplied to those departments or persons
who require them for contract management.
7.0 PURCHASE AND SERVICE ORDER FLOW
7.1 PURPOSE
7.1.1 To describe the normal practice to be followed when the purchase of
materials or services is subject to or governed by the terms and
conditions of Purchase/Service Order.
14
Procurement Procedure Manual (Revision 2.0)
7.2 PURCHASE AND SERVICE ORDER FLOW
7.2.1 Material Requisitions (MR) and Service Requisitions (SR) shall be
received by Procurement Manager for proper approvals according to
LOA.
7.2.2 The Section Head of Purchasing will register and assign Material
requisition to Buyers.
7.2.3 The Buyer will issue at least 3 inquiries to the vendors from the
domestic or international market. EXAMPLE: Far East, Middle East,
Europe, and North America. The inquiry shall state the detailed material
specification and requirements along with COMPANY Standard terms
and conditions. The buyer will at all times source the materials or
services from at least three of the market locations or companies listed
above. Any deviation from this will require the Procurement
Department Manager’s written approval in advance.
7.2.4 The buyer shall state the complete information in its inquiries including,
but not limited to, specification, quantity, delivery and destination, time
for submission of quotation etc. No one shall disclose COMPANY
estimated cost to the supplier and the supplier’s competitor in any
circumstances.
7.2.5 The buyer shall receive the qualified quotations for the inquiry. After the
technical confirmation by User Department, the buyer will then prepare
a commercial evaluation to the Management or TC for approval as per
the requirement of LOA. The evaluation will be based on the DDP xxx,
Port XxxxxxxxHairatan Port of Entry only.
7.2.6 A material Requisition shall not be purposely split in an attempt to
circumvent the requirement for competitive bidding on LOA Manual on
the need to obtain Manager, Vice President, President approval.
7.2.7 The award of the Purchase /Service Order shall be based on the Bid
Evaluation and approved according to LOA. The Bid Evaluation Form
shall be supported by MR/SR, inquiries, quotations and prepared by the
>
15
wS
Procurement Procedure Manual (Revision 2.0)
Buyer, approved by Procurement Department Manager or other AA as
per LOA.
7.2.8 The Purchase Order (PO) shall only be signed by President as per LOA.
7.2.9 The original Purchase Order (PO) will be kept in Procurement
Department and copies shall be distributed to Logistics, User
Department, Finance Department, Warehouse, and any other department
or person requiring the information.
7.2.10Buyer may fill out a Payment Requisition (PR) duly verified by
Procurement manager and approved by Line Manager or President as per
LOA and submit it to the Finance Department for action. The Payment
Requisition (PR) shall be registered in the Accounting Management
System and the copy shall be retained in the Procurement Department.
The Payment Term refers to the Payment Policy hereinafter.
7.2.11 For the local purchase, the Payment requisition (PR) shall be attached to
the vendor’s original commercial invoices, with the tax stamp affixed to
the invoice prior to requesting payment. The buyer and Procurement
Department Manager must sign all payment requests which should be
duly approved by AA as per LOA prior to submission to Finance
Department for payment.
7.2.12 The Payment Requisition (PR) shall attach the copies of Purchase Order
(PO), Material Requisition (MR), Bill of Lading/Airway Bill, and
Packing List. The commercial invoice or pro-forma invoice sent by
courier or fax is needed for payment in advance.
8.0 TENDER AND EVALUATION METHODOLOGY
8.1 GENERAL
8.1.1 Upon selection of the supplier of material and/or service through the
sealed bid, price negotiation, written quotation, verbal quotation, rate
schedule, etc., the Procurement Department is responsible for ensuring
that the contractual agreement is properly documented and authorized.
And also that the following is included in the Purchase Order (PO): all
16
Procurement Procedure Manual (Revision 2.0)
pertinent cost, specifications, inspections, testing, services, technical,
routing, packaging, insurance, warranty information, payment terms,
promised delivery and delivery time constraint data.
8.1.2 The confidentiality of the information provided above must be strictly
observed and not used for personal gain and/or divulged to any third
parties. Breach of or failure to comply and follow this guideline will be
grounds for immediate dismissal from the employ of COMPANY or
punishment.
8.2 TC WORKING PROCEDURES
As per Tender Committee Working Procedures in the separate document.
9.0 PAYMENT POLICY
9.1 PURPOSE
9.1.1 To describe practices and procedures to be followed to provide
protection of COMPANY’S interests in cases where suppliers of services
or materials fail to perform.
9 2 PURCHASE ORDER
9.2.1 Payment to suppliers will be made within thirty (30) days after receipt of
vendor’s undisputed invoice and shipping documents, or Letter of Credit
as agreed in the Purchase Order or Contract.
9.2.2 In any case, 100 percent payment in advance will not be allowed unless
proper approval has been obtained. If the supplier does not accept net
thirty (30) days payment as described in Article 9.2.1., COMPANY can
accept payment in several installments, i.e. at placing Purchase Order, at
presentation of original shipping documents and/or thirty (30) days
presentation of shipping documents.
9.3 SERVICE CONTRACT BONDS
17
Procurement Procedure Manual (Revision 2.0)
9.3.1 The Bank Guarantees and/or Parent Company Guarantee may apply to
COMPANY service contracts. Unless otherwise approved by Tender
Committee, the Bank Guarantee will not be waived or reduced.
9.4 BID BOND
9.4.1 This is usually 2-5% of contract price and is provided by a bidder on a
project and it is payable to COMPANY, should the successful bidder not
accept the contract award.
9.5 PERFORMANCE BANK GUARANTEE
9.5.1 The performance bank guarantee is binding the contractor to complete
the contract. The performance bank guarantee will be five to ten (5-10)
percent of the contract value and be valid for sixty (60) days after the
contract has expired. If the contractor is unable to perform its obligation
against the contract, or major defects are found in the completed work
the performance bank guarantee will be paid to COMPANY
unconditionally.
10.0 TAX AND DUTY INSTRUCTIONS
10.1 GENERAL
10.1.1 All taxes are charged on all material purchases and service contracts
except where specifically exempt, or a tax exemption can be obtained.
10.1.2 The Purchase Order must indicate any item, which are exempt.
10.1.3 If unsure of the tax status on a specific item, on a Purchase Order,
contact the Finance/Planning Manager for assistance and clarification.
10.2 TAX
10.2.1 According to CONTRACT, the COMPANY will be permitted and shall
be exempted from all customs duties with respect to the importation of
certain listed machinery, equipment, material, vehicles, supplies and
18
Procurement Procedure Manual (Revision 2.0)
consumable or movable property which is a piece of capital equipment
and/or necessary for Hydrocarbons Operations .
10.2.2All goods and services purchased in Xxxxxxxx Afghanistan will be
subject to Xxxxx-x-Taxes Laws of XxxxxxxxAfghanistan. unless
exempted by CONTRACT. The COMPANY will not pay the VAT but
instead of issuing the VAT certificate for contractor or supplier to refund
from the government according to CONTRACT
10.2.3 Material re-exported from Xxxxxxxx Afghanistan may be exempt from
tax. However, all customs duty exemption certificates shall be kept by
Logistic Section, Procurement Department, for this purpose.
10.2.4 Tax policy and procedure questions regarding the import and/or export
of materials should be directed to the Finance/Planning Department
Manager.
10.2.5 All contractors shall be responsible for their own taxes, including but
not limited to Xxxxxxxx Afghanistan income taxes, sales taxes, etc. The
COMPANY will only assist contractors for the exemption of the
customs duties.
11.0 EXPEDITING
11.1 PURPOSE
11.1.1 The expediter is a delegated responsibility from the Procurement
Department. Expeditor or Logistic Supervisor is responsible of
supervising and follow up the custom clearance and transportation of
materials from and to the site. These missions are performed by agents
through a contract with specified obligations and price lists.
11.2 RESPONSIBILITIES
11.2.1 Expediter is responsible of seeking exemption and other necessary
governmental approvals for all the imported and exported materials and
submits the relevant documents to the agent.
19
WS
Procurement Procedure Manual (Revision 2.0)
11.2.2Expediter will follow up the custom clearance process to avoid the
occurrence of any delay and to ensure the process duration is within the
duration agreed upon and stated in the contract.
11.2.3 Expediter is responsible of measuring and weighing the consignments to
specify the load capacity of the trucks needed for inland transportation to
the site.
11.2.4 Full loads will be utilized at all times when and wherever possible.
This will include the holding of some items whenever conditions and
schedules will allow.
11.3 CUSTOMS CLEARANCE (IMPORT AND EXPORT)
The Logistic Section/Procurement Department will be responsible for the
custom clearance together with the custom clearance agent for the importation
of the equipments, materials, or personal effects into Xxxxxxxx (and also with
the export arrangements for any of the foregoing) and for regular maintenance
items and/ or emergency services.
11.3.1 For importation, the needed documents are
a. One Original of commercial invoice.
b. One original of Bill of Lading or Airway Bill.
c. One original of packing list
d. One original of certificate of Origin.
e. Three copies of the purchase order.
These documents will be prepared by Purchasing Section/Procurement
Department in sufficient lead - time (preferably 72 hours).
11.3.2 For exportation, the needed documents are:
(a) Two originals of commercial invoice {For custom purposes only}
(b) Two originals of packing lists
These documents will be prepared by the user end in the cases of
dispatching samples for testing and analysis, maintenance, warranty and
others.
20
Procurement Procedure Manual (Revision 2.0)
12.0 INSPECTION
12.1 PURPOSE
12.1.1 Inspection is performed preferably at the vendor’s manufacturing
facilities and alternatively at the storage or marshalling location prior to
shipment, or after it reaches the COMPANY operation site in order to
ensure that the material and equipment is of the same design, dimensions,
material and quality as specified and conforms to minimum
requirements of the COMPANY’S purchase order or contract.
Procurement Department will be responsible for, arranging and assisting
the User Department with inspection arrangements.
12.2 USER/PROCUREMENT DEPARTMENT RESPONSIBILITIES
12.2.1 User Department, via Material Requisition, is responsible for
determining any specific items that will require inspection.
12.2.2Procurement Department will indicate on the Purchase Order that the
material and/or equipment are subject to shipment, and the scope of
inspection.
13.0 RECEIVING MATERIAL
13.1 PURPOSE
13.1.1 To outline the practices to be followed when receiving materials and
services. Warehouse will follow this procedure.
13.2 GENERAL
13.2.1 The following general instructions apply for all receiving regardless of
the type of commitment document (purchase order, contract, etc.)
13.3 RECEIVING
21
\
Procurement Procedure Manual (Revision 2.0)
13.3.1 The person who receives goods or services from a supplier is responsible
to ensure that:
a) Quantities and description of services or materials received, and all
exceptions are properly recorded on the packing slip, time sheets,
waybill and or material receiving report. The purchase order number
shall be recorded on all documents.
b) A receiving exception report (over short damaged report) is
prepared for all shipments received that are not as ordered, or that are
over, short, or damaged.
c) Appropriate copies of the above documents are sent to Accounts
Payable who will attach to the supplier’s invoice, they may then
forward to User Department and/ or Procurement Department for
approval, or pay invoice directly in accordance with the Financial
Procedure.
MATERIAL TRANSFERS AND RETURNS
14.0
14.1 PURPOSE
14.1.1 To control and record the movement or transfer of materials, equipment
or services controlled or owned by COMPANY or in COMPANY’S
custody through the material management system.
14.2 SCOPE
14.2.1 The material transfer form is used to accomplish the above purpose and
is to be completed when:
a) Materials are moved from one cost center, AFE, or inventory location
to another.
b) Surplus materials are returned to suppliers for credit or in.
c) Materials are lost or destroyed.
d) Materials are sold to outsiders.
e) Materials are sent to outside suppliers or contractors for repair and will
be away more than 15 days or where otherwise necessary for control
purposes.
Procurement Procedure Manual (Revision 2.0)
f) Materials are returned from repairing suppliers or contractors as in
14.2.1 above.
g) Services are performed or supplied by COMPANY to or for contractors
and are chargeable to the contractor or other third party.
14.3 RESPONSIBILITIES
14.3.1 Complete and register the Materials Transfer Form in material
management system before the material moves or services are supplied.
14.3.2 Send the Materials Transfer Form to Accounting in Field Office.
14.3.3 Send a copy of Material Transfer Form to receiving Unit for signature.
15.0 ETHICAL PRACTISES STATEMENT
15.1 PURPOSE
15.1.1 The purpose of this policy is to provide guidance on ethical practices
when an employee, consultant, contractor, or agent is engaged in a
supplier - related activity.
15.2 GENERAL
15.2.lit is the responsibility of all employees to maintain the good name and
reputation of the COMPANY and its partners and to consistently
exercise good judgment in the interest of COMPANY. The COMPANY
and reputation for honest, forthright treatment of suppliers is an
indispensable asset.
15.2.2 In personal contacts with suppliers, all employees represent COMPANY
and their actions and decisions on behalf of COMPANY, must be
impartial and objective in the performance of their work.
15.2.3Employees must maintain an impeccable standard of integrity in all
transactions and must not allow themselves to be put into a position
where their judgment can be influenced or be seen to be influenced.
23
Procurement Procedure Manual (Revision 2.0)
15.2.4No employee shall use their authority of office or position for personal
gain, or other advantages. In any business transaction, the employees
must not allow themselves, to be put into a position, which might affect
or be seen by others as possibly affecting the employee’s judgment or
impartiality.
15.2.5 No employee shall seek or accept gifts other than items of small
intrinsic value that is not normally saleable and is designed primarily
for advertising and represents cordial relations only.
15.2.6No employee shall seek or accept any payments, loans or services from
any organization, company, or person doing or seeking to do business
with COMPANY.
15.2.7Any personal interest which may impinge or might reasonably be
deemed by others to impinge on an employee’s impartiality must be
declared to COMPANY in writing. This shall be ground for the
company to prohibit the employees from taking part in certain purchases
of products, goods or services as well in ITB for goods or services.
15.2.8No employee shall use or cause to be used, COMPANY’S name or the
employee’s title or position within COMPANY to obtain any benefits
for any other affiliated or unaffiliated company or organization without
proper management approval.
15.2.9The confidentiality of information received in the course of the
employee’s duties must be strictly observed at all times and shall not be
released to any other company, person, or organization and shall not be
used for personal gain or himself or others.
16.0 EMERGENCY PROCUREMENT
16.1 APPLICABILITY
16.1.1 From time to time, local management may be required to
purchase materials or services for the preservation of life, for protection
of the environment, or to prevent destruction of property. The emergency
24 w/£
Procurement Procedure Manual (Revision 2.0)
purchase materials or services should not exceeding US $500,000, and
such occasions are to last no longer than 48 hours without the written
approval of the President.
16.2 PROCEDURES
16.2.1 When an emergency situation occurs, the onsite manager must first take
action to preserve life, protect the environment, or prevent destruction of
property. As soon as is reasonably practicable, the onsite manager must notify
COMPANY of the nature of the emergency and the actions taken.
16.2.2 Procurement of materials or services under emergency circumstances is
presumed prudent and the policies in this manual are waived temporarily to the
extent necessary to contain the emergency for up to 48 hours.
16.2.3 Upon notice of the emergency, COMPANY will immediately activate
emergency procurement procedures. These may include previously
purchased services (e.g., well control, fire fighting) or services from
affiliates. If the emergency is of longer than 48 hours duration, local
management emergency procurement authority is superseded by the
COMPANY procurement authority. After procurement, the User
Department should submit purchase report to LOA relate personnel.
25
EXHIBIT D
FINANCIAL GUARANTEE FOR
MINIMUM EXPLORATION PROGRAMME
D-l
EXHIBIT D
FINANCIAL GUARANTEE
Ministry of Mines of the Islamic Republic of Afghanistan
Kabul
Islamic Republic of Afghanistan
Gentlemen:
Re: Our Irrevocable Letter of Guarantee No,
In compliance with the request of CNPCI Watan Oil and Gas Afghanistan Ltd. (the
“Contractor”), we, (Name of bank), issue this unconditional irrevocable letter of guarantee in
your favour for a sum not exceeding _ U.S. Dollars (US$
___), which represents the total estimated expenditures for the Minimum
Exploration Programme during [the Initial Exploration Period] [the First Extension Period] [the
Second Extension Period], as set forth in Part I of Exhibit H of the Exploration and Production
Sharing Contract (the “Contract”), dated December 26, 2011, between the Contractor and the
Ministry of Mines of the Government of the Islamic Republic of Afghanistan (the “Ministry”),
relating to Hydrocarbons Operations in Afghanistan, to guarantee the Contractor's faithful
performance of such Minimum Exploration Programme. The said sum of_
U.S. Dollars (US$_) shall be reduced as of the end of each Month in [the
Initial Exploration Period] [the First Extension Period] [the Second Extension Period] by the
amount determined in accordance with Section 8.2 of the Contract, as such amount is evidenced
by a signed certificate from the Ministry.
The terms and conditions of this Letter of Guarantee are as follows:
1. Capitalized terms used herein and not otherwise defined shall have the meanings as set
forth in the Contract.
2. The said amount, or any part thereof, shall be paid to the Ministry upon our receipt of
your demand by way of a written statement that the amount claimed is duly payable
under the Contract.
3. We hereby waive diligence, presentment, demand for payment, protest, any requirement
that the Ministry exhaust any right or power or take any action against the Contractor, all
notices (whether of non-payment by the Contractor, dishonour, protest or otherwise) and
all demands whatsoever. Our obligations hereunder are continuing, absolute and
unconditional, and will not be in any way affected by giving of time or any forbearance
by the Ministry, the waiver or consent by the Ministry with respect to any provision of
the Contract, and irrespective of the validity, regularity, enforceability or value of the
Contract, or by any other circumstances which might otherwise constitute a legal or
equitable discharge or defence of a surety or guarantor, all of which are hereby expressly
waived.
4. Our obligations hereunder shall be paid in U.S. Dollars to the bank account designated by
the Ministry, free and clear of and without reduction by reason of any and all present and
future taxes, levies, imposts, deductions, assessments, charges or withholdings
whatsoever levied, assessed, imposed or collected with respect thereto by the government
of [name of jurisdiction of issuing bank] or any political sub-division or taxing authority
thereof or therein. We shall bear and pay any and all fees and expenses in relation to or
in connection with this Letter of Guarantee.
5. In order to give effect to this Letter of Guarantee, we hereby declare that the Ministry
shall be at liberty to act as though we were the principal debtor, and we hereby waive all
and any of the rights as surety which may at any time be inconsistent with any of the
above provisions.
6. Any claim or demand under this Letter of Guarantee shall be presented to us on or before
the expiration of the date of the validity of this Letter of Guarantee.
7. This Letter of Guarantee shall be effective immediately [enter date that is ninety (90)
days after the last day of the Initial Exploration Period, the First Extension Period or the
Second Extension Period, as applicable], and thereafter automatically without any
formality become null and void for all its effects and this Letter of Guarantee shall be
returned to us immediately.
Yours very truly,
(Name of Bank)
D-3
WS
EXHIBIT E
GENERAL PERFORMANCE GUARANTEE
E-l
EXHIBIT E
GENERAL PERFORMANCE GUARANTEE
Reference is made to the Exploration and Production Sharing Contract (the “Contract''), dated
December 26, 2011, entered into between CNPCI Watan Oil and Gas Afghanistan Ltd. (the
“Contractor”) and the Ministry of Mines of the Government of the Islamic Republic of
Afghanistan (the “Ministry”).
With regard to the obligations assumed by the Contractor under the Contract or that may be
imposed upon the Contractor under or in connection with the Contract, we, CNPC International
Ltd. (the “Guarantor”), a corporation organized under the laws of Cayman Islands, agree as
follows:
1. Capitalized terms used herein and not otherwise defined shall have the meanings as set
forth in the Contract.
2. The Guarantor hereby expressly represents and warrants to the Ministry that (i) it is duly
organized, validly existing and in good standing order under the laws of its jurisdiction of
organization, (ii) it has all requisite corporate power and authority to execute, deliver and
perform this Guarantee, (iii) the execution, delivery and performance of this Guarantee
have been duly authorised by all necessary corporate action, (iv) this Guarantee
constitutes the legal, valid and binding obligation of the Guarantor, enforceable against
the Guarantor in accordance with its terms, (v) no governmental approvals are required in
connection with the execution, delivery and performance of this Guarantee, except as has
been obtained and is in force on this day of signature as set forth below, and (vi)
execution, delivery and performance of this Guarantee by the Guarantor will not violate
any provision of any existing law or regulation to which the Guarantor is subject or any
provision of the Guarantor’s constitutive documents or of any material agreements to
which it may be a party.
3. The Guarantor hereby unconditionally and irrevocably guarantees to the Ministry, as a
primary obligor, the due and punctual performance of all the obligations of the Contractor
under or in connection with the Contract.
4. This Guarantee is irrevocable and unconditional and shall remain in full force and effect
until all obligations of the Contractor under or in connection with the Contract are fully
and irrevocably satisfied and discharged, notwithstanding (a) any amendment or
termination of the Contract, (b) any extension of time, or (c) any delay or failure of the
Government in pursuing any remedies against the Contractor.
5. The Ministry shall have no obligation to pursue any remedy or take any action against or
in respect of the Contractor or any other Guarantor or surety prior to enforcing its right
directly against the Guarantor. In addition, the Guarantor may not claim that the Ministry
E-2
could have avoided or mitigated, in any manner or through any action, the damages
resulting from a default of the Contractor under the Contract or resort to any other
guarantee held at any time in its favour, before proceeding against the Guarantor in
connection with its obligations under this Guarantee. The Guarantor’s obligations under
this Guarantee shall be independent and absolute, and the Guarantor shall have no right to
set-off or counterclaim with respect to any other claims it may have against the
Government or any other Person.
6. All of the obligations of the Guarantor set forth herein shall bind the Guarantor and its
successors. The Guarantor may not assign or delegate its duties hereunder without the
prior written consent of the Ministry, and any purported assignment or delegation without
such consent shall be null and void. The Guarantor confirms that this Guarantee shall
remain in effect with respect to any assignee of the Contractor that is an Affiliated Entity
of the Contractor. Upon any such assignment the assignee shall be considered the
Contractor for all purposes hereunder to the extent of the assigned obligations. The
Guarantor also confirms that any assignee of the Ministry under the Contract may
exercise all rights and remedies of the Ministry under this Guarantee. No other person or
entity shall be a beneficiary of this Guarantee or have or acquire any rights by reason of
this Guarantee.
7. This Guarantee shall be governed and construed in accordance with the laws of
Afghanistan, as amended or replaced and in effect from time to time.
8. Any failure of the Ministry to exercise any right, in whole or in part, hereunder shall not
be construed as a waiver of the right to exercise the same or any other right.
9. No amendment or modification of this Guarantee shall be effective unless in writing and
signed by both the Guarantor and the Ministry.
10. Any dispute concerning the legal interpretation hereunder shall be settled in accordance
with Article XXIV of the Contract.
11. The Guarantor shall pay upon demand and presentation of invoices all reasonable and
actual costs and expenses incurred by the Ministry in connection with the successful
enforcement of this Guarantee, including, without limitation, reasonable fees and
expenses of counsel.
12. All notices, demands, instructions, waivers, consents or other communications hereunder
shall be in writing in the English language and deemed to have been properly effective
upon receipt, and shall be sent by personal delivery, courier, first class mail or fax to the
following addresses:
GUARANTOR: CNPC International Ltd.
No. 6-1, Fuchengmen Beidajie, Xicheng District
Beijing, China 100034
Telephone+86 10 5855 1114
Fax +86 10 5855 1110
ATTN: Mr. BO Qiliang
MINISTRY: Ministry of Mines
Pashtoonistan Watt
Across from Ministry of Finance
Kabul, Afghanistan
Telephone +93 (0) 202 100 309
ATTN: Director of Petroleum Authority
The Addresses and fax numbers by either Party for notices given pursuant to this
Guarantee may be changed by means of written notice to the other Party at least 14
working days prior to effective date of such change.
13. This Guarantee shall be effective immediately.
IN WITNESS WHEREOF, the Guarantor has caused this Guarantee to be executed and the
Ministry duly authorised the same, both parties represented by their respective duly authorised
representatives on this day of_.
CNPC INTERNATIONAL LTD.
By___
President
THE MINISTRY OF MINES OF THE
GOVERNMENT OF THE ISLAMIC REPUBLIC
OF AFGHANISTAN
By_
The Minister of Mines
E-4
EXHIBIT F
LONG RANGE PLAN FOR
THE TRAINING OF AFGHAN NATIONALS
F-l
EXHIBIT F
LONG RANGE PLAN FOR
THE TRAINING OF AFGHAN NATIONALS
Introduction
One of the fundamental principles of CNPCI is the development of local resources in the places
where we work. This consists primarily of a national workforce and reliable supporting suppliers
and service organizations. Our staffing philosophy has been developed over sixty-five years of
oilfield operations, in established, emerging and new oil sectors throughout the world. CNPCI is
committed to recruiting, training and developing nationals in all the countries in which we operate
and committed to complying with local laws and regulations. Our objective is to have, within
CNPCI, sufficient national personnel to completely staff all our operations in that country. To
ensure key employees are continually developed, we offer engineers the opportunity of overseas
assignments, which broaden their technical and experience horizons. Cultivation of international
talents is a key part of our internationalization strategy. On June 1, 2006, the International
Talents Training Project was launched in a aim to cultivate a group of international talents with
excellent specializations, work ethics, language skills, and a profound understanding of
management and international operation rules.
Workforce Nationalization
A competent national workforce at all levels of our local organizations is crucial in enabling us to
perform at a world class level. Engineers, managers and technical staff are especially important,
and significant resources are dedicated to recruiting, training and developing this population.
To ensure common, high standards of recruiting, we have a dedicated recruiting department that
focuses on recruiting engineers and technicians from the best universities and institutions in
Afghanistan. Our recruiters have the charter to hire sufficient national personnel to staff all our
operations in a particular country, and such is the case in Afghanistan.
Once an individual is recruited, he/she should follow a structured training programme. CNPCI
respects the personalities and interests of all employees and pays attentions to their career plans.
Through the skills cultivation, selection and allocation mechanism, we aim to create a suitable
development channel for every employee. Recruited employees follow a structured training
programme comprised of about [70%] technical material and about [30%] management material.
This split has been set to ensure that individuals are technically prepared for running any wellsite
operation as well as prepared to eventually take management positions.
10494821v3 !! PAGE ‘fl'l1
Development Plan, Career Paths, and Technical Training of Afghan Nationals
Any training programme shall incorporate a mix of theoretical and practical training. Some of
training courses we will provide are:
Health, Safety, and Environment:
Field Introduction, Specific Location Induction, H2S Safety, Explosives Safety, Radiation
Safety, Lifting & Stepping, Rig Safety, Language Training, Defensive Driving and Journey
Management, First Aid, all tailored to the needs of the individual's development plan.
The above training will be mandatory training for all Afghan national and expatriate technical
professionals to ensure safe operations in all hydrocarbons operations.
Technical Skills:
Technical training is key to all hydrocarbons operations. All new hires in Afghanistan hired
for technical positions will follow an intensive three-year technical training programme. A
technician training system is occupied to train front-line teams and cultivate highly skilled
staff. The training programmes for the different functions involved in hydrocarbons
operations will include intensive classroom and on-the-job training with regular review and
assessment.
Management:
We focus on the enhancement of management and innovative capabilities. All field
professional staff, irrespective of discipline, will participate in the following management skills
seminars:
• Introduction to Exploration & Production Industry (2 weeks)
• Basic Management Tools (1 week)
• People Skills (1 week)
• Finance (1 week)
Logistics:
In order to ensure success of this crucial role, we will focus on training logistics personnel in
local Afghan procedures as well as the provision of industry logistics.
10494821v3 I! PAGE H 21
Administration:
Centrally administered training for personnel, financial and legal, professional and
administrative staff, including computer training and language training.
E-learning in CNPC:
Our parent entity, China National Petroleum Corporation ("CNPC"), has developed CNPC E-
learning College, which is a specialized remote training institution devoted to establishing a
modem enterprise training system offering both classroom and online training. By leveraging
the network training resources of CNPC and its subsidiaries, the college provides employees
with an autonomic learning platform. About 20,000 person times of employees are expected
to be trained through the E-learning College in [2009]. The CNPC E-learning website also
provides a way for publics to learn more about petroleum.
Mentoring
CNPCI understands that to provide sustainable economic gains for Afghanistan, we must
facilitate learning-by-doing for our Afghan personnel to progressively assume greater leadership
roles and responsibility in hydrocarbons operations. CNPCI will pair senior project staff and junior
project staff to develop on-the-job mentoring opportunities. This approach will allow senior staff
to enter into a surge capacity on new sites and junior staff to step into more senior roles on
existing sites.
Ministerial Training Courses
In addition to developing Afghan nationals for the private sector, a wide range of courses and
programmes, covering all hydrocarbons operations, will be offered to ministerial staff. This will be
in addition to the mentoring required during the development of the Work Programmes. Such
courses could be in reservoir studies, evaluation, as well as modeling and production
management.
Nationalization Plan
Position Start Up 2013 2014
AFG % of Total AFG % of Total AFG % of Total
Management 0% 10% 20%
Engineers & Professionals 20% 30% 40%
Field Technicians 40% 50% 60%
10494821v3 I! PAGE
As seen in the table above, CNPCI is committed to developing Afghan national personnel to
assume positions at ALL levels within the organization.
Key Technical and Management Positions
Development of Afghan nationals into key technical and management jobs is an operational
priority. Several positions have been identified and targeted for Afghan national employees.
These positions will be tracked accordingly. The CNPCI plan for key technical and management
positions is illustrated in the following graph.
Nationalization by Key Positions
70%
60%
50%
Engineers &
40% *+ Professional Professionals
Manageme it
30% Field
Technicians
20%
10%
0%
Startup 2013 2014
10494821v3 !! PAGE T14-L
Training plan of students abroad and officer and staff from 2012 to 2014
Personnel Total Training site Content Budget
2012
Students abroad 2 China Professional education 10000
Governor Officer 2 China Management ,HSE, etc 12000
Management 5 Afghanistan HSE .Management,E-language, etc 6000
Engineers & 10 Afghanistan HSE , E-language, 9000
Professionals specialty knowledge
specialty skill, etc
technician 50 Afghanistan Operation skill, HSE, E-language ,etc 13000
2013
Students abroad 2 China Professional education 10000
Governor Officer 2 China Management ,HSE, etc 10000
Management 10 Afghanistan HSE .Management,E-language ,etc 8000
Engineers & 20 Afghanistan HSE , E-language, 12000
Professionals specialty knowledge
specialty skill ,etc
technician 100 Afghanistan Operation skill, HSE, E-language ,etc 15000
2014
Students abroad 2 China Professional education 10000
Governor Officer 2 China Management ,HSE, etc 10000
Management 15 Afghanistan HSE .Management,E-language, etc 11000
Engineers & 20 Afghanistan HSE , E-language, 14000
10494821v3 !! PAGE
Professionals specialty knowledge
specialty skill, etc
technician 150 Afghanistan Operation skill, HSE, E-language ,etc 15000
In addition to the sourcing and hiring of experienced, qualified management and technical staff
currently employed within the Ministry, additional hiring will be done at the university level. The
recruiting of personnel must provide several candidates with the necessary levels of training,
expertise and experience to develop into field managers. In the hydrocarbons operations
disciplines there will be candidates working in Afghanistan and abroad who will be selected for
development into a field management role during the first three years of the EPSC.
In the first three years, CNPCIW will arrange Students abroad, Governor Officers of mine ministry,
managements, Engineers and technicians take part in training in china or in Afghanistan, in next
five years, we will arrange an another long term training plan according to the development of AD
project, there are the particular description in follow chart:
10494821v3 !! PAGE H6-1
AD PROJECT LONG TERM TRAINNING PLAN
{£&% a? ffl&B'tl'S] 2012 2013 2014 2015 2016 2017 2018 2019
34 3lb2b3|34 3lb2b3l34 3lb2|Q3|Q4 3lb2b3b4 3l|Q2|Q3|Q4 3lb2b3(Q4 ai|Q2|Q3|Q4
Qlb2b3|Q4
i Training schedule planning 2012^070030 2019^090300 □SuE
~2 2012^090 030 2019^090 300
Students abroad
/ X yeai2012 two students 2012^09^030 2012^12^040
X yeax2013 two students 2013^01^310 2013^12^030
X yeai20l4 two students 2014^01^310 2014^12^030
X 2nd, 5year 2015^02^020 2019^09^300 lULMli.I.UUiU ..............I
X Governor Officer 2012^070030 2019^f090 30 0 0
X year2012 two pezsons 2O124pO7fjO30 2012^08^080
X yeax2013 two persons 2013^07^030 2013^09^250
X yeai2014 two persons 2014^07^020 2014^09^300
X 2nd, 5year 2015^02^020 2019^09^300 : Lii.uimiiihiimiiniliiiiinui.iiiiiiimiiimiii'aiiiimuJ
X Management 2012^100 080 2019^090 300
X yeax2012 5persons 2012^10^080 2012^12^180
X year2013 lOpersons 2013^04^020 2013^06^260
X year2014 15persons 2014^04^030 2014^06^300
X 2nd, 5year 2015^02^020 2019^09^300 UmilmimillUn,i.lull)lllillnimiiL)ll
X Engineers & Professionals 2012^100 080 2019^090300 w=
X year2012 lOpersons 2012^10^080 2012^12^ 180 o
X year2013 20persons 2013^05^080 2013^10^300 -
X year2014 20persons 2014^05^080 2014^10^300
X 2nd, 5year 2015^02^020 2019^09^300
X technician 2012^090 050 2019^090 300
X year2012 50persons 2012^09^050 2012^12^180
X year2013 lOOpersons 2013^03^040 2013^09^270
X yeax2014 150persons 2014^03^050 2014^10^300
X 2nd, 5year 2015^02^020 2O19£pO9^3O0
❖
E5@: TRAINNING PLAN 1. mpp .......... ................ WS
0*8: 2Oll^El20O80
v *" v £j]pg O
10494821v3 !! PAGE 7-L
EXHIBIT G
BIDDING FORM
G-l
Exhibit IV: Bidding Form
AMU DARYA OIL TENDER OF 2011
BIDDING FORM
Ministry of Mines of the Islamic Republic of Afghanistan
Kabul
Islamic Republic of Afghanistan
BIDDER: Consortium-pf CNPC international. Ltd, and Watan.,Oil and Gas, Ltd.
ROYALTY BID:. Fifteen percent f 15.000 %1
The undersigned, CNPC International, Ltd. and Watan Oil and Gas Ltd., hereby
unconditionally commit that, if selected as the winning bidder in the above-
referenced tender process, they will cause a company organized under the laws of
the Islamic Republic of Afghanistan and wholly owned by them to enter into the
Exploration and Production Sharing Contract (the "EPSC") in the final form
distributed to the bidders in the above-referenced tender process, with the royalty
referred to in Section 10.1 of the EPSC being the percentage indicated above. Unless
such period is extended by the Ministry, the EPSC shall be executed no later than
thirty (30) days after notification by the Ministry of award of the EPSC. The
undersigned acknowledge that non-compliance with the obligation set forth above
shall result in a drawing on the Bid Guarantee.
Zhu Xiangdong Ahmad Rateb Popal
Representative of CNPC International, Ltd. Representative of Watan Oil and Gas Ltd.
9470803v2
EXHIBIT H
MINIMUM EXPLORATION PROGRAMME;
MINIMUM PRODUCTION REQUIREMENTS FOR
DESIGNATED FIELDS
EXHIBIT H
MINIMUM EXPLORATION PROGRAMME;
MINIMUM PRODUCTION REQUIREMENTS
FOR DESIGNATED FIELDS
I. Minimum Exploration Programme
The Contractor shall perform the following minimum Exploration Operations during the
Exploration Phase:
Block 2D Seismic (km) Wells
Initial
Kashkari 100
Exploration 3
Period Bazarkhami 100
Zamarudsay 100
First
Kashkari 100
Extension 3
Period Bazarkhami 100
Zamarudsay 100
Second Kashkari 100
Extension
Period Bazarkhami 100 3
Zamarudsay 100
For purposes of the foregoing and for calculation of the amount of the Financial
Guarantee required pursuant to Section 3.1(a), each kilometer of 2D seismic survey shall
be deemed to have a value of US$30,000; each square kilometer of 3D seismic survey
shall be deemed equivalent to 3 kilometers of 2D seismic survey; and each Exploration
Well shall be drilled to the Hauterivian horizon and shall be deemed to have a value of
US$2,000,000. The Contractor may drill the required Exploration Wells in any portion
of the Contract Area outside of the Designated Fields. The Ministry may grant credit for
Wells that do not reach target depth in accordance with Section 5.4(k). The amount of
any seismic surveys undertaken or Exploration Wells drilled in excess of the required
minimum Exploration Operations for any given period shall be carried forward to the
next period and shall be taken into account to satisfy the required minimum Exploration
Operations and/or calculate the amount of the Financial Guarantee required for such
subsequent period.
II. Minimum Production Requirements for Designated Fields
The Contractor shall meet the minimum cumulative production requirements from each
of the Designated Fields during the Years indicated under either Option 1 or Option 2
below. The Contractor shall elect either Option 1 or Option 2 in the manner prescribed
by Section 6.4 of this Contract. Liquid Hydrocarbons produced during production testing
shall not be counted toward satisfaction of the minimum cumulative production
requirements.
Option 1
Designated Cumulative Production
Field (thousand barrels of Liquid Hydrocarbons)
Year 1 Year 2 Year 3 Year 4 Year 5
Kashkari
Field 50 1400 3000 5000 7000
Angot
Field 100 250 400 500 600
Aq Darya
Field 0 0 500 1500 2700
Bazarkhami 0 0 0 100 200
Field
Zamarudsay
0 0 0 300 1800
Field
Option 2
Designated Cumulative Production
Field (thousand barrels of Liquid Hydrocarbons)
Year 1 Year 2 Year 3 Year 4 Year 5
Kashkari 0 1400 3000 5000 7000
Field
Angot 100 250 400 500 600
Field
Aq Darya 50 1050 2250 3500 4700
Field
Bazarkhami 0 0 0 100 200
Field
Zamarudsay 0 0 0 300 1800
Field
H-4